Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

The OCC is a party in the above docket. OCC has determined that additional expertise in the fowlliwng areas is required to enable the OCC to fulfill its statutory mandates of Section 16-2a

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 04/11/1995 [95-02-07] () - The OCC is a party in the above docket. OCC has determined that additional expertise in the fowlliwng areas is required to enable the OCC to fulfill its statutory mandates of Section 16-2a

This filing on the current system (opens in a new tab)