Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Fourth quarter 2025 production report for the Lower Village Hydro hydro-electric dam

Compliance Filing, Order No. 1

Filed by William P. Short Iii

Part of

Application of Sugar River Power, LLC for Qualification of Lower Village Hydro as a Class I Renewable Energy Source

Type of filing
Compliance filing (Compliance Filing, Order No. 1)
Date filed
May 9, 2026
Filed by
William P. Short Iii
Files
Not listed yet

As listed on the current system

Compliance Filings, 05/09/2026 [07-02-11RE02] Order No.1 / William P. Short Iii / Fourth quarter 2025 production report for the Lower Village Hydro hydro-electric dam

This filing on the current system (opens in a new tab)