Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatories

To CL&P, questions 195 thru 206

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES : : : : DOCKET NO. 26-05-10 OCTOBER 19, 2026 INTERROGATORIES OF ALLCO FINANCE LIMITED TO THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY — SET FIFTEEN Pursuant to the Authority’s August 19, 2026 ruling granting Allco Finance Limited (“Allco”) intervenor status, and in accordance with the Authority’s Rules of Practice, Regs. Conn. State Agencies § 16-1-1 et seq., Allco propounds the following interrogatories — numbered consecutively with Allco’s prior sets (Q-ALLCO-001 through Q-ALLCO-194) — to The Connecticut Light and Power Company d/b/a Eversource Energy (“CL&P” or the “Company”). The definitions and instructions set forth in Allco’s prior sets apply. In addition: “Market Rule 1” means Section III of the ISO New England Inc. Transmission, Markets and Services Tariff; “Manual M-28” means ISO New England Manual M-28, Market Rule 1 Accounting; “Load Asset,” “Assigned Meter Reader,” “Host Participant,” “Metering Domain,” “Meter Data Error,” and “Settlement Only Resource” have the meanings given in the ISO-NE Tariff and Manuals; “Load Settlement System” means each software system, including the Retail Operations system developed by Hitachi and any successor, that the Company or Eversource Energy Service Company (“ESC”) uses to compute and report hourly load by Load Asset to ISO-NE for the Company’s Metering Domain; “Omni” means the retail billing platform that NSTAR Electric Company implemented in 2024 and any Connecticut implementation of the same platform; “EL26-5” means BP Energy Retail Company LLC v. ISO New England Inc., Eversource Energy and NSTAR Electric Company, FERC Docket No. EL26-5-000; and “Spencer Hill Applications” means interconnection applications INT-90809 and INT-90811 (each 2,000 kW AC, 132 Spencer Hill Road, Winchester), together with INT-60394 at the same site. Part A concerns the Company’s retail load settlement practices, which determine the wholesale load, and therefore the Standard Service and Last Resort Service costs, assigned to the Company’s customers, and the accuracy of the settlement data on which those costs depend. Part B concerns the Company’s administration of interconnection applications that it refers to ISO New England for transmission-level review, a function whose costs the Company proposes to recover in this case and whose performance the Company’s responses to ALLCO-119 and ALLCO-120 (116 applications over 2 MW pending; 23 Level 2 applications pending more than five years) place in issue. Where an interrogatory refers to the Spencer Hill Applications, it does so because they are the documented example in Allco’s possession; each such interrogatory also asks for the Company’s practice as to all applicants, and the Company is requested to answer as to all applicants and, if it maintains an objection as to Allco’s own applications, to say so separately rather than withhold the answer as a whole. Please answer separately and fully in writing, identify the witness responsible, produce each document requested, and provide responsive schedules in native (Excel) format. INTERROGATORIES A. Retail Load Settlement Under Market Rule 1 Q-ALLCO-195: (Treatment of behind-the-meter solar generation that is consumed on site.) For a customer with a rooftop or other behind-the-meter solar facility, describe step by step — by reference to the specific sections of Market Rule 1, Manual M-28, ISO-NE Operating Procedure No. 18, and the Company’s own load settlement procedures on which the Company relies, which should be produced — how the energy generated by the facility and consumed on the premises (not exported to the distribution system) is treated in the Company’s Load Settlement Process under Market Rule 1, separately for each of the following four cases: (i) a customer without interval metering served by a licensed third-party supplier; (ii) a customer without interval metering taking Standard Service or Last Resort Service from the Company; (iii) a customer with interval metering served by a third-party supplier; and (iv) a customer with interval metering taking Standard Service. For each case state: (a) the Load Asset to which the customer’s load is assigned and the entity that holds it; (b) whether the on-site generation reduces the hourly load reported for that Load Asset, and if so how the hourly reduction is determined — in particular, for a profiled customer, whether the reduction in billed kilowatthours is spread across all hours of the month according to the rate-class load profile rather than assigned to the daylight hours in which the generation occurred, and whether the Company applies any solar-adjusted or net-metered-customer load profile; (c) which load-serving entity’s wholesale energy, capacity, and regional-network-service obligations are reduced as a result, and by what amount per kilowatt-hour of on-site consumption; and (d) a worked example for a customer consuming 1,000 kWh in a month of which 400 kWh is supplied by on-site solar, showing the kilowatt-hours reported to ISO-NE for the customer’s Load Asset in each case. Q-ALLCO-196: (Treatment of behind-the-meter solar generation that is exported.) For the same four cases, describe step by step, with the same citations, how energy generated by the facility and exported to the distribution system is treated in the Company’s Load Settlement Process, and state: (a) whether the exported kilowatt-hours are metered as a separate channel and, if so, whether they are reported to ISO-NE as generation, as negative load on the host customer’s Load Asset, as a reduction of the Metering Domain total that is allocated among all Load Assets, or otherwise; (b) the precise mechanism — section of Manual M-28 or other authority — by which, as the Company stated in ALLCO-095(a), “[t]he excess wholesale generation is distributed amongst all LSEs in the load zone,” including whether the distribution is made in proportion to each LSE’s share of load in the Company’s Metering Domain, in the Connecticut load zone, or otherwise, and whether it is made hourly or monthly; (c) whether the exported energy is reflected in any Load Asset’s coincident-peak contribution used to set capacity load obligations and regional network service charges, and for whose benefit; (d) whether the same treatment applies to the entire output of a facility that exports all of its generation — including facilities compensated under the buy-all option of the Non-Residential Renewable Energy Solutions, Shared Clean Energy Facility, and Residential Renewable Energy Solutions tariffs, LREC/ZREC facilities, and qualifying facilities selling under power purchase agreements — and if not, how the output of each such category is treated; and (e) a worked example for a 2 MW facility exporting 300 MWh in a month, showing the kilowatt-hours by which each Load Asset in the Company’s Metering Domain is reduced, assuming Standard Service and Last Resort Service represent the percentage of Metering Domain load that they represented in the Test Year (state that percentage). Q-ALLCO-197: (Who receives the value of exported generation the Company pays for.) With respect to facilities whose entire output the Company purchases or credits under a PURAapproved tariff or contract and whose cost is recovered from all distribution customers through the Non-Bypassable Federally Mandated Congestion Charge or otherwise: (a) confirm that, under the treatment described in ALLCO-095(a), the wholesale energy value of that output is distributed to every load-serving entity in the load zone, including third-party suppliers that bear none of the tariff cost, in proportion to their load; (b) state, for each calendar year 2020 through 2025, the total megawatt-hours of such exported output in the Company’s Metering Domain, the share distributed to Load Assets held by third-party suppliers, and the value of that share at the applicable hourly real-time locational marginal prices; (c) state whether the Company’s Standard Service and Last Resort Service procurement and reconciliation reflect any credit for that output, and where; and (d) state whether any portion of the capacity value, forward-reserve value, or regional network service reduction associated with that output accrues to third-party suppliers, and quantify it. If the Company contends that it cannot perform any of these calculations, state what data would be required, whether the Company possesses it, and why the calculation was not performed before the Company asserted in ALLCO-098(c) and (d) that “[t]here is no cost-benefit asymmetry” and that existing mechanisms “already align” costs and savings. Q-ALLCO-198: (The claimed ratepayer benefit of load-reducer treatment.) The Company stated in ALLCO-040 and ALLCO-041 that treating distribution-connected resources under five megawatts as unregistered load reducers “produces benefits for customers by reducing wholesale load obligations,” and in ALLCO-087 that it is the “general Company practice to not register” such resources with ISO-NE and that this practice has been “acknowledged and accepted by PURA.” Explain how the Company’s treatment of projects under 5 MW as load reducers results in benefits to ratepayers, and in doing so: (a) identify the customers who receive the benefit — the Company’s Standard Service and Last Resort Service customers, customers of third-party suppliers, all distribution customers, or some other group — and quantify the benefit to each group for each year 2020 through 2025 in megawatt-hours, in capacity megawatts, and in dollars; (b) identify the docket, decision, or ruling in which the Authority “acknowledged and accepted” the practice of not registering resources under 5 MW, and produce it; (c) compare the treatment in (a) with the treatment that would result if a facility whose output the Company purchases were registered as a Settlement Only Resource — in which case its metered output would be settled at the locational marginal price to the account of the Company as purchaser — and state whether the Company has ever evaluated registering, as Settlement Only Resources or otherwise, facilities whose output it purchases under buy-all tariffs or power purchase agreements, so that the energy and capacity value of that output accrues to the customers who pay for it; produce each such evaluation or state that none exists; (d) state whether the Company’s load forecasts used for Standard Service procurement, and the Standard Service bids it receives, reflect the load-reducing effect of behind-the-meter generation, and if so how, so that the Authority can determine whether the claimed benefit reaches Standard Service customers in the price they pay; and (e) state whether the Company’s statement in ALLCO-087 that “no individual or group determines” whether a resource under 5 MW is registered with ISO-NE remains accurate, and if so identify the person or group responsible for the Company’s compliance with ISO-NE registration and metering requirements for distributed resources. Q-ALLCO-199: (Load settlement systems and the Omni conversion.) (a) Identify each Load Settlement System used for the Company’s Metering Domain in each year 2019 through 2026, its vendor, the ESC or Company organization that operates it, the number of personnel assigned, and the portion of its cost charged or allocated to the Company in the Test Year and Rate Year, with schedule references; (b) state whether the Omni retail billing platform, or the same platform under another name, has been or is scheduled to be implemented for the Company’s Connecticut customers, the actual or scheduled implementation date, the project budget and amounts spent through the most recent date available, the amount included in the Test Year, Test Year Pro Forma, or Rate Year (expense or plant), and the schedule and workpaper references; (c) state whether the Load Settlement System used for the Company is the same system (Retail Operations, developed by Hitachi) that Eversource Energy identified in EL26-5 as the system NSTAR Electric Company uses, and whether the defects described in EL26-5 — load “assigned to the same accounts multiple times” and “a doubling of customer loads for certain commercial, industrial, and residential customers” — were present in, tested for, or corrected in the Company’s system; and (d) describe the “enhanced monitoring, validation, and review procedures for load settlement data” that Eversource Energy told the Commission NSTAR has implemented, state whether and when each was implemented for the Company’s Metering Domain, and produce the procedures. Q-ALLCO-200: (Meter Data Errors and resettlements in the Company’s Metering Domain.) For each calendar year 2019 through 2026 (year to date), state in native format: (a) the number of Meter Data Error correction requests, Requested Billing Adjustments, and resettlement submissions made by or on behalf of the Company as Assigned Meter Reader or Host Participant for its Metering Domain, the month(s) of load affected, the megawatt-hours and dollar amount of each correction, and the Load Assets (by LSE category: Standard Service, Last Resort Service, third-party supplier) whose load was increased or decreased; (b) the number of inquiries, disputes, or complaints received from licensed third-party suppliers concerning the load assigned to their Load Assets, and their disposition; (c) whether any error in the Company’s reported load affected the load assigned to the Company’s Standard Service or Last Resort Service Load Assets, the megawatt-hours and dollar effect, and how any resulting over- or under-collection was treated in the Standard Service, Last Resort Service, or Generation Services Charge reconciliations; (d) whether the Company’s reported load affected the Company’s or any supplier’s Renewable Portfolio Standard obligation under Conn. Gen. Stat. § 16-245a and whether any correction was reported to the Authority or the Department of Energy and Environmental Protection; and (e) each notice given to the Authority, the Office of Consumer Counsel, or ISO-NE concerning errors in the Company’s load settlement data since January 1, 2024, with the date and a copy. Q-ALLCO-201: (The Load Settlement Report and EL26-5 — facts and costs.) Without regard to any privilege claimed for the report itself: (a) state whether the Internal Audit review of the ISO-NE load settlement process that the Company identified in ALLCO-065 through ALLCO-067 (requested April 25, 2025; engagement memorandum May 19, 2025; final report January 7, 2026) examined the Company’s Connecticut Metering Domain, the NSTAR Metering Domains, or both, and whether it examined the Omni-related defects at issue in EL26-5; (b) state whether the Company’s response to ALLCO-068 — that EL26-5 is the only litigation and that it concerns load settlement “solely in Massachusetts” — remains accurate in light of the fact that Eversource Energy, the parent whose service-company costs are allocated to the Company, is a named respondent, and identify every other complaint, dispute, or proceeding since January 1, 2024 concerning load settlement data reported by any Eversource electric distribution company; (c) state the total cost incurred by Eversource Energy, ESC, NSTAR, and the Company in connection with EL26-5 and the related reconciliation work described in Eversource’s March 6, 2026 answer (dedicated processing environment; rerunning settlement data; integrity checks; meetings with the Massachusetts Department of Energy Resources), including outside counsel, consultants, vendor remediation, and internal labor, and the portion of each charged or allocated to the Company, with FERC account and schedule references; and (d) state whether any cost of remediating load settlement defects, of resettling Massachusetts invoices, or of defending EL265 is included in the Test Year, Test Year Pro Forma, or Rate Year cost of service of the Company, directly or through ESC allocation, and if so the amount and the basis for charging it to Connecticut customers. B. Interconnection Applications Referred to ISO New England for Transmission-Level Review Q-ALLCO-202: (Guideline timelines on the Spencer Hill Applications and on all applications over 1 MW.) The Spencer Hill Applications were submitted through PowerClerk on January 10, 2024. The Company gave notice that a feasibility study was required on July 18, 2024 (190 days later; the Guidelines’ Executive Summary provides 15 Business Days for initial review); delivered the feasibility study on February 6, 2025 (185 days after the signed agreement and $7,500 fee were returned on August 5, 2024; the agreement’s Exhibit B states a duration of 30 Business Days); gave notice on September 23, 2024 that a Distribution System Impact Study was required and received the executed agreement and $85,000 fee on September 25, 2024; and has delivered no system impact study, transmission study, facilities study, or Interconnection Agreement as of the date of these interrogatories. (a) For each of those steps, state the Guideline or study-agreement timeline the Company contends applied, the date it expired, the reason the step was not completed within it, and whether the Company gave the applicant the notice, explanation, and estimated completion date that Section 5.1 of the Guidelines requires when a deadline is missed, with the date of each such notice. (b) For every application over 1 MW received since January 1, 2020, state in native format the elapsed days from application to the Company’s first substantive notice, from feasibility study agreement to feasibility study delivery, and from system impact study agreement to system impact study delivery, and the number and percentage of applications for which each Guideline timeline was met. (c) Identify the person(s) by title responsible in 2024, 2025, and 2026 for monitoring compliance with the Guideline timelines for applications over 1 MW, and each report of non-compliance made to Company management or the Authority. Q-ALLCO-203: (The 20 MW substation threshold and the Level III transmission study requirement.) On October 24, 2024 the Company’s project manager stated: “Any generator greater than 1 MW connected to a substation with 20 MW of DER on line and in the queue is required by ISO-NE to conduct a Level III transmission study. In this case this project is fed from Campville 14R substation with 62 MW of DER on line and in the queue, therefore a Level III transmission study is required,” and on November 5, 2024 that “[t]here is currently 43.5MW in queue and 18.7 on line”; Exhibit A to the System Impact Study Agreement dated September 18, 2024 states “Bulk substation DER online & in Queue 18.5 MW / 38.4 MW.” ISO New England’s Participant Support group stated on November 13, 2024 that the Transmission Owner “provides information to the ISO on the generator(s) requesting interconnection … and the ISO determines the electrical proximity and need for/level of analysis based on that information.” State: (a) the ISO-NE Planning Procedure, Tariff section, or other written authority, by section and effective date, on which the Company relies for the 20 MW threshold and for treating the sum of “on line and in the queue” distributed generation as the measure against that threshold, and produce it; (b) for each Spencer Hill Application, the date on which the Company submitted a Generator Notification Form, Proposed Plan Application, PP5 notice, or other information to ISO-NE, what was submitted, the date and content of each ISO-NE response, and specifically whether ISO-NE — as distinct from the Company — determined that a Level III analysis was required, and on what date; (c) whether the Company’s practice is to make the Level III determination itself before submitting any notice to ISO-NE, and if so since when, under what written procedure, and whether that practice has been reviewed by the Authority; (d) reconcile the 62 MW, 56.9 MW (18.5 + 38.4), and 62.2 MW (18.7 + 43.5) figures the Company gave within six weeks, and state the date as of which each was measured; (e) in native format, each distributed generation project over 1 MW “on line” or “in the queue” at the Campville 14R substation as of October 24, 2024 and as of the date of response (applicant identities other than Allco may be anonymized), with its nameplate capacity, application date, PowerClerk status, whether it was required to undergo a Level III transmission study, the dates that study began and ended, and whether it has been interconnected; and (f) for each year 2020 through 2025, the number of applications over 1 MW that the Company determined required a Level III transmission study, the number that have completed that study, the average and median elapsed time from determination to study completion, and the number that withdrew while awaiting the study. Q-ALLCO-204: (The study agreements, the fees, and the ISO-NE cluster study schedule.) The Feasibility Study Agreement for the Spencer Hill Applications (Effective Date July 18, 2024; fee $7,500) stated that the feasibility results “will be included in an impact study agreement for a Level III T&D study with a cost of $75,000.” The System Impact Study Agreement that followed (Effective Date September 18, 2024) priced the study at $85,000; its Exhibit B, § 6 required a PSCAD model; its Exhibit C stated “Duration of Study: ASO Study timelines,” “[t]he study clock starts once a working model is received (PSCAD),” and “[t]he next ASO study is expected to begin in Fall 2025”; and the September 23, 2024 PowerClerk notice repeated that the project “will be included in the next available ISO-NE cluster study as determined by ISO-NE.” In September 2025 the Company advised that the projects were waiting for a group transmission study “which will begin in January 2026,” and that inclusion in the 2025 study would have required PSCAD models approved before October 2024 — a cut-off that appears in none of the documents just quoted. State: (a) how the $75,000 and $85,000 figures were determined, why the figure increased between July and September 2024, the components each covers (distribution system impact study, transmission study, PSCAD model review, ISONE charges, or other), the account in which the $85,000 is held, the amount expended against it to date with supporting detail, and whether any unexpended balance earns interest for the applicant; (b) the name, ISO-NE designation, scheduled and actual start date, scheduled and actual completion date, and number and aggregate megawatts of projects in each ISO-NE cluster, ASO, or group transmission study in which any Company distribution interconnection application has been included since 2022, and the study in which the Spencer Hill Applications are now included, with its current expected completion date; (c) the date on which the Company knew that models had to be approved by October 2024 for inclusion in the 2025 study cycle, why that cut-off was not stated in the September 2024 agreement or notice, and the date on which it was first communicated to the applicant; (d) the number of applications that missed inclusion in an ISO-NE study cycle since 2022 because a Company requirement or cut-off was communicated after the cycle closed, and the resulting delay for each; and (e) whether the “ASO Study timelines” that govern the duration of the study under Exhibit C are published, and if so produce the schedule in effect on September 18, 2024 and today. Q-ALLCO-205: (PSCAD model handling and PowerClerk notices.) The applicant delivered PSCAD models for the Spencer Hill Applications on November 14, 2024, again on December 18, 2024, and again on March 31, 2025; on March 31, 2025 the Company’s manager wrote that “we were never sent the PSCAD models”; the Company states that it posted a model deficiency notice in PowerClerk on December 18, 2025, no e-mail of which the applicant received or the Company has been able to locate (the Company citing turnover in its engineering group); the Company first described the deficiencies by e-mail on March 18, 2026; revised models were delivered May 29, 2026 and accepted June 2, 2026. State: (a) the date on which the Company’s records show each delivery of the models was received, by whom, and the date on which each was reviewed; (b) whether PowerClerk is configured to send an e-mail to the applicant when a deficiency notice or other status change is posted, whether that configuration was in effect on December 18, 2025, and whether the Company has audited whether such notices were delivered to applicants between October 2025 and May 2026, with the results; (c) the number of applications for which a Company request for additional information or a deficiency notice remained unanswered for more than 90 days between January 1, 2024 and the present, and whether the Company followed up in each case; (d) the number of engineers and project managers (employees and contractors, including Burns & McDonnell personnel) assigned to transmission-level review of distributed generation applications in each year 2023 through 2026, the turnover in that group, and the cost of the group charged to the Company in the Test Year and Rate Year, with schedule references; and (e) whether the Company contends that any portion of the delay in the Spencer Hill Applications since September 25, 2024 is attributable to the applicant, and if so the specific period and reason. Q-ALLCO-206: INT-60394 was submitted on February 28, 2022 for 2,000 kW AC, which was reduced to 1MW by the applicant. After the applicant reduced the project to 1,000 kW, the Company issued a Contingent Approval dated July 9, 2024 and an Interconnection Agreement whose Appendix G estimated construction cost at $281,719, composed of “New Service and recloser $241,137,” “CIAC - 16% … $38,582,” and a $2,000 witness test, and which noted that “additional upgrades will be required if the project ahead in the queue does not proceed,” including conversion of Spencer Street and Spencer Hill Road from 4.8 kV to 23 kV and station regulator upgrades at Winsted 33B and Huntington Road 28P. The applicant returned the executed Interconnection Agreement and Schedule of Milestones on September 6, 2024. State: (a) whether the Company has countersigned that Interconnection Agreement, and if so the date and the date it was transmitted to the applicant; if not, why not, and what the PowerClerk status “Awaiting Fulfillment of Milestone Requirements and Municipal Approval” contends remains outstanding; (b) the Company’s practice and average elapsed time, for all applications since January 1, 2020, between receipt of a generator-executed Interconnection Agreement and the Company’s countersignature, and the number of agreements that have remained uncountersigned for more than 90 days, 180 days, and one year; (c) what the “CIAC - 16%” line represents, how the 16 percent rate was derived, whether it is the same percentage overhead that the Company’s December 2024 Final Accounting Reports for other Allco clusters described as having been “allocated at time of deposit” and “refunded in full,” and the percentage applied to every Interconnection Agreement issued in each year 2020 through 2026; and (d) the identity (anonymized) and status of the “project ahead in the queue,” the estimated cost of the upgrades it is responsible for, the deadline by which it must proceed, and the written procedure by which those costs would be reassigned to INT-60394 or any other later applicant if it does not. Please serve responses on the undersigned by electronic mail by November 2, 2026. ALLCO FINANCE LIMITED /s/ Thomas Melone Thomas Melone Juris No. 438879 Allco Finance Limited 777 West Putnam Avenue, Suite 300 Greenwich, CT 06830 Phone: [phone removed] Email: [email removed] CERTIFICATION This is to certify that on this day, the foregoing document was filed with the Public Utilities Regulatory Authority, and copies were served upon each person designated on the Authority’s official service list in this proceeding in accordance with R.C.S.A. § 16-1-15. /s/ Thomas Melone Thomas Melone

As listed on the current system

Interrogs from Allco Finance Limited to CL&P 195 thru 206-Issued 10/19/2026 [26-05-10]

This filing on the current system (opens in a new tab)