Docket No. 26-05-10
Application of The Connecticut Light and
Power Company d/b/a Eversource Energy
to Amend its Rate Schedules
Scheduling Conference – Overview of Application
August 11, 2026
Today’s Objective
We’ll briefly review:
The CL&P Distribution System
Case Outline and Roadmap
Rate Case Proposals for Approval
Rate Year Capital and Project Documentation Overview
Procedural Items for Discussion
2
Distribution System Overview
CL&P’s service area covers 4,400 square miles or 87% of CT’s total geographic area
CL&P encompasses 157 communities serving 1.3 million customers
3
Distribution System Overview
System Characteristics
Current Value
Total Customer Accounts
~1.3 million
Total Circuit Miles
~23,593 miles
Overhead Circuit Miles
~16,640 miles
Underground Circuit Miles
~6,953 miles
Poles
734,952
Total Reclosing Devices
6,064
Automatic Tie Reclosers
~1,000
Number of Bulk Substations
99
Number of Distribution Substations (Non-Bulk)
57
Substation Transformers
314
Substation Circuit Breakers
1,702
Number of Feeders/Circuits
995
Donald J. Scacco
President, CL&P
Christopher E.
Colorio
VP, Electric System
Operations
Clifford G. Williams
VP, Electric Field
Operations
Alan L. Lawrence
VP, Station
Operations and Field
Eng/Communications
1,417 CL&P Distribution Employees
4
Case Overview
Topic
Witness(es)
Summary of Key Items Seeking Approval
01. Powering Connecticut’s Future
Leadership Panel
Donald J. Scacco Jr., Digaunto Chatterjee, and Douglas
P. Horton
Performance Based-Multi-Year Rate Plan (PBMRP) with a 4-year stay out and performance metrics
Overview of 5-Year Targeted System Plan
Proposed modifications to storm cost recovery framework
02. Powering Connecticut’s Future
Targeted System Performance Plan
Lavelle A. Freeman, David L. Gladey, Jennifer A.
Schilling, Dr. Elli Ntakou, and John P. DiPaolaTromba
Approve 5-Year TSP Plan in accordance with Dkt. No. 17-12-03RE08
Reliability Performance Metrics
03. Powering Connecticut's Future
Advanced Metering Infrastructure
Jared A. Lawrence and Douglas P. Horton
AMI Implementation Plan and Associated Cost Recovery Framework
04. Powering Connecticut's Future
Performance-Based Ratemaking
Julia Frayer
Establishes revenue formula; study on total factor productivity and cost benchmarking
05. Powering Connecticut's Future
Investment and Affordability Policy
Matthew Nelson and Michael Goldman
Discusses affordability issues associated with capital investment
06. Revenue-Requirement Analysis
Brendan J. O’Brien and Garrett J. Murray
Revenue Deficiency of $727M (inclusive of storms) or $451M (exclusive of storms)
07. Capital Additions
David L. Gladey, John P. Dipaola-Tromba, Leanne M.
Landry, and Jeffrey D. Turano
Prudency Determination on capital additions from 2017 through December 31, 2026
08. Vegetation Management Program
John Dipaola-Tromba, Sean D. Redding, and Jenna
Turner
Proposed Vegetation Management Plan
09. Employee Compensation and Benefits
Sasha P. Lazor, Marianne H. Eichler, and Kara A.
O’Connor
Base and Variable Pay Compensation Costs
Employee Benefit Costs
10. Customer Service
Jess Cain, Jared A. Lawrence, and Andrew C. Belden
Customer Service Policies
Performance Metrics
11. Environmental
Marc J. Richards, Gary A. Iadarola, and Clare B Connolly
Environmental Remediation Expense Deferral
GHG Emissions Reduction Performance Metric
12. Cost of Capital (ROE and Capital Structure)
Ann E. Bulkley
Proposed ROE of 10.25%
13. Storm Cost Recovery
Christopher E. Colorio, Mark P. Baldwin, John P.
Dipaola-Tromba, Leanne M. Landry, and John G.
Griffin
Storm costs for 2024 through March 2025
14. Depreciation
Ned W. Allis
Depreciation Rates
15. Rates
Edward A. Davis and Kimblery R. Parsons
Rate Design, Newly Proposed Heat Pump and Economic Development Rate
16 and 17. Allocated Cost of Service and Marginal
Cost of Service
Amparo Nieto
Rate Studies
5
Key Rate Case Proposals Presented for Approval
Rates Effective
July 1, 2027
⇒ “Powering Connecticut’s Future” System Development Plan which
fulfills the requirements of Docket No. 17-12-03RE08
5-Year Targeted System Performance Plan (TSP Plan)
Test Year
2025
Affordability framework to calibrate investment, maximize customer benefits
ROE
10.25%
Optionality for PURA to evaluate and set the path for system investment over 5
Capital Structure
53.86%
Net Revenue Deficiency
$727M
Avg. All Customer Bill
Impact
18%
and enhance customer assistance programs
to 10-year horizon
Includes vegetation management and AMI proposal
⇒ Performance-Based Multi-Year Rate Plan
Rate Plan to accompany the TSP Plan
Capital investment recovery, annual inflation adjustment on O&M
4-year stay-out commitment (aligns with CT General Statute)
Introduction of performance metrics, symmetrical financial penalties and
incentives
⇒ Revenue Deficiency $727M (inclusive of storms)
Approval of a revenue requirement that fairly reflects the cost of providing
service in 2025, with known and measurable adjustments through the rate
year
⇒ Modified storm cost recovery framework
Notice of Intent:
May 20, 2026
Filing Date:
July 14, 2026
Decision Date:
June 23, 2027
(proposed)
Rates Effective:
July 1, 2027
6
Rate Year Capital and Project Documentation Overview
CL&P cost of service incorporates capital additions through June 30, 2028 into base rates
To support historical capital, CL&P has provided the following for every capital project placed in service from 2017 through 2025:
•
Cover Sheet and Closing Report: this provides a variance analysis on project actuals to the latest approved budget, along with actual charges by category of
costs as it pertains to every work order
•
Project Authorization Form: this provides a description of the project, including an executive summary, project costs summary, technical justification,
alternatives considered, as well as other details. Supplemental Project Authorization Forms are provided when applicable.
•
Approvals: this provides documentation pertaining to the approvals of each project
To support capital placed in service after the Test Year, CL&P will provide supplemental filings throughout the course of the
proceeding to include project documentation for recent actuals:
•
By 9/15/26, the Company will support actuals through June 30, 2026, as well as updates to planned capital
•
By 10/15/26, the Company will support actuals through August 31, 2026
•
By 11/15/26, the Company will support actuals through September 30, 2026
•
By 12/15/26, the Company will support actuals through October 31, 2026
•
If feasible, an additional supplement before hearings begin
•
Final supplement to be filed as a late-filed exhibit prior to close of evidentiary record
7
Procedural Items for Discussion
Milestone
Proposed Due Date
Proposed Procedural Schedule
Application Filed
July 14, 2026
Pre-filed Testimony due
October 21, 2026
Public Hearings
Rebuttal Testimony due
November 18, 2026
LFE-001 for Revenue Requirement Updates
Surrebuttal Testimony due
December 9, 2026
Hearings start
January 11, 2027
Late Filed Exhibit Hearings start
February 8, 2027
Briefs due
March 8, 2027
Reply Briefs due
March 22, 2027
Draft Decision issued
May 7, 2027
Written Exceptions due
May 26, 2027
Oral Arguments
June 9, 2027
Final Decision
June 23, 2027
Statutory Deadline (350 days)
June 29, 2027
Redactions Progress
8
As listed on the current system
Corres. 08/07/2026 [26-05-10] (Keegan Werlin, Llp) - CLP Scheduling Conference Presentation