The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-11
Date Issued September 24, 2026
ALLCO-129
Page 1 of 3
Date Filed: October 09, 2026
Witness:
Warren R. Boutin and Andrew C. Belden
Request from: ALLCO
Question:
(ISO-NE Determinations — practice and timing.) The Company’s response to ICC-008 states
that “ISO-NE review required for projects greater than 1 MW is outside the state Guideline
clocks and can extend the overall.” For each calendar year 2023 through 2025 and 2026 to
date: (a) state the number of Connecticut DG interconnection applications the Company
referred to ISO-NE for a Determination, by Level and by size band; (b) state the criterion or
criteria the Company applied in deciding to refer each application (including any practice that
a generator greater than 1 MW connected to a substation with 20 MW of DER online and in
queue requires a Level III transmission study), identify who formulated each criterion and
when, and identify every communication with ISO-NE concerning it; (c) state the average,
median, and maximum elapsed time from referral to Determination; (d) state whether the time
an application spends awaiting a Determination is excluded from the interconnection-timeline
metrics proposed in Exhibit CLP-CUSTOMER-1, and if so under what authority; and (e)
produce, in native format, a schedule listing each referred application, the date of referral, the
date of Determination, the outcome, and any study or fee required.
Response:
The Company's referral criterion is based on ISO-NE requirements applicable to DER projects
with incremental aggregate on-site nameplate capacity exceeding 1 MW. This criterion is
independent of how much generation is on the substation.
The Company will notify ISO-NE of such projects, and ISO-NE will determine the level of review
required. This may include:
I.
II.
III.
PP5 notification - estimated cost of $5,000;
Determination Study- estimated cost of $15,000 (This could lead to a Transmission
Level III Study); and
Transmission Level III Study - estimated cost of $65,000.
Actual costs are subject to change and may increase over time.
In addition to the foregoing, the Company states as follows:
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-11
Date Issued September 24, 2026
ALLCO-129
Page 2 of 3
(a) The number of projects greater than 1MW can be found on the Company’s publiclyavailable Hosting Capacity Maps site. 1
(b) The criteria the Company applied to each application greater than 1MW comes directly
from ISO-NE. Please refer to the Company’s response to ALLCO-132 i
(c) Because this determination is made by a third party (ISO-NE), Eversource does not track
the referral time.
(d) The interconnection timeline metrics proposed are for the level 1 residential projects.
Residential projects are all less than 1MW.
(e) Please refer to the Company’s response to subpart (a).
Prior Referenced Response:
i
ALLCO-132 Question:
(Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The
Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process
timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he
EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a)
Produce each monthly PowerClerk Report, in native format, from January 1, 2020 to the present, and identify
each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the
Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE
requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority
on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state
whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been
met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State
whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for
treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE
review.
ALLCO-132 Response:
CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to
obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States
District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the
rules of procedure that govern discovery in that lawsuit.
CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the
Company’s application to amend its existing rates schedules because the interrogatory either seeks information
specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
See, https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/connecticut-application-to-connect.
1
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-11
Date Issued September 24, 2026
ALLCO-129
Page 3 of 3
Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal
tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved
Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or
additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with
payment milestones included within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection
Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed Generating
Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC
issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The
Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.