Application of the University of Connecticut for Qualification of the University of Connecticut, Storrs Campus as a Class III Renewable Energy Resource
Decisions and notices4
What the Authority has issued in this docket, newest first.
Filings97
12 filings of the selected types
- PURA
- representing The University of Connecticut Storrs Campus
Corres. 06/30/2010 () - The Department finds that the information submitted by Kosine Engineering and Design, LLC (representing The University of Connecticut Storrs Campus) fulfills the requirement for Order No. 1.
- representing The University of Connecticut Storrs Campus
Corres. 03/29/2010 () - The Department finds that the information submitted by Kosine Engineering and Design (representing The University of Connecticut Storrs Campus) fulfills the filing requirement for Order No. 1.
- representing the University of Connecticut
Corres. 10/22/2009 () - The Department finds that the information submitted by Kosine Engineering and Design, LLC (representing the University of Connecticut) fulfills the requirement for Order No. 1.
- representing the University of Connecticut
Corres. 10/13/2009 () - The Department finds that the information submitted by Kosine Engineering and Design LLC (representing the University of Connecticut) fulfills the requirement for Order No. 1.
About this docket
- Docket number
- 08-10-24
- Status
- Closed December 17, 2008
- First filing
- November 19, 2008
- Latest filing
- October 21, 2026
- Public filings
- 97
- Documents
- On the current system
Schedule
Dates for hearings, deadlines, and decisions.
- Docket schedule
Revised April 16, 2009
Search this docket
Reading a docket
- Motions ask the Authority for something; each gets a ruling.
- Interrogatories are written questions, usually from Authority staff; the answers are filed as responses.