Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Plans for CWC's proposed Hartung Well Field Pump Station , Iron & Manganese/Radon Removal, Treatment Addition, CWC Drawings SL-302 through SL-308.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 01/24/1997 [88-04-27] Order No.1 / / Plans for CWC's proposed Hartung Well Field Pump Station , Iron & Manganese/Radon Removal, Treatment Addition, CWC Drawings SL-302 through SL-308.

This filing on the current system (opens in a new tab)