Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

A new plan must be submitted on or before 12/08/03.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 12/16/2002 [99-11-28] (DPH) - A new plan must be submitted on or before 12/08/03.

This filing on the current system (opens in a new tab)