Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. COM05168

BULLS BRIDGE UNITS 1-6 HYDRO QTR 4 - 2022

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 01/26/2023 [13-07-19] Order No.COM05168 / Firstlight Power / BULLS BRIDGE UNITS 1-6 HYDRO QTR 4 - 2022

This filing on the current system (opens in a new tab)