Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Search results

1,800 results

Showing 301–310 of 1,7910.34 seconds

  • OCC-905_Final.pdf

    Interrogatory responsesPDF · 187 KB · 14 pages

    Page 6 of 14

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 6 of 14 Category … escalate costs to the Rate Year amounts). This average annual expense of $4.097 million supports the Company’s proposed adjustment, increasing annual base distribution funding for pre-staging

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • David Vieira.pdf

    CorrespondencePDF · 128 KB · 1 page

    Page 1 of 1

    proposed rate is 26.13 an 84% increase. That would increase my bill from 269.56 to 349.11 a 77% increase in my overall bill.   TOO MUCH Also … there 2 demand charges?   I've called Eversource about this double charge, the representative was not able to tell what the charges where for and had to research

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • Docket No. 26-05-10 Motion for PO (DEEP Set 1).pdf

    Motion No. 107PDF · 243 KB · 8 pages

    Page 3 of 8 · matches on 2 pages

    Application of Yankee Gas Services Company d/b/a Eversource Energy to Amend Its Rate Schedules, (December 18, 2024 Ruling to Motion No. 5) (protecting as confidential Yankee’s CEII … Docket No. 16-06-04, Application of The United Illuminating Company to Increase Rates and Charges (August 9, 2016 Order on Motion No. 10) (protecting as confidential CEII

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC Set 16_COMBINED.pdf

    CorrespondencePDF · 1.2 MB · 148 pages

    Page 147 of 148 · matches on 13 pages

    Company has forecasted an increase in the rate year when the cost has decline from 2023-2025. Response: Eversource Energy Service Company (“ESC”) capital expenditures declined from … year, as provided on Exhibit CLP-REVREQ-3. The overall increase from 2021 and through the rate year is due primarily to the fact that ESC investment

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC Set 30_COMBINED.pdf

    CorrespondencePDF · 568 KB · 47 pages

    Page 14 of 47 · matches on 4 pages

    this is not the singular barrier, please describe all other barriers. Response: TOU rates require meters that record interval data, which bridge meters can record. The interval data … interval data. Eversource decided that the added cost for system upgrades to support collecting interval data from drive-by meter reading along with the increasing meter readers

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC-590 Attachment 3.pdf

    Interrogatory responsesPDF · 1.1 MB · 14 pages

    Page 1 of 14 · matches on 3 pages

    Town Scorecard Initiative which identifies the top 10 worst performing towns in Eversource, CT for SAIDI and SAIFI. Project CD02723 addresses the worst performing SAIDI and SAIFI towns … Summary/Project Options Comparison: Design Criteria Normal loads < 80% of UG rating Normal loads < 90% of OH rating Option 1 – Reduce Cust Zones 2 – Reconductor & Trim Required to meet

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC-962 Attachment 2.pdf

    Interrogatory responsesPDF · 11 MB · 128 pages

    Page 85 of 128 · matches on 32 pages

    decrease in the discount rate used to calculate the PBOP funded status, which resulted in an increase to the Eversource PBOP liability of $88.6 million. As of December … there was an increase in the discount rate used to calculate the funded status, which resulted in a decrease to the Eversource PBOP liability of approximately $88 million

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC Set 2_COMBINED.pdf

    CorrespondencePDF · 1.7 MB · 68 pages

    Page 43 of 68 · matches on 2 pages

    annual rate reconciliation filing in Docket Nos. 2X-01-03, PURA Annual Review of the Rate Adjustment Mechanisms. The semi-annual pole attachment rental rates are charged … pole attachment rental rates are designed to recover are shown in the Carrying Charge portion of the rental rate calculation disclosed in Exhibit CLP-RATES-2.14, page

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • EOE-371_Final.pdf

    Interrogatory responsesPDF · 191 KB · 9 pages

    Page 9 of 9 · matches on 3 pages

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-371 Page 9 of 9 unplanned … providing upfront, during this proceeding, indicative revenue increases necessary to support those investments while committing to cap resulting revenue increases during the PBMRP even if actual capital investment

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • S. Prince.pdf

    CorrespondencePDF · 31 KB · 1 page

    Page 1 of 1

    Pura.ExecutiveSecretary <[email removed]> Subject: Docket : 26-05-10 Please do not let Eversource run roughshod over us AGAIN. We are tapped out with energy costs. For my house, specifically … resistance heating can be insanely expensive. Please deny any and all rate increases. This company does not need to keep returning record profits — and keep us waiting

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules