The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-08
Date Issued September 17, 2026
ALLCO-074
Page 1 of 2
Date Filed: October 01, 2026
Witness:
Brendan J. O’Brien and Garrett J. Murray
Request from: ALLCO
Question:
(Follow-up to ALLCO-022.) The response provided only the proposed Rate Year legal-function
compensation of $4.940 million and a confidential attachment limited to 2025. Provide the
information the interrogatory called for: for each calendar year 2018 through 2025 and the Test
Year, (a) the total annual cost of the internal legal function — stated separately for compensation,
benefits, occupancy, technology, library/research services, and allocated overheads— and (b) the
amount of that cost charged or allocated to the Company each year; (c) the FERC account(s) in
which the allocated amounts are recorded; and (d) for the Rate Year, the non-compensation
components of the legal-function cost included in the revenue requirement, with the schedule and
line for each.
Response:
The Company’s response to ALLCO-022 i provided the legal function compensation for each year
2021 through 2025, filed as confidentially in ALLCO-022, Attachment 1, and adequately
addressed subparts (b) and (c), and the FERC accounts are referenced in each schedule in the cost
of service. For each year 2018 through 2020, the information is not readily retrievable, nor pertains
to the Company’s request for recovery in this rate proceeding based on a Test Year ending
December 31, 2025.
For subpart (d), please refer to Exhibit CLP-REVREQ-2, Schedule C-3.20 for the noncompensation components for the Legal department included in the Company’s cost of service.
Prior Referenced Response:
i
ALLCO-022 Question:
State, for each year 2018 through 2025, the Test Year, and the proposed Rate Year, the total annual cost of the internal
legal function (including compensation, benefits, occupancy, technology, library/research services, and allocated
overheads), and the amount of that cost charged or allocated to the Company; identify the allocation methodology and
allocation factor(s) used (referencing, as applicable, the cost allocation methodologies produced in response to EOE066); and identify the FERC account(s) and the specific revenue requirement schedules and workpapers in this docket
in which the amounts allocated to the Company appear.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set ALLCO-08
Date Issued September 17, 2026
ALLCO-074
Page 2 of 2
ALLCO-022 Response:
Please refer to ALLCO-022, Attachment 1 CONFIDENTIAL. The Company’s Legal function proposed total
compensation in the Rate Year is $4.940 million reflected in Exhibit CLP-REVREQ-2, Schedules C-3.5 Payroll
Expense, C-3.6 Employee Variable Compensation, C-3.7 Officer Variable Compensation and C-3.12 Employee
Benefits. Please refer to the Company’s response to OCC-332 for the allocation methodology and factors used in the
cost of service.