Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Company stipulates that any rate decrease resulting from the Phase two Hearing shall be effective no later 9/28/98.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 02/05/1998 [98-01-02] () - Company stipulates that any rate decrease resulting from the Phase two Hearing shall be effective no later 9/28/98.

This filing on the current system (opens in a new tab)