A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
ScheduleFiled

Docket schedule (dates for hearings, deadlines, and decisions)

Part of

Docket 26-10-09Open

Application for Cellco Partnership d/b/a Verizon Wireless for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way Cos Cob SC1 CT

Type of filing
Schedule (Docket schedule)
Date filed
November 17, 2026
Filed by
Not recorded
Files
0
As listed on the current system: TS External [26-10-09] [WABHS] Last Revised: 11/17/2026

This filing on the current system (opens in a new tab)

Files

No files are attached to this filing.