Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Company does not plan to cross examine scheduled witnesses for the other utilities in the above referenced docket.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 07/07/1995 [95-02-03] () - Company does not plan to cross examine scheduled witnesses for the other utilities in the above referenced docket.

This filing on the current system (opens in a new tab)