Witness: Gary A. Long
Filed by ORIGINAL FILER SUBMISSION: [None] --- SPONSOR: [CL&P]
Part of
DPUC Invvestigation into the November 6, 1991, Outage at Millstone Unit No. 2 and Related Pipe Inspection Program at All Four Connecticut Nuclear Plants
- Type of filing
- Testimony (Prefiled testimony)
- Date filed
- July 30, 1998
- Filed by
- ORIGINAL FILER SUBMISSION: [None] --- SPONSOR: [CL&P]
- Files
- Not listed yet
As listed on the current system
Prefiled testimony: 07/30/1998 - Sponsor: ORIGINAL FILER SUBMISSION: [None] --- SPONSOR: [CL&P] / Witness: Gary A. Long [98-06-13]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)