Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Com05168 Bulls Bridge Qtr. 4

Compliance Filing, Order No. 1

Filed by Firstlight Power

Part of

Application of FirstLight Hydro Generating Company for Qualification of Bulls Bridge Units 1-6 as a Class 1 Renewable Energy Resource

Type of filing
Compliance filing (Compliance Filing, Order No. 1)
Date filed
February 4, 2020
Filed by
Firstlight Power
Files
Not listed yet

As listed on the current system

Compliance Filings, 02/04/2020 [13-07-19] Order No.1 / Firstlight Power / Com05168 Bulls Bridge Qtr. 4

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)