Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Search results

1,800 results

Showing 931–940 of 1,7910.48 seconds

  • EOE-5 Att. 31 16-052-U Direct Testimony of Robert Hevert with Exhibits.pdf

    Interrogatory responsesPDF · 1.9 MB · 141 pages

    Page 60 of 141 · the words are on different pages

    actions, including maintaining an 2 expanded balance sheet and keeping the Federal Funds rate low, have affected capital 3 markets and led to utility valuations that are elevated … uncertain, the 6 Q. Does your recommendation also consider the current interest rate environment? 7 A. Yes, it does. From an analytical perspective, it is important that

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • 2026.08 - VL Electric East PG Manual Data.xlsx

    Interrogatory responsesExcel · 176 KB

    Part 19 of 20 · the words are on different parts

    costs: | of | revenues. | ’25 | reported Avg.Indust.Revs.perKWH(¢) | NA | NA | NA | competitivegenerationbusiness.Acq’dAGLResources(renamed | deprec. | rates (utility): | 2.7%-3.4%. | Has | 27,300 employees. | Presi- CapacityatYearend(Mw) | NA | NA | NA | SouthernCompanyGas … Revenues | nywiderevenues)edgeduplessthan1%in ANNUALRATES | Past | Past | Est’d’23-’25 | probably | increased | 4%–5% | in | the | recent | the | March | term. | Sales | growth | and | cost ofchange(persh) | 10Yrs

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-166 Attachment 1.pdf

    Interrogatory responsesPDF · 7.4 MB · 297 pages

    Page 247 of 297 · matches on 2 pages

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 247 of 297 ACCOUNTING MANUAL … 186WH0 186X50 188100 188990 FERC Description NH-EAP-Def-Incremental-Expenses Deferred distribution rate increase Deferred Environ Litigation Costs Deferred incremental IT costs SFAS 133 Asset -Current Definite

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-163 Attachment 3.pdf

    Interrogatory responsesPDF · 3.2 MB · 129 pages

    Page 80 of 129 · matches on 7 pages

    increased number of capital projects, there has been an increase in contractor labor to provide the level of support required. Additionally, approximately $1 million of the increase … prior years. (d) The $6.4 million increase in Rate of Return is due to increased asset investments at Eversource Energy Service Company necessitated to: (1) enable business process

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 02.pdf

    Interrogatory responsesPDF · 91 MB · 1,137 pages

    Page 250 of 1,137 · matches on 3 pages

    emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3 … emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 02.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 75 of 76 · the words are on different parts Only the first part of this large file's text is searchable.

    x000D_ | Allocations Roll up-Z00 4N922141 | (50,0): GCC / EVERSOURCE SWITCHING | GCC / EVERSOURCE SWITCHING OUT PAD# 219 & PAD# 220 (DOUBLE TIME RATE)_x000D_ | Allocations Roll up-Z00 5D030401

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 03.pdf

    Interrogatory responsesPDF · 86 MB · 840 pages

    Page 160 of 840 · matches on 2 pages

    emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3 … emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 03.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 25 of 77 · the words are on different parts Only the first part of this large file's text is searchable.

    HARTFORD TRUCK RADION SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Benefits-B01 CT13D007 | MANCHESTER 3A LOWBAND REPEATER SYST | REPLACE BASE STATIONS … TRUCK RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Benefits-B01 CT13D008 | ROCKY HILL 3R LOWBAND REPEATER SYST | REPLACE BASE STATIONS

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 05.pdf

    Interrogatory responsesPDF · 87 MB · 879 pages

    Page 168 of 879 · matches on 3 pages

    emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3 … emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 05.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 26 of 77 · the words are on different parts Only the first part of this large file's text is searchable.

    create these displays in PI Vision, an existing visualization tool on the Eversource network. A new PI Asset Framework database will be developed. The structure of the dashboard … HARTFORD TRUCK RADION SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D007 | MANCHESTER 3A LOWBAND REPEATER SYST | REPLACE BASE

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules