Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

CL&P requests an extension of time till 4/26/2000 to respond to Interrogs EL-1 through EL-15.

Motion No. 001

Filed

Part of

DPUC Review of Electric Companies and Electric Distribution Companies Maintenance Plans for Transmission and Distribution Overhead and Underground Lines

Type of filing
Motion (Motion No. 001)
Date filed
April 18, 2000
Filed by
Not recorded
Files
Not listed yet

As listed on the current system

Motion No. 001 04/18/2000 () - CL&P requests an extension of time till 4/26/2000 to respond to Interrogs EL-1 through EL-15. [99-12-11]

This filing on the current system (opens in a new tab)