Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

To CL&P, questions 33 thru 35

Interrogatories

Filed by DR

Part of

Docket 91-12-07Closed again

DPUC Invvestigation into the November 6, 1991, Outage at Millstone Unit No. 2 and Related Pipe Inspection Program at All Four Connecticut Nuclear Plants

Type of filing
Interrogatory (Interrogatories)
Date filed
May 10, 1996
Filed by
DR
Files
Not listed yet

As listed on the current system

Interrogs from DR to CL&P 33 thru 35-Issued 05/10/1996 [91-12-07]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)