Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatories

To CL&P, questions 223 thru 233

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES : : : : DOCKET NO. 26-05-10 OCTOBER 20, 2026 INTERROGATORIES OF ALLCO FINANCE LIMITED TO THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY — SET EIGHTEEN Pursuant to the Authority’s August 19, 2026 ruling granting Allco Finance Limited (“Allco”) intervenor status, and in accordance with the Authority’s Rules of Practice, Regs. Conn. State Agencies § 16-1-1 et seq., Allco propounds the following interrogatories — numbered consecutively with Allco’s prior sets (Q-ALLCO-001 through Q-ALLCO-222) — to The Connecticut Light and Power Company d/b/a Eversource Energy (“CL&P” or the “Company”). The definitions and instructions set forth in Allco’s prior sets apply. Please answer separately and fully in writing, identify the witness responsible, produce each document requested, and provide responsive data in native (Excel) format with formulas intact. INTERROGATORIES Q-ALLCO-223: (Queue position on the Somers/Bilton circuits.) With respect to the distribution circuit(s) and substation serving the Bilton Solar (LREC9-3045), Point Solar (LREC9-3058), and Bilton cluster (LEG-22750, LEG-22751, LEG-22752) projects in Somers, state, in native format, for every interconnection application of 50 kW or more received by the Company for a facility on the same circuit(s) or substation from January 1, 2015 to the present: (a) the PowerClerk or legacy application identifier, applicant (which may be anonymized other than for the Connecticut Green Bank, its affiliates, and projects financed or owned through Green Bank programs, and other than Allco and its affiliates), nameplate capacity, and datestamp assigned under Guidelines § 2.6; (b) the dates of each study, Contingent Approval, interconnection-agreement issuance, execution by the Company, construction start, and Permission to Operate; (c) the hosting capacity of the circuit and substation as of each such date, and the upgrade cost assigned to each application; (d) each instance in which an application with a later date-stamp than an Allco-affiliate application received a study result, an interconnection agreement, or Permission to Operate before the Allco-affiliate application, and the reason; (e) whether any Green Bank-affiliated or Green Bank-financed project on those circuits was processed under a program, agreement, or priority not available to other applicants, identifying it; and (f) the person(s) who made each sequencing decision. Q-ALLCO-224: (Institutional and pension-fund ownership of Eversource Energy.) The Company has represented to the United States District Court (No. 3:26-cv-01277, ECF 46-3) that the State Board of Administration of Florida Retirement System holds 312,059 Eversource Energy shares, drawn from that fund’s Form 13F-HR. State: (a) for each of the fifty largest holders of Eversource Energy common shares as of the most recent date for which the Company or Eversource Energy has data, the holder, the number of shares, and whether the holder is a public or private pension fund, an index fund, an actively managed fund, an insurance company, or other; (b) the aggregate percentage of Eversource Energy’s shares held by public pension funds, and the source; (c) the actuarial assumed rate of return of each public pension fund among those holders of which the Company or its ROE witness is aware, and the assumed long-term equity return used in Eversource Energy’s own pension plans; (d) whether the Company or its ROE witness considered that the return investors require of Eversource Energy is evidenced by the return assumptions of the pension funds that hold it, and if not, why not; and (e) each service (e.g., Broadridge, DTC, NOBO lists, 13F compilations) through which Eversource Energy identifies its beneficial holders, and the date of the most recent such list. Q-ALLCO-225: (Overheads recovered in base rates — Docket No. 17-10-46.) State: (a) the amount of administrative and general expense, engineering and supervision, construction overhead, and other indirect cost included in the distribution revenue requirement approved in Docket No. 17-10-46, by FERC account, and the amount of each proposed in this docket; (b) the capitalized overhead and clearing-account rates (including the engineering, supervision, administrative, and construction-overhead loaders identified in ALLCO-102, Attachment 1) in effect in each year 2018 through 2026, and the dollar amount of overhead capitalized to distribution plant in each year; (c) for each year 2018 through 2025, the dollar amount of overhead charged to interconnection customers and other customer-funded work orders through those loaders, and whether that amount was credited against the overhead pool recovered through base rates, capitalized plant, or both — identifying the account and the credit; (d) whether any portion of the overhead charged to interconnection customers consists of costs that are also recovered from all customers through base rates set in 17-10-46 or proposed here, and if the Company contends there is no such double recovery, the reconciliation that shows it; and (e) the percentage overhead rate applied to customer-funded interconnection work in 2018, when 17-1046 rates took effect, and each change since, with the approval for each change. Q-ALLCO-226: (Exhibit CLP-Additions-4 Supplemental 2 — distributed-generation interconnection projects.) Exhibit CLP-Additions-4 Supplemental 2 (filed October 19, 2026) reports, for projects categorized as “New Customer” distributed-generation interconnections, negative life-to-date direct costs but positive total costs and in-service additions — for example CD01237 (Bristol Solar One Interconnection: direct −$104,968; total $209,423), CD00450 (Lisbon/Preston 20 MW Solar: −$421,868; $443,186), CD00794 (Pawcatuck Solar Center: −$81,796; $530,316), CD01242 (SR–Litchfield Interconnection: −$879,493; $352,781), CD01244 (SR N Stonington Interconnection: −$751,160; −$132,892), and CD01594 (Haddam Qtr Solar: −$191,799; −$6,523). For each project in that exhibit whose description or project type indicates a generator interconnection, state in native format: (a) the gross direct cost, the customer contribution credited, each overhead or indirect loader applied (by name, rate, and dollar amount), and the resulting total cost; (b) the amount placed in rate base and the amount of the customer contribution recorded as CIAC, by account; (c) whether the overhead charged to the interconnection customer on the same work order was credited against the overhead capitalized, and if not, why not; and (d) the final accounting status of the project under Guidelines § 1.2 and the amount of any refund due or paid. Q-ALLCO-227: (Follow-up to ALLCO-152 — loss factors.) The response states that for ISO-NE load settlement the Company “does not apply a static value to convert metered retail sales to wholesale loads.” State: (a) the method the Company does apply, step by step, including each loss factor, allocation, or estimation used, and its source; (b) the most recent distribution loss study the Company or Eversource Energy Service Company has prepared or commissioned for the Connecticut system, by title, date, and author, and produce it; (c) the annual 2025 totals of the hourly wholesale loads in ALLCO-063, Attachment 1, for Standard Service, Last Resort Service, and competitive supply, and the annual 2025 retail kWh billed in CIEC-020, Attachment 2 — stated as numbers, not by cross-reference — and the difference; and (d) the Company’s best estimate of the components of that difference (technical losses, unaccounted-for energy, company use, unbilled usage, and other), with the basis for each. Q-ALLCO-228: (Follow-up to ALLCO-149 — outside legal expense by matter.) The response states that “[f]or all outside counsel legal matters there is a legal matter number” maintained in the Thomson Reuters Legal Tracker e-billing system. Using that system, state in native format for the Test Year and for 2023, 2024, and 2026 year to date: (a) for each outsidecounsel matter with billings exceeding $10,000, the matter number, the vendor, the amount billed, the amount charged or allocated to the Company, the FERC account, the category of matter (litigation, regulatory, transactional, employment, collections, other), and, for litigation, the forum and the adverse party’s relationship to the Company (customer, developer or interconnection customer, contractor, employee, regulator, other); (b) the amounts in (a) billed by Day Pitney LLP, Cowdery Murphy & Healy LLC, Keegan Werlin LLP, and Steptoe & Johnson LLP for matters involving Allco or its affiliates, Windham Solar LLC, any distributedgeneration interconnection dispute, FERC Docket No. EL25-117-000, Civil Action No. 3:26-cv01277, PURA Docket No. 25-03-12, or the SCEF program, by matter; (c) whether any amount in (b) is included in the Test Year cost of service, the Rate Year revenue requirement (including through the escalation applied in Schedule C-3.20), or Exhibit CLP-REVREQ-9, and where; and (d) if the Company contends that the Legal Tracker system cannot produce the report described in (a), the person who made that determination and the steps taken to test it. Q-ALLCO-229: (Follow-up to ALLCO-151 — corrected billing-determinant data.) Produce ALLCO-062, Attachment 1 corrected for the January 2025 Rate 35 input error acknowledged in ALLCO-151(a), and for each other monthly figure in that attachment that is negative or that departs from the rate class’s other months by a factor of two or more, state whether the figure reflects a billing correction, a cancel-and-rebill, a customer migration between standard service and competitive supply, or an input error, and provide the corrected figure where applicable; state whether any figure in the attachment was used, directly or through the annual totals in OCC-365, Attachment 1, in deriving the Test Year or Rate Year billing determinants; and identify the person who verified the corrected attachment. Q-ALLCO-230: (Accounting treatment of developer funds held by the Company.) For each of the following sums, state, by general-ledger account number and title, how the Company recorded the receipt, and each subsequent reclassification, of the funds; the date of each entry; whether the funds were at any time recorded as a liability to the developer, as forfeited security, as a credit to ratepayers or to the LREC/ZREC, SCEF, or interconnection cost-recovery mechanisms, or as revenue; the FERC account and rate-case schedule, if any, in which the balance appears; and the person who authorized each entry: (a) the $257,260.19 of interconnection-cost refunds computed in the Final Accounting Reports issued in December 2024 for the Allco-affiliate projects and confirmed in the Company’s January 16, 2025 correspondence; (b) the $225,000 of SCEF Year 6 bid deposits posted by Allco affiliates in 2025; (c) the $734,339.76 of Performance Assurance posted under the LREC/ZREC contracts terminated in 2024; and (d) the $559,907.00 of Development Period Security posted under the power purchase agreements that terminated on or about July 23, 2024. Produce the ledger detail and journal entries in native format. Q-ALLCO-231: (The “letterhead” condition on the return of SCEF deposits.) The Company conditioned the return of the SCEF Year 6 bid deposits described in Q-ALLCO-230(b) on receipt of a request on the bidder’s letterhead. Identify the provision of the SCEF Program Manual, Terms and Conditions, or any tariff, order, or Company policy that imposes that condition; the person who decided to impose it and the date; every other bidder in SCEF Years 1 through 7 whose deposit refund was conditioned on a letterhead request, and the elapsed time between non-selection and refund for each; and whether any bidder other than an Allco affiliate waited more than ninety days after non-selection for the return of a deposit, identifying each. Q-ALLCO-232: (Internal communications concerning the force majeure notices.) With respect to the notices of force majeure delivered on behalf of Ecos Energy LLC and PLH Vineyard Sky LLC under Article 15 of the LREC/ZREC contracts and Article 10 of the power purchase agreements (filed in No. 3:26-cv-01277 as ECF 47-42 and 47-44), identify every person who received or reviewed the notices; every written response, if any, and the date; every internal communication, memorandum, or legal-department entry concerning whether to accept, dispute, or respond to the notices and whether the Performance Assurance and Development Period Security would be retained or returned; the date on which the Company first recorded or treated those sums as forfeited; and the person who made that decision. Produce the documents, with a privilege log for any withheld. Q-ALLCO-233: (Treatment of forfeited developer security in rates.) State the total amount of developer security, bid deposits, and interconnection-cost overpayments retained or treated as forfeited by the Company in each year 2019 through the Rate Year; the mechanism (LREC/ZREC reconciliation, SCEF reconciliation, FMCC, base rates, or other) through which each amount was credited to or otherwise reflected in rates, with the docket and schedule; whether any such amount is reflected in the revenue requirement, rate base, or reconciliation balances proposed in this Docket; and whether the Company has ever returned security or deposits after first treating them as forfeited, identifying each instance. Please serve responses on the undersigned by electronic mail by November 3, 2026. ALLCO FINANCE LIMITED /s/ Thomas Melone Thomas Melone Juris No. 438879 Allco Finance Limited 777 West Putnam Avenue, Suite 300 Greenwich, CT 06830 Phone: [phone removed] Email: [email removed] CERTIFICATION This is to certify that on this day, the foregoing document was filed with the Public Utilities Regulatory Authority, and copies were served upon each person designated on the Authority’s official service list in this proceeding in accordance with R.C.S.A. § 16-1-15. /s/ Thomas Melone Thomas Melone

As listed on the current system

Interrogs from Allco Finance Limited to CL&P 223 thru 233-Issued 10/21/2026 [26-05-10]

This filing on the current system (opens in a new tab)