Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Search results

1,800 results

Showing 961–970 of 1,7910.48 seconds

  • RRU-159 Attachment 21.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 68 of 76 · the words are on different parts Only the first part of this large file's text is searchable.

    Replcd 30 FT #2 oh svc_x000D_ | Taxes-T00 4N922141 | (50,0): GCC / EVERSOURCE SWITCHING | GCC / EVERSOURCE SWITCHING OUT PAD# 219 & PAD# 220 (DOUBLE TIME RATE)_x000D_ | Taxes

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 22.pdf

    Interrogatory responsesPDF · 89 MB · 1,203 pages

    Page 231 of 1,203 · matches on 3 pages

    emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3 … emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 22.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 76 of 77 Only the first part of this large file's text is searchable.

    switchgear are required to improve reliability by increasing the contingency load carrying capability of the substation and feeders. Eversource’s “SYS PLAN-010 Bulk Distribution Substation Assessment Procedure … keep the substation loading below 75% of the existing transformer’s nameplate rating. | Vehicle-V00 RGFDSR01 | DSCADA Sys Res Ridgefield | DSCADA System Resiliency Ridgefield | Vehicle-V00 CTMTRPNL | Timpson

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 23.pdf

    Interrogatory responsesPDF · 89 MB · 1,160 pages

    Page 255 of 1,160 · matches on 3 pages

    emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3 … emergency rating by 118% and 100% respectively. For loss of the 4A7, the 47N3 also exceeds the normal rating by 104%. Based on Eversource engineering standard, the 47N3

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RRU-159 Attachment 23.xlsx

    Interrogatory responsesExcel · 12 MB

    Part 75 of 77 · the words are on different parts Only the first part of this large file's text is searchable.

    x000D_ | Wholesale Expenses-W00 4N922141 | (50,0): GCC / EVERSOURCE SWITCHING | GCC / EVERSOURCE SWITCHING OUT PAD# 219 & PAD# 220 (DOUBLE TIME RATE)_x000D_ | Wholesale Expenses-W00 5D030401

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • The Reply Brief of The Connecticut Water Company (Docket No. 26-03-15).pdf

    BriefPDF · 219 KB · 44 pages

    Page 35 of 44

    demand charge increasing more than five-fold, and transmission demand rising by about 26%. OCC Brief at 72–73. OCC itself acknowledges that rates after … very difficult to accurately predict” given market volatility and Eversource’s pending rate case. Id. at 71. Accordingly, OCC leaves the Company’s averages in place

    Docket 26-03-15Application of the Connecticut Water Company to Amend its Rate Schedules

  • Docket No. 26-06-02 - GenConn Initial Brief 11.2.26.pdf

    BriefPDF · 354 KB · 41 pages

    Page 20 of 41 · the words are on different pages

    entitles GenConn to be “compensated at cost of service plus a reasonable rate of return on equity,” and “in an annual retail generation rate contested case…to recover … maintenance expenses, depreciation, fuel costs, taxes and other governmental charges and a reasonable rate of return on equity.” Further § 16-19e(a)(4) requires rates sufficient

    Docket 26-06-02GenConn Energy LLC Application to Establish 2027 Revenue Requirements

  • Exhibit GB II-2_LFE1.xlsx

    Late-filed exhibitsExcel · 606 KB

    Part 8 of 8 · the words are on different parts

    Schedule B-1.0 | Rate Base Summary -- Rate Year 2016 | WP B-1.0 WP B-1.0 | Rate Base Summary 13 Month Average Rate Base Calculation -- Rate Year … AFRR Final Decision) Schedule B-2.0 | Plant-In-Service by Major Property Grouping -- Rate Year 2016 | WP B-2.1 Schedule B-2.1 | Plant-In-Service by Account -- Rate

    Docket 26-06-03GBII New Haven LLC Application to Establish 2027 Revenue Requirements

  • RSR-032 Attachment 5.pdf

    Interrogatory responsesPDF · 24 MB · 65 pages

    Page 54 of 65

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 54 of 65 Initial Notification … concentrations detected in 2023. This increase in contaminant concentrations likely represent seasonal fluctuations and further sampling will confirm whether it is an increasing concentration trend. Following Site remediation

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

  • RSR-032 Attachment 9.pdf

    Interrogatory responsesPDF · 31 MB · 897 pages

    Page 6 of 897 · the words are on different pages

    Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 6 of 897 Tighe&Bond … Section 1 Background The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource) entered the Rockville Former Manufactured Gas Plant (MGP) site located at 13 Maple

    Docket 26-05-10Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules