The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-07
Date Issued September 17, 2026
ALLCO-068
Page 1 of 3
Date Filed: October 08, 2026
Witness:
Ronald S. Smith
Request from: ALLCO
Question:
For each of the Withheld Reports: (a) identify the specific litigation, proceeding, or claim that the
Company contends was anticipated at the time the report was commissioned, and state when and
how the Company contends that anticipation arose; (b) state whether the report, its findings, or
information derived from it has been used, referenced, or relied upon in connection with this
Application or any testimony or exhibit in this docket, the proceeding in Docket No. 25-01-03,
FERC Docket No. EL26-5-000, or any other proceeding; and (c) state whether the report, its
findings, or information derived from it has been used in connection with any remediation, process
improvement, or “responsiveness” initiative — including the modifications and improvements to
the load settlement system, processes, and controls, and the improvements to procurement
practices and preparedness, described in the Company’s Objection to Motion No. 40 — and
identify each such use.
Response:
Load Settlement:
(a)
This report was prepared by Internal Audit at the request and under the direction of the
Company’s Legal Department attorneys in view of potential litigation (the “Privileged Load
Settlement Report”). The Privileged Load Settlement Report dated January 7, 2026, relates
to the process the Company’s affiliates use to report and settle energy loads in the ISO-New
England (“ISO-NE”) load settlement system. This report was issued by R. S. Smith, Vice
President-Internal Audit & Security and M. M. Carlson, Manager, to the Eversource Legal
Department on January 7, 2026.
Pending litigation in question includes the FERC proceeding in Complaint of BP Energy
Retail Company LLC v. ISO New England Inc., Eversource Energy and NSTAR Electric
Company, dated Oct. 14, 2025, FERC Docket No. EL26-5-000 (“BPERC Complaint”). In
this FERC proceeding, BP Energy Retail Company LLC (“BPERC”), a competitive energy
supplier in Massachusetts, filed the referenced complaint at FERC pursuant to Sections 206
and 306 of the Federal Power Act, Rule 206 of the Federal Energy Regulatory Commission’s
Rules of Practice and Procedure, and to the extent, applicable, Section 6.3.6 of Exhibit ID of
the ISO-NE Billing Policy.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-07
Date Issued September 17, 2026
ALLCO-068
Page 2 of 3
The BPERC Complaint was filed against ISO-NE, Eversource Energy and NSTAR Electric
Company, seeking relief from certain invoices issued by ISO-NE based on load it claims was
incorrectly assigned to it by Eversource Energy and NSTAR Electric Company solely in
Massachusetts through the load settlement process caused by Omni software in or around
June of 2024. The Privileged Load Settlement Report has been used in connection with the
above pending and potential litigation.
(b)
Please refer to the Company’s response to subpart (a).
(c)
Please refer to the Company’s response to subpart (a).
Procurement:
(a)
In CL&P’s 2025 Rate Adjustment Mechanism (“RAM”) proceeding in Docket No. 25-0103, PURA concluded that CL&P’s procurement practices created a risk of potential adverse
findings in a future docket, such as the next RAM docket or rate case, stating in relevant part
that “the Authority will continue to review the Company’s implementation of procurement
practices . . . . The violations documented herein and any failure by the Company to improve
its procurement practices and compliance therewith may be indicative of inefficient and
imprudent management.” (Docket No. 25-03-01, August 13, 2025, Decision at 32)(emphasis
added.) Subsequently, in Docket No. 24-12-01, PURA’s November 5, 2025, final decision
imposed a return on equity penalty on CL&P’s affiliate, Yankee Gas, based on PURA’s
finding that the Eversource Procurement Department’s “recordkeeping gaps impair the
transparency of the procurement process, and in turn weaken corporate accountability and
the Authority’s ability to conduct effective oversight. For the foregoing reasons, the
Authority concludes that an ROE reduction is warranted for imprudent record management
and procurement practices.” (Docket No. 24-12-01, November 5, 2025, Decision at 17.)
PURA’s decision therefore admonished the Company that its explanations about
procurement practices did “not release the Company from its responsibility to maintain
adequate [procurement] records. The difference between the ultimate contract award and the
RFP documentation should be clear, unambiguous, and maintained in a verifiable manner.”
(Id.)
In light of these regulatory developments, CL&P and its legal counsel reasonably expected
that procurement practices would be the subject of further litigation before PURA in the
contested 2026 RAM proceeding in Docket No. 26-01-03 and the contested rate case in this
docket. An Eversource Attorney therefore asked Internal Audit to undertake, at his direction,
a privileged and confidential assessment of procurement practices and documentation and
generate a report for the Legal Department so that Legal could provide advice and
recommendations regarding alignment with regulatory expectations (the “Privileged
Procurement Report”). The Privileged Procurement Report was finalized on June 4, 2026,
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-07
Date Issued September 17, 2026
ALLCO-068
Page 3 of 3
and is labeled as “CONFIDENTIAL ATTORNEY-CLIENT PRIVILEGED.” The Privileged
Procurement Report is addressed from Ronald Smith, Vice President of Eversource Internal
Audit & Security to Vincent Pace, Assistant General Counsel in the Eversource Legal
Department who was responsible for providing legal advice and representation to the
company in connection with the aforementioned regulatory proceedings.
(b) Please refer to the Company’s response to subpart (a).
(c) Please refer to the Company’s response to subpart (a).