Interrogatory responses
Answers to questions 185
Filed by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Files1
ALLCO-185_Final.pdf
PDF · 128 KB · 3 pagesText searchable
Download ALLCO-185_Final.pdfRead the text of ALLCO-185_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-13
Date Issued October 13, 2026
ALLCO-185
Page 1 of 3
Date Filed: October 27, 2026
Witness:
Counsel
Request from: ALLCO
Question:
(Follow-up to ALLCO-088, ALLCO-096, ALLCO-097, and ALLCO-098 — load-reducer
treatment.) ALLCO-088, Attachment 1, presents an “Estimated CL&P Distributed Solar Output”
at each ISO-New England monthly peak hour from 2021 through 2025, while the response to
ALLCO-088, subpart (e) states that the Company “has not expressly estimated the effect of behindthe-meter or load-reducing generation on peaks, load obligations, or transmission billing
determinants.” State: (a) the source, method, author, and date of preparation of Attachment 1, and
each other purpose for which the Company or any affiliate uses that or any similar estimate
(including load forecasting, standard-service procurement, and ISO-New England reporting); (b)
the installed distributed-generation capacity (MW AC) assumed for each month in Attachment 1,
reconciled to the capacity reported in ALLCO-095; (c) why the estimated output at the monthly
peak hour is reported as zero in most months, including months in which the peak hour is 18:00 or
19:00 and daylight remains, and the estimated output at the ISO-New England annual peak hour
and at the hour of the Company’s own monthly distribution-system peak in each year 2021 through
2025; (d) the mechanism by which, as stated in ALLCO-098, subpart (b), excess generation
delivered to the grid by a customer served by one load-serving entity “reduces load and capacity
obligations for all load-serving entities” rather than the obligation of the load-serving entity that
serves the host customer, by reference to the ISO-New England settlement rules the Company
relies on; (e) whether the Company, as standard-service and last-resort-service provider, receives
the reduction in energy, capacity, and transmission settlement attributable to load-reducing
generation at the premises of its standard-service customers, and where in the standard-service rate
or reconciliation that reduction is credited; and (f) whether the Company’s standard-service
procurement solicitations disclose to bidders any forecast of behind-the-meter generation, and if
so produce the most recent such disclosure.
Response:
Eversource objects to this request on the basis of relevance and administrative burden. In terms
of relevance, this request seeks information that is not relevant to any request of the Company in
this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to
Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. This discovery request is
seeking information regarding solar generation, electric generation and supply and load settlement
issues and is, therefore, not reasonably calculated to lead to the discovery of evidence that would
further the purposes of this proceeding or be relevant to any issue that will be decided in this
proceeding.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-13
Date Issued October 13, 2026
ALLCO-185
Page 2 of 3
Under Connecticut case law, evidence is relevant only if it has a tendency to establish the existence
of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities,
72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the hearing and provide
the factual foundation upon which an agency decision may rely. Therefore, a party is required to
produce discovery documents only if they are “material and necessary to [an] action.” Dotson v.
Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super.
Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)).
Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J.
Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate
good faith as well as probable cause that the information sought is both material and necessary” to
this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant
part that a party may only seek discovery of nonprivileged information that is “material to the
subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible
only to prove material facts, that is to say, those facts directly in issue or those probative of matters
in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health
& Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis
added.)
Also, Allco “should not be allowed to indulge a hope that a thorough ransacking of any information
and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub.
Co. v. Hartford Courant Co., 261 Conn. at 681. “Interrogatories should not be used to . . . permit
a party to go on a fishing expedition.” Mfr.’s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670
(1967) (internal quotation marks omitted).
The information requested in this interrogatory is not material to the Company’s rate application
as it does not advance the factual foundation upon which PURA’s decision will rely. Office of
Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As
the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes
§ 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a).
PURA has also previously ruled that interrogatories must pertain to the evidence and testimony
submitted by a witness in the proceeding. See, Ruling on Motion No. 73, Docket No. 23-11-02 –
Application of Connecticut Natural Gas Corporation and The Southern Connecticut Gas Company
to Amend Their Rate Schedules, April 3, 2024, citing, General Statutes § 4-177c(a)(2); Motion
Ruling Nos. 15 and 17, Jan. 2, 2009, Docket No. 08-07-15, Petition of the Office of Consumer
Counsel for Enforcement of Quality of Service Standards for The Southern New England
Telephone Company d/b/a AT&T Connecticut.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-13
Date Issued October 13, 2026
ALLCO-185
Page 3 of 3
In addition, considering the statutory 350-day timeframe to issue a final decision on the Company’s
application and the number of interrogatories issued in this proceeding to-date, the litigation of
issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct
of this proceeding. 1
Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01
03, Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04,
and ALLCO-027. Eversource objected to both of these questions.
1
As listed on the current system
Question(s) Answered 185 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026