Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 57

Files3

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-057 Page 1 of 2 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: Follow-up to the Company’s response to Q-ALLCO-016 (applications excluded from interconnection performance metrics). The Company’s response and Attachment 1 provided annual counts of interconnection applications excluded from the Company’s interconnectiontimeline performance metrics because they require transformer upgrades (187 in 2020; 142 in 2021; 122 in 2022; 406 in 2023; 534 in 2024; 671 in 2025), but did not provide the percentage figures and total-application denominators requested. For each calendar year 2020 through 2025: (a) state the total number of Connecticut DG interconnection applications received; (b) state the total number of applications completed or otherwise closed; and (c) state the excluded applications identified in the Company’s response as a percentage of each of (a) and (b). (d) If the Company contends it cannot derive these figures from PowerClerk or any other system, describe each system of record for interconnection applications and state which data fields it maintains. Response: Please refer to ALLCO-057, Attachment 1, which includes the previously provided count and percentage of Level 1 projects requiring an upgrade as requested in the Company’s response to ALLCO-016 i, with the addition of three newly requested columns as detailed above in bullets a-c. The figures are for Level 1 Connecticut DG interconnection applications as referenced in ALLCO016. For the purposes of this filing the Company is considering “completed or otherwise closed” applications as those that received Permission to Operate. The Company has derived these figures from PowerClerk, so no alternative description of additional data sources is applicable. Prior Referenced Response: i ALLCO-016 Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-057 Page 2 of 2 applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. ALLCO-016 Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.

As listed on the current system

Question(s) Answered 57 (The Connecticut Light and Power Company) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)