Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

CL&P notes that a late-filed hrg is not needed. Also, Co does not intend to file a brf but reserves its right to file written exceptions or comments to the Draft Decision

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 04/13/1998 [98-02-10] () - CL&P notes that a late-filed hrg is not needed. Also, Co does not intend to file a brf but reserves its right to file written exceptions or comments to the Draft Decision

This filing on the current system (opens in a new tab)