Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 083

Request for a Waiver of the Installation Interval Standard for February 2026

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 083 03/30/2026 (Verizon New York Inc.) - Request for a Waiver of the Installation Interval Standard for February 2026 [99-07-28]

This filing on the current system (opens in a new tab)