Third quarter 2024 production report for the Lower Village Hydro hydro-electric dam
Filed by William P. Short Iii
Part of
Application of Sugar River Power, LLC for Qualification of Lower Village Hydro as a Class I Renewable Energy Source
- Type of filing
- Compliance filing (Compliance Filing, Order No. One)
- Date filed
- February 2, 2025
- Filed by
- William P. Short Iii
- Files
- Not listed yet
As listed on the current system
Compliance Filings, 02/02/2025 [07-02-11RE02] Order No.One / William P. Short Iii / Third quarter 2024 production report for the Lower Village Hydro hydro-electric dam
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)