A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
InterrogatoriesFiled by EL

To CL&P thru

Part of

Docket 91-12-07Closed again

DPUC Invvestigation into the November 6, 1991, Outage at Millstone Unit No. 2 and Related Pipe Inspection Program at All Four Connecticut Nuclear Plants

Type of filing
Interrogatory (Interrogatories)
Date filed
September 7, 1995
Filed by
EL
Files
Not listed yet
As listed on the current system: Interrogs from EL to CL&P thru -Issued 09/07/1995 [91-12-07]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)