Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Search results

1,800 results

Showing 571–580 of 1,7910.87 seconds

  • OCC-781_Final.pdf

    Interrogatory responsesPDF · 116 KB · 2 pages

    Page 2 of 2

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-781 Page 2 of 2 period … system, the impact of minor weather event days, aging infrastructure failures outpacing the rate of replacement, surrounding tree conditions and many other factors. In addition, at the time

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • 2-ETTCF19 PAF_Redacted.pdf

    Application supplementPDF · 473 KB · 4 pages

    Page 2 of 4

    Justification: The 2019 distribution prune program requires expenditures across all Eversource operating companies to address maintenance pruning and hazardous tree removals. These activities improve the system’s ability … risks associated with a failure to approve this program. Operationally, there is an increased risk of more vegetation caused outages, both on normal days and during adverse weather

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • 26-10-11 CIEC Letter in Support of Joint Petition for AI Proceeding.pdf

    CorrespondencePDF · 568 KB · 4 pages

    Page 2 of 4

    sword and a shield.”5 Bad actors have leveraged AI to increase the frequency and sophistication of attacks on utility systems, while AI also assists utilities with identifying … deployment in utility operations will be another focus of review in utility rate proceedings following the investigation advocated in the Joint Petition, an initial, statewide review is necessary

    Docket 26-10-11Petition of the Office of the Attorney General and Office of Consumer Counsel for Review of AI, Data Security, and Cybersecurity

  • UPA-001-SP01 Attachment 13 REDACTED.pdf

    Interrogatory responsesPDF · 4.6 MB · 14 pages

    Page 4 of 14 · the words are on different pages

    Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page … Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 4 of 14 Garage and shop equipment include electric hoists, hand tools, and (2) small compressed air plants

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • OCC-101-SP01_Final.pdf

    Interrogatory responsesPDF · 114 KB · 2 pages

    Page 1 of 2

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-01 Date Issued September 16, 2026 OCC-101-SP01 Page … Exhibit CLP-VMP-1, notes that the cost of the VMP is increasing, due to inflationary impacts on labor and equipment. a. Please provide current costs of labor

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • EOE-274_Final.pdf

    Interrogatory responsesPDF · 180 KB · 5 pages

    Page 1 of 5 · the words are on different pages

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-274 Page 1 of 5 Date … MS24F event. Finally, explain why some of the activity was performed at OT rates (e.g., pp. 98-100) and why the activity could not be performed by Eversource

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-177 Attachment 1 .pdf

    Interrogatory responsesPDF · 109 KB · 1 page

    Page 1 of 1

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-177 Attachment 1 Page 1 of 1 Illustrative Example … Award Percentage Calculated Long-Term Incentive Annual Expense Reference (escalated by 3% Merit Increase) Line 10 x Line 11 Line 12 / 3 Long-term ASC 718 Compensation Expense

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-002.pdf

    Interrogatory responsesPDF · 88 KB · 1 page

    Page 1 of 1

    MATTHEW P Request from: Public Utilities Regulatory Authority Question: (Interest Rate) What is the range of interest rates that the Company anticipates at the time of issuance? Additionally … weighted average interest rate for the issuance would be in the range of 5.65 percent. Based on the illustrative weighted average interest rate of 5.65 percent, the average

    Docket 26-04-04Financing Order for 2018-2023 Storm Costs of the Connecticut Light and Power Company d/b/a Eversource Energy

  • BETP-009_Final.pdf

    Interrogatory responsesPDF · 82 KB · 1 page

    Page 1 of 1

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-009 Page 1 of 1 Date … would be fixed at the Company's allowed base distribution revenue for the Rate Year, the current annual base distribution revenue inclusive of PBMRP Adjustments, or some other

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • EOE-383 Attachment 1.pdf

    Interrogatory responsesPDF · 1.3 MB · 125 pagesAlso attached to 1 other filing

    Page 75 of 125 · matches on 6 pages

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 75 of 125 Docket … Page 71 The Authority agrees with the OCC that increasing clearances may lead to more hazardous trees and may not be necessary if the tree cycle is reduced

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules