    Docket No. 26-08-06 Page 27 parties. The Authority is unconvinced that such a change could avoid customer delays because, as Save the Sound notes, the customer receiving infrastructure incentives is reliant on the incentive application be processed, approved, and subsequently having the EV charging infrastructure installed before becoming eligible to participate in managed charging. Accordingly, the Authority does not adopt the Eversource’s proposal to modify the Residential Program workflow. E. LOAD OPTIMIZATION, COST-AVOIDANCE AND FULL VALUE POTENTIAL 1. Value Stack and Load Optimization Report The current Residential Single-Family Managed Charging Program focuses on peak avoidance by reducing charging during hours that are generally coincident with the ISO-New England system peak load. Year 5 Decision, p. 43. In the Year 5 EV Charging Proceeding, the Authority considered the benefits of load optimization, and asked participants and stakeholders to comment on the cost-avoidance and full value potential of the Program’s managed charging components throughout the proceeding. Id., p. 44. In doing so, the Authority referenced a report from ev.energy and the Brattle Group titled “The Utility Playbook: Turning EV Grid Risk into a $30 Billion Opportunity,” which includes a “cost-avoidance stack” which shows the full cost-avoidance potential of an actively managed EV (ev.energy Playbook).14 Id. The Authority also referenced other societal value streams such as environmental, health, and economic. Id. The Authority sought comments on how the potential value of the Program to the public, especially non-EV owners, could be better communicated, and what Program modifications or additions could be made to support unlocking greater benefits over time. Id. While the Program proved to be successful over the first cycle, as illustrated by the EM&V Program Cycle Report submitted in Docket No. 24-08-06,15 the full value and costavoidance potential of the Program going forward appear to be substantial for Connecticut. Year 5 EV Decision, p. 46. However, the Authority understands that not every value stream will be immediately realizable, and that the avoided cost calculation necessitates a sufficiently long-term perspective. Id. Therefore, the Authority ordered the EDCs to include in the Annual Report: A report summarizing the EDCs’ analysis of the national, regional, and state studies provided by OCC and ChargeScape, recommendations made by ChargeScape and ev.energy regarding near-term future steps to build upon the Program design, and conversations with EDC Transmission and distribution system operators as discussed in Section IV.F.1, Value Stack and Load Optimization. Additionally, the EDCs shall submit a proposal detailing the EDC’s findings and recommended next steps. This proposal ev.energy and the Brattle Group, “The Utility Playbook: Turning EV Grid Risk into a $30 Billion Opportunity,” p. 12, www.ev.energy/en-us, available at: https://www.ev.energy/en-us/resources/value-ofmanaged-charging. 15 See Year 4 Decision, pp. 6–8. 14
  2. Page 32 of 46

    Docket No. 26-08-06 Page 28 shall also provide details regarding the EDCs’ past, current, and planned future efforts towards load optimization. Id., p. 54 (Order No. 18.d.). The EDCs filed a report regarding the “value stack” and load optimization pursuant to Order No. 18d of the Year 5 Decision. See Annual Report, Att. 11. A review of national and regional literature concluded that managed charging’s benefits include avoided energy and capacity costs. Annual Report, Att. 11, pp. 2-3. Additionally, the literature indicates that the distribution value is highly conditional, with required conditions including EV penetration, coincident charging load peaks, and data availability. Annual Report, Att. 11, pp. 5-6. The EDCs and their EM&V partner recommend continuing to target system peaks and capture system capacity and avoided energy and emissions benefits as well as conducting analysis to estimate the potential for EVs to alleviate constraints at various areas of the distribution grid. Annual Report, p. 46. The assumptions in the current Benefit Cost Analysis are derived from estimated load reductions in the current program and avoided costs from the New England AESC 2021, and the EM&V partner recommended using the updated 2024 avoided cost data. Annual Report, Att. 11, p. 7. The EDCs also recommend that program refinement should evolve with the maturity of the EV market. Annual Report, p. 46. Specifically, the current program should continue to focus on increasing program participation, especially with active managed charging. Annual Report, Att. 11, p. 8. The EDCs are evaluating the opportunity for advanced program designs to provide additional distribution system value. Annual Report, p. 46. For example, UI has mapped active managed charging participants to circuits with known constraints. Annual Report, p. 46. There are several constrained circuits with 30 to 50 vehicles enrolled in managed charging, indicating that there is sufficient participation to evaluate localized load-management approaches. Annual Report, p. 48. Eversource began testing localized managed charging and demand response strategies in its Massachusetts service territory in 2026. Id. As an initial step, the EDCs propose targeted participant recruitment on selected circuits to increase the potential distribution system benefits of the existing program. Annual Report, p. 46. The Program’s existing approach to managed charging may shift charging load, but can also create secondary peaks. Annual Report, Att. 11, p. 1. Ev.energy asserts that value stacking requires targeting specific customers who are connected to a specific circuit or distribution system. Ev.energy, October Written Comments, p. 5. Ev.energy also notes that the charging behaviors and functionalities to target specific customers are technically feasible today, but that implementation will require additional costs and modifications to program design. Id. Advanced managed charging functionality could include demand response at a circuit or substation level; TOU periods at the circuit or substation level; and generation-based charging periods. Id. According to ev.energy, these functionalities could be layered into existing programs to add value to the grid with minimal customer impact. Id.
  3. Page 33 of 46

    Docket No. 26-08-06 Page 29 OCC recommends the Authority direct the EDCs to develop and test approaches to quantify location-specific distribution value as participation and data availability improve. OCC, October 20 Supplemental Comments, p. 2. OCC recommends using the updated AESC 2024 avoided-cost values. Id., p. 3. DEEP agrees that the most updated AESC numbers should be used, and indicated that the 2027 AESC is expected to be released soon. DEEP, LiL Brief, p. 1. However, DEEP also highlights limitations of using the AESC data to evaluate EV managed charging, as it might overestimate active demand response projects that require customer behavior changes. Id. Additionally, DEEP contends that AESC is a regional New England study, and may not adequately reflect Connecticut-specific distribution system conditions, locational constraints, or marginal infrastructure costs. Id., p. 2. DEEP agrees that managed charging programs that allow for adaptation at an accelerated pace are potentially more likely to maximize the benefits of new technologies. DEEP, October 20 Supplemental Comments, p. 2. In responding to Order 18d, the EDCs did not provide detailed proposals, pilot designs, implementation plans, cost estimates, performance metrics, or timelines that would enable the Authority to evaluate specific program modifications intended to capture additional distribution system value. Without detailed proposals, the Authority is unable to review and evaluate how managed charging can cost-effectively provide localized distribution system benefits. Accordingly, the EDCs shall jointly file for review and approval by February 1, 2027 one or more proposed pilots designed to evaluate the ability of EVs to alleviate localized distribution system constraints. The proposal shall describe pilot design, including participant eligibility, enrollment and recruitment strategy, technology requirements, implementation schedule, and budget. The proposal should incorporate stakeholder recommendations from the instant proceeding and identify any program modifications necessary to implement the proposed pilot(s). By February 1, 2027 in Docket No. 27-08-06, Eversource must provide an update on the localized managed charging and demand response strategies used in Massachusetts. The update shall include an overview of the specific strategies and approach, as well as lessons learned from the approach. The EDCs shall also use the most recent vintage of avoided cost data for the AESC. 2. Fast Track Process The EDCs proposed a Fast Track approval process for managed charging pilots and tests that satisfy established eligibility criteria. Annual Report, pp. 51–52. Eligible pilots or tests would be submitted by the EDCs as a joint or individual motion by May 1 of each annual program review proceeding. Annual Report, p. 51. Each proposal would include a clear objective, scope, budget, and evaluation metrics and be subject to the Authority’s review, including stakeholder comments, technical meetings, and discovery. Id. The EDCs would seek a ruling on the proposal within the annual proceeding, ahead of the timeline that would otherwise apply to the existing Annual Report process. Id. The intention of the process is to reduce iteration time while maintaining the same level of rigor and review. Tech. Mtg. Tr. 33:9-11. The EDCs’ proposed Fast Track process is illustrated in Figure 1, below.
  4. Page 34 of 46

    Docket No. 26-08-06 Page 30 Figure 1: Proposed Fast Track Process Program Design Filing Authority Review and Analysis Authority Approval Program Implementation EDC Corresp. Oct. 9, 2036, p. 16. Ev.energy suggests that Connecticut is now nearing ~3% EV market adoption, approaching what studies have identified as market adoption tipping points of 5-10% where managed EV charging optimized for local capacity constraints have been shown to reduce grid impacts. Ev.energy Comments, October 5, 2026, p. 3. Ev.energy supports the proposed Fast Track process, stating that it could be used to rapidly develop, deploy, and evaluate additional managed charging functionality to address targeted system constraints. Id. As ev.energy notes, the market penetration of EVs and associated charging infrastructure is approaching a point where the Authority and the EDCs will need to evolve managed EV charging deployment to optimize for local capacity constraints. It will be essential to consider the pace at which these efforts are proposed, reviewed, approved, and implemented. However, as noted in Section IV.E.1 of this Decision, no such efforts have been recommended to date. Therefore, the Authority deems proposed modifications to the regulatory approval process for such efforts premature. Accordingly, the Authority declines the EDCs general proposal for a Fast Track approval process; however. the EDCs may propose pilots using a Fast Track process or similar process when appropriate circumstances arise. The Authority will review such proposals on a case-by-case basis. F. MARKETING AND OUTREACH 1. Point-of-Purchase Enrollment In light of the new income requirements promulgated by Public Act 25-173, improved efforts in marketing and outreach and streamlining the enrollment process will be critical to continue managed charging enrollment momentum and scaling the number of participants. Year 5 Decision, p. 22. The Authority examined how the Program can reach EV owners at or after the point of purchase to establish an early enrollment pathway for the Program’s incentive and managed charging programs. Id., p. 40. More specifically, the Authority explored how an enrollment pathway for the Program’s incentive and managed charging programs could be established through the point of purchase via brochures, or through automobile OEM apps, such as Toyota’s EV Charge Assist. Id. Concerns remained that the large reduction in residential upfront incentive participation may negatively impact managed charging enrollment, necessitating re-examination of the enrollment incentive and other relevant Program structures. Id., p. 42. Therefore, the Authority ordered the EDCs to jointly file a proposal detailing each Company’s current efforts to reach EV owners at or after the point of purchase to establish
  5. Page 35 of 46

    Docket No. 26-08-06 Page 31 an enrollment pathway for the Program’s upfront incentive and managed charging programs, and proposing how the EDCs can collaborate to expand efforts to consistently deploy strategies and build relationships with Auto and EVSE OEMs. Id., p. 53. Pursuant to Order 16, the EDCs filed Motion No. 7 describing current efforts to reach EV owners at or after the point of purchase and on their collaboration with OEMs. Motion No. 7, May 15, 2026. The EDCs note that customers increasingly conduct research and decisionmaking activities prior to entering an automotive dealership, and often arrive at the point of sale (POS) with established preferences, instead of relying on in-dealership education as a primary source of information. Id., p. 2. The EDCs’ experience with dealerships has shown that individualized engagement, requiring ongoing coordination and negotiation, is necessary to align managed charging enrollment pathways with dealer operations and OEM requirements. Id., pp. 2–3. The variability in dealership participation, differences in OEM policies regarding third-party program promotion, the need for relationship-based engagement with dealership ownership and staff, and operational variability in how EV deliveries are conducted and communicated to customers constrain the channel of dealership engagement and scalability. Motion No. 7, p. 3. The EDCs plan to provide interested dealerships with a flyer featuring Program rebates and managed charging offerings, explore light-touch promotional materials such as branded air freshener with QR codes, and collaborate with the Connecticut Automotive Retailers Association “to broaden dealership engagement through potential newsletter placements, information sharing and dealership awareness or training opportunities”. Id., pp. 3–4. After the POS, the EDCs promote managed charging broadly, and use more targeted channels to engage customers who are likely eligible for rebates. Id., p. 4. “[T]he Companies use established community and partner channels, attend community events, and conduct webinars and other publicly available events in efforts to broaden program visibility and drive enrollment.” Motion No. 7, p. 5. Moving forward, the EDCs are investigating cross-promotion opportunities with the Connecticut Hydrogen and Electric Automobile Purchase Rebate (CHEAPR) program. Id., p. 5. Additionally, “[b]ecause statewide publicly available EV registration data does not include customer specific information that would allow for targeted marketing efforts, the EDCs are exploring whether access to municipal Assessor Grand Lists with EV registration indicators is feasible.” Id., p. 6. The EDCs are also engaged in various partnerships and collaborations. They are partnering with automakers and EVSE manufacturers to reach customers when they are most engaged with their new device. Id. Additionally, the EDCs are: • • Holding joint monthly meetings to coordinate customer engagement. Motion No. 7, p. 7. Exploring targeted email recruitment campaigns through ChargePoint (one of the leading residential EVSE manufacturers by installed units) to reach customers at the point of charger registration and on an ongoing basis thereafter. Id.
  6. Page 36 of 46Match

    Docket No. 26-08-06 • • • Page 32 Exploring a multi-channel partnership with Emporia (a growing residential EVSE manufacturer) that includes both in-app promotion and targeted email campaigns. Id., pp. 7–8. Developing direct, in-app enrollment integration through Tesla’s Partner Program which will allow Tesla Wall Connector owners to discover and enroll in the EDCs' managed charging program directly within the Tesla app, without leaving the OEM experience. Id., pp. 8–9. Actively pursuing recruitment-oriented partnerships with other automakers. Motion No. 7, p. 9. In 2025, Eversource spent $326,206 on Education and Outreach activities. Annual Report, Att. 7. In 2025, UI spent $412,933 on Education and Outreach activities. UI Jan. 15, 2026 Compliance, Order No. 13, Att. 1. Ev.energy confirms that a variety of engagement strategies are necessary to increase enrollment and supports the EDCs’ outreach and education activities. Ev.energy Comments, Oct. 5, 2026, p. 4. Ev.energy highly recommends leveraging the CHEAPR program as a source of customer information and a marketing platform for program outreach. Ev.energy Comments, July 30, 2026, pp. 1–2. OCC appreciates the proactive effort the EDCs are making to engage customers. OCC Comments, July 30, 2026, p. 1. However, OCC notes that implementation costs were not specified for the proposed outreach efforts. Id., pp. 1–2. OCC recommends that the EDCs track costs, referrals, completed enrollments, and conversion rates with each outreach channel. Id. p. 2. Save the Sound also appreciates the multiple strategies that the EDCs are pursuing to promote enrollment in managed charging, particularly with the CHEAPR program, a particular opportunity they believe could have been addressed much earlier. Save the Sound Comments, July 30, 2026, p. 3. Save the Sound recognizes the structural and practical challenges in coordinating and cross-promoting with motor vehicle dealerships but asserts that such activities can provide benefits to both parties. Id., p. 4. The Authority finds that the proposed outreach and enrollment activities represent reasonable efforts to increase customer awareness and participation in the Program. However, the Authority agrees with OCC’s recommendation that the EDCs track costs, along with referrals, completed enrollments, and conversion rates, to help inform, scope, and focus a more efficient marketing strategy. Accordingly, the Authority approves Motion No. 7, with modifications to the tracking of each marketing strategy discussed above. G. NORTH AMERICAN CHARGING STANDARD 1. Proposal The Program Manual outlines requirements for eligible EV charging infrastructure. EDC Compliance, May 18, 2026, Program Manual Clean, pp. 50–58.
  7. Page 37 of 46

    Docket No. 26-08-06 Page 33 On June 11, 2026, Tesla requested that PURA modify the Program Manual to explicitly include J3400 charging connector, or North American Charging Standard (NACS), as an approved standard to receive incentive funds. Tesla Corresp., June 11, 2026. 2. Stakeholder Comments Ev.energy supports Tesla’s request to accept the NACS connector as an approved standard. Ev.energy Comments, October 5, 2026, p. 7. Ev.energy states that most automakers have committed to develop new EVs with the NACS connector. Id. However, ev.energy also notes that many existing EVs have non-NACS connectors and rely on nonNACS chargers and believes that continuing to provide a level of EV charging coverage for those owners is appropriate. Id. OCC also supports Tesla’s request to accept the NACS connector as an approved standard given the formal standardization and growing market adoption. OCC Comments, October 20, 2026, p. 4. However, OCC suggests that there should be a distinction between NACS eligibility and a policy of NACS-only development and recommends consideration of an interoperability requirement during the transition to NACS charging infrastructure. Id. Tesla noted that New York recently adopted the NACS connector as an approved standard. Tesla Comments, October 5, 2026, p. 1. Tesla also noted that New Jersey is considering the adoption of the NACS connector as an approved standard as well as the approval of Tesla’s Megawatt Charging System (MCS). Id. Tesla recommends that the Authority make the same consideration. Id., pp. 1–2. 3. Authority Analysis The Authority recognizes that the EV charging connector landscape undergoes periodic changes, and that presently, many automakers are adopting NACS as the native charging connector for new vehicles. As such, adopting the NACS connector as an approved standard in Connecticut will ensure that current and future EVs are compatible with this growing charger format. While EV charging infrastructure will need to continue serving vehicles with previously approved EV charging connectors, the Authority approves the addition of NACS to the approved charging standards for the Program. Accordingly, the Authority directs the EDCs to include the NACS as an approved charging standard in the 2027 Program Manual. H. MUD MANAGED CHARGING The Authority directed the EDCs to implement a MUD Managed Charging Pilot using a direct-to-driver charging option no later than January 1, 2025. Year 3 Decision, pp. 43–44. The direct-to-driver approach allows EV drivers at MUDs to directly engage with a managed charging offering through either (1) their vehicle’s telematics or (2) by using the EVSE with radio frequency identification (RFID). Id., p. 41. The EDC MUD Managed Charging Pilot, approved in the Year 4 Decision, includes a three-phased approach. See Year 4 Decision, p. 12 (description of the three phases).
  8. Page 38 of 46

    Docket No. 26-08-06 Page 34 The MUD Managed Charging Pilot, which began its Phase 1 offering in January 2025, allows participants to enroll their telematics-compatible EV to earn a $50 up-front enrollment incentive, and a $10 ongoing incentive for each month that the customer charges less than 20% of the time during peak hours, defined as 3pm–9pm on nonholiday weekdays. Year 5 Decision, p. 34. As of June 2025, four participants were enrolled in the Eversource pilot and none were enrolled in the UI pilot. Id. In the Year 5 EV Charging proceeding, the EDCs stated that they were executing Phase 2, which expands the pilot by connecting to EV drivers through eligible EVSE at their MUD site, enabled by the site host. Id. The EDCs planned to launch Phase 3 of the MUD Managed Charging Pilot in the fourth quarter of 2025. Id. On July 18, 2025, the EDCs jointly submitted a motion requesting that the Authority grant a 12-month extension from August 1, 2025, to August 1, 2026, to file compliance with Order No. 2 of the standing orders of the Year 4 Decision.16 The Authority approved the proposal to extend the MUD Managed Charging Pilot offering from the end of 2025 to the end of 2026. Year 5 Decision, p. 37. Therefore, Order No. 6 directed the EDCs to jointly submit the results of the MUD Managed Charging Pilot offering and a final program design by August 1, 2026.17 Year 5 Decision, p. 51. Order No. 6 of the Year 5 Decision directed the EDCs to file a final program design proposal for MUD Managed Charging. See Motion No. 9. Additionally, pursuant to Order No. 118 in the July 1, 2026 Decision in Docket No. 22-08-07, Innovative Energy Solutions Program Cycle 01 (IES Cycle 1 Decision), the EDCs filed a motion for review and approval (Motion No. 8) regarding scaled deployment of AmpUp’s Innovative Energy Solutions (IES) project. 1. MUD Pilot Findings The EDCs report that the MUD Pilot has successfully demonstrated the underlying technological approach and program administration necessary to support MUD managed charging. Motion No. 9, p. 2. Capabilities demonstrated included integrating shared 16 Order No. 2: See Year 3 Decision, November 29, 2023, Docket No. 23-08-06, p. 62. No later than August 1, 2025, the EDCs shall jointly submit to the Authority for review and approval the results of the MUD Managed Charging Pilot offering and a final program design, as directed in Section IV.F.3 of the Year 2 Decision, and Section IV.C.3.c [of the Year 3 Decision]. 17 Order No. 6: “See Year 3 Decision, November 29, 2023, Docket No. 23-08-06, p. 62; see also, supra Section IV.D, MUD Pilot Program. No later than August 1, [2026], the EDCs shall jointly submit to the Authority for review and approval the results of the MUD Managed Charging Pilot offering and a final program design, as directed in Section IV.F.3 of the Year 2 Decision, and Section IV.C.3.c [of the Year 3 Decision]. [This motion for review and approval shall be filed in Docket No. 26-08-06, Annual EV Charging Program Review - Year 6 (2026 Annual Review Docket).]” Year 5 EV Decision, p. 51. 18 Order No. 1: “No later than August 1, 2026, AmpUp, UI, and Eversource shall jointly submit, for review and approval in Docket No. 26-08-06, information regarding AmpUp’s project and recommendations for its scaled deployment within the MUD managed charging final program design, including: a. a discussion of the advantages and disadvantages of direct-to-driver and network-to-driver managed charging; b. options and recommendations for incorporating the NSP aggregator approach into a final MUD managed charging program design; c. considerations for including additional types of public Level 2 chargers in the scaling implementation design, in addition to MUD chargers; d. recommended site host incentives; and e. estimated costs and timelines for scaled implementation.” IES Cycle 1 Decision, p. 31.
  9. Page 39 of 46

    Docket No. 26-08-06 Page 35 charging infrastructure from participating network service providers into a managed charging platform, collecting and validating charging session data, associating charging activity with individual participating drivers, supporting telematic-based and chargerbased enrollment pathways, and developing managed charging functionality which can accommodate future load management objectives. Id., p. 3. Data for the MUD Pilot, while limited, suggests that participants are consistently following price signals, charging more than 80% of the time during off-peak hours. Annual Report, pp. 16–17. However, expansion opportunities for MUD managed charging are constrained by challenges with site acquisition, as well as host and customer engagement. Id. As of June 2026, there were still only five participants enrolled in Eversource territory and two enrolled in UI territory. Annual Report, p. 16. The EDCs suggest that future program success will be largely driven by the improvement of customer acquisition and engagement strategies, as opposed to further technical capabilities. Id., p. 4. 2. EDC Proposal The EDCs propose continuation of the MUD Managed Charging Pilot through December 2028, maintaining existing telematics and site-host participation pathways while introducing an additional NSP-facilitated participation model. Motion No. 9, p. 5. The NSP model will be implemented by scaling the AmpUp pilot from IES Cycle 1, which the EDCs filed as Motion No. 8 in the instant docket. Id. The AmpUp pilot ran from February 2024 to August 2025, during which it deployed its “Adapt and Earn” project across 214 locations, 1,010 ports, and saw participation from 154 unique drivers. IES Cycle 1 Decision, pp. 12–13. The EDCs propose making the existing $250 site-recruitment incentive available to support NSP-facilitated site recruitment activities that result in successful enrollment of qualifying MUD charging locations. Motion No. 9, p. 7. The NSP would only receive the incentive once the enrolled driver or site has delivered two qualifying sessions. Motion No. 8, p. 13. The EDCs proposed a session-based performance incentive for MUD Pilot participants, where incentives would remain tied to off-peak charging behavior, but would be evaluated on a charging-session basis, rather than a monthly basis. Motion No. 9, pp. 5–6. Participants would be eligible to earn $1-3 per charging session. Id., p. 6. A persession approach could provide a clearer and more immediate connection between participant behavior and incentive eligibility. Id. Incentives would be offered under the following conditions: • • • A charging session duration must be 80% or more during the off-peak period; On-peak is defined as 3 to 9 pm on non-holiday weekdays; A charging session must consist of 10 kWh or more in energy delivered to the vehicle;
  10. Page 40 of 46

    Docket No. 26-08-06 • • Page 36 One opportunity per day to earn an incentive, capped at $10 per month; and Customers may bank their incentives for direct monthly payments or choose to credit their NSP charging account. Id. UI reports that its estimated 2026 Budget for Residential Managed Charging (Including MUD Pilot 2025) was $465,560. Annual Report, Att. 8. Eversource reports that its 2026 Program Budget for Residential Managed Charging was $1,554,500. Annual Report, Att. 7. The estimated cost, subject to revision as planning progresses, to implement the NSP model is approximately $150,000 in 2027. Motion No. 8, p. 14. 3. Stakeholder Comments Ev.energy agrees that the MUD managed charging pilot is working as intended; Technical feasibility was demonstrated for the programs, the underlying technology and program administration necessary to support it are viable, and participants are consistently limiting their on-peak charging to less than 20%. Ev.energy Comments, Oct. 5, 2026, p. 6. Ev.energy is actively collaborating with AmpUp and supports collaboration with other NSPs as an effective way to connect with existing and potential locations for EV charging. Id., p. 7. Ev.energy highlights the need to scale MUD managed charging and to reach more drivers by expanding to more locations. Id. DEEP agrees with the EDCs’ recommendations to continue and enhance the MUD Pilot through December 2028, including PURA’s direction regarding the AmpUp solution. DEEP Comments, October 5, 2026, p. 6. DEEP believes the enhanced pilot should be large enough in terms of participants to provide a valid statistical basis to inform decisionmaking and possible statewide deployment. Id., pp. 6–7. DEEP recommends more extensive use of NSPs, including the AmpUp approach, to recruit MUD Pilot charging sites. Id., p. 7. DEEP also supports the use of existing site-recruitment incentives to support successful NSP-facilitated recruitment. Id. Finally, DEEP expressed concerns about switching from a monthly performance incentive to a session-based incentive. Id., p. 6–7. DEEP contends an informed decision on this proposal is not possible without knowing whether administrative costs would increase with a more complex eligibility structure, whether there is evidence that the proposed per-session incentive framework would increase program enrollment, and whether a similar structure exists in other states. Id. p. 8. OCC views the results of the MUD Pilot as promising for peak and load reduction but maintains that the sample size remains too small at this point to draw definitive conclusions. OCC Comments, October 5, 2026, p. 3. OCC supports the inclusion of AmpUp’s proposed incentive structure but recommends that the EDCs more systematically evaluate how the proposed $1-$3 per session affects customer response. Id. Such an analysis would provide the Authority with a stronger basis for determining the incentive level that is most cost-effective for ratepayers. Id., p. 4.