Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 5

Load factor & Capacity utilization calculation, duration curve for 12 months ending 9/30/95

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 10/31/1995 [94-01-12] Order No.5 / / Load factor & Capacity utilization calculation, duration curve for 12 months ending 9/30/95

This filing on the current system (opens in a new tab)