The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-02
Date Issued October 01, 2026
CLF-AC-019
Page 1 of 2
Date Filed: October 16, 2026
Witness:
Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton and Julia
Frayer
Request from: CLF and Acadia Center
Question:
(Productivity Factor) Please refer to the Company’s cost-of-service/rate-base-driven earnings
model.
a) Explain why a capital-expense-based productivity factor calculated against customer growth
is an appropriate basis for setting the revenue cap, given that the Company earns a return on
capital additions to rate base regardless of whether customer count increases.
b) State whether the Company agrees that it has a financial incentive to increase capital spending
independent of customer growth. If not, please explain the basis for disagreement.
Response:
a) Although LEI’s Industry TFP Study calculates both a total factor productivity (“TFP”) trend
and capital and OM&A partial factor productivity (“PFP”) trends, the Company is not
proposing to use the TFP, nor the capital PFP, under its proposed revenue adjustment
mechanism. The Company’s proposed X Factor is based on the industry OM&A PFP and
applies only to the OM&A component of the Company’s revenue requirement. Capital costs
are addressed separately through the Company’s proposed capital funding mechanism.
LEI uses customer count as the output measure in calculating OM&A PFP because it provides
an objective, consistently defined, and comparable measure of physical output of electric
distribution utilities over time. Please refer to the Company’s response to CLF-AC-018 i. The
use of customer count as the output metric does not mean that customer growth is a prerequisite
for recovery of costs or that capital investment must be directly caused by customer-count
growth. Rather, the OM&A PFP measures how the quantity of operating inputs required to
provide distribution service has changed over time relative to the quantity of outputs (customer
count).
b) The Company does not agree it has an incentive to increase capital spending irrespective of
system needs or customer growth. Capital investment is required for myriad reasons other than
growth in customer count, including replacement of aging infrastructure, reliability, resiliency,
safety, and public policy (for example, electrification, integration of distributed resources, and
other evolving system and regulatory requirements). The Company has no financial incentive
to invest capital that is not necessary in its obligation to safely and reliably serve its customers.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-02
Date Issued October 01, 2026
CLF-AC-019
Page 2 of 2
Prior Referenced Response
i
CLF-AC-018 Question
(Productivity Factor) Refer to Exhibit CLP-PBR-2, p. 12, and the Study’s use of “number of customers” as the output
metric in the index method. Explain why the Study uses number of customers as the output metric, and state whether
the Company agrees that growth in customer count is not a goal the Company can materially influence, depend upon,
or utilize as a justification for seeking an increased revenue requirement.
CLF-AC-018 Response
Exhibit CLP-PBR-1, pp. 34–36 discusses the reasons for using the number of customers served as the output metric
in LEI’s Industry TFP Study. Customers served are commonly used as the output metric in TFP studies of the electric
distribution industry. The goal of a TFP study is to identify output in physical unit terms. The use of Customer count
fits this requirement. Customer counts are objective, consistently defined, and readily available across EDCs, allowing
for meaningful comparison over time and aggregation across utilities. In contrast, electricity sales can be materially
affected by factors largely outside a utility’s control, including weather, economic activity, changes in customer usage,
electrification, and the addition of large loads. Changes in electricity sales therefore do not necessarily reflect changes
in an EDC’s underlying productivity. In addition, EDCs invest in and maintain distribution infrastructure to provide
customers with safe and reliable access to electricity and sufficient capacity to meet system demand, rather than to
deliver a specific volume of electricity over the course of a year. Accordingly, LEI determined that the number of
customers served provides a stable and comparable measure of the scale of distribution service for purposes of
measuring industry productivity.
The Company agrees that growth in customer count is largely driven by factors outside the Company’s control and
that customer count growth, by itself, is not a justification for seeking an increased revenue requirement. The use of
customer count in LEI’s Industry TFP Study is intended to measure productivity trends; it is not intended to be
interpreted as a business objective, where increasing the number of customers is a Company goal or, standing alone,
a basis for increasing the Company’s revenue requirement.
As listed on the current system