  1. Page 1 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 1 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 1 of 142 e 4-19 Colorado PUC E-Filings System m The Mountain Energy Project: Non-Pipeline Alternative Report Prepared for Public Service Company, Xcel Energy January 16, 2025 1
  2. Page 2 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 2 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 2 of 142 Denver Office PA Consulting Group Inc. 1700 Lincoln Street Suite 2550 Denver, CO 80203 USA +1 720 566 9921 Prepared by: PA Consulting Group, Inc. paconsulting.com 2
  3. Page 3 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 3 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 3 of 142 Contents 1 Executive Summary 5 2 Review of Scope 7 2.1 Scope of Work Overview 7 2.2 Overview of Mountain Energy NPA Analysis 7 3 Review of Planning Processes and the Need for an NPA Analysis 8 3.1 Mountain Gas System Overview 8 3.2 System Constraints – the Need for an NPA Analysis 10 3.2.1 Sales and Peak Day Demand 11 3.2.2 Customer Count and UPC 11 3.3 Review of the Company’s Planning and Processes 4 12 3.3.1 Build of GIS Data to System Data 12 3.3.2 Model Development and Calibration 13 NPA DSM Solution Development 14 4.1 Building Type and End-Use Disaggregation 16 4.2 End Use Disaggregation 17 4.3 Geographic Area Analysis 20 4.4 Measure Characterization 23 4.5 Primary Research 29 4.5.1 Residential Customer Survey 29 4.5.2 Residential Customer Survey Results 30 4.5.3 Commercial Customer Survey 46 4.5.4 Commercial Customer Survey Results 46 4.5.5 Contractor/Builder Interviews 61 4.5.6 Contractor/Builder Interviews Results 61 4.6 Estimating DSM Potential 64 4.6.1 Technical Potential 65 4.6.2 Economic Supply Curves 66 4.6.3 Achievable Potential 68 4.7 NPA DSM Solution Development Conclusions 75 4.7.1 Building Type, End Use Disaggregation, and Geographic Area Analysis Conclusions75 4.7.2 Residential Survey Conclusions 75 3
  4. Page 4 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 4 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 4 of 142 5 6 4.7.3 Commercial Survey Conclusions 76 4.7.4 Contractor/Builder Interview Conclusions 76 4.7.5 Potential Conclusions 76 Alternative Portfolios 78 5.1 Demand Side Portfolios 79 5.2 Hybrid Portfolio Development 89 5.2.1 Hybrid Portfolio 1 89 5.2.2 Hybrid Portfolio 2 93 5.2.3 Supply Side Measures Supporting the Hybrid Portfolio 97 5.3 Results, and Recommendations 98 5.4 Electrification Analysis 100 5.5 Cost-Benefit Analysis 102 5.5.1 Included, but Not Quantified Costs and Benefits 105 5.5.2 Conclusion 106 Appendices 107 6.1 Measure-level Impacts per Premise 107 6.2 Residential Customer Survey Questionnaire 111 6.3 Commercial Customer Survey Questionnaire 124 6.4 Contractor/Builder Interview Guide 138 4
  5. Page 5 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 5 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 5 of 142 1 Executive Summary Public Service Company of Colorado (the Company), a subsidiary of Xcel Energy, is now in the midst of the Gas Infrastructure Plan (GIP) paradigm, having completed its initial GIP proceeding in 2023, with the first litigated GIP to be filed in 2025. The initial GIP filing focused on providing transparency into the processes for how the Company evaluates investments to ensure safety and reliability of the gas system and identified several projects needed to address the Company’s System Safety & Integrity, Capacity Expansion, New Business, and Mandatory Relocation requirements. The Company was given authority in that case, and its follow-on Clean Heat Plan proceeding, to pursue two smaller non-pipeline alternative (NPA) solutions to avoid gas infrastructure; Pearl Street Mall and the F-3 Reinforcement projects. Now, the Company has taken another step forward with its NPA Analysis process that continues to evolve. In this report, we describe how the Company is planning for the energy future of Colorado mountain communities by using its NPA Analysis process, designed to identify a cost-effective solution to address an urgent capacity constraint, which the Company has identified in its Eastern Mountain Gas System1. The Company collaborated with PA Consulting, APEX Analytics and Jacobs (the PA team) to perform the NPA Analysis, leveraging their industry insights and expertise in areas such as natural gas strategic planning, natural gas energy efficiency (EE) and other demand side management (DSM) modeling, and gas infrastructure engineering. As an integral part of the Company’s collaboration with the PA team, the Company worked with stakeholders, integrated stakeholder comments, especially when measuring and screening NPA measures for consideration. The PA team developed primary research surveys to further understand customer and stakeholder needs and expectations of the NPA Analysis, importantly including information around incentive levels to combat the diverse ownership of customers in the mountain region. Figure 1-1: The Company’s NPA Analysis Process The PA team began with a primary research study in the Company’s Eastern Mountain Gas System service territory, followed by the development of a series of potential alternative portfolios, which were composed primarily of natural gas DSM measures, including gas EE and beneficial electrification (BE), as well as other Design Day peak hour gas capacity reduction tools. The alternative portfolios were informed by stakeholder feedback and information gained from primary research. The alternative portfolios were then optimized for cost and greenhouse gas (GHG) emissions reduction objectives, while meeting operational requirements. The portfolio development process considered three high-level alternative portfolio types, each of which was projected to have the ability to mitigate the identified capacity constraint in the Eastern Mountain Gas System: 1 The Southern and Western Gas Systems will remain largely unaffected by the implementation of the NPA Portfolio 5
  6. Page 6 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 6 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 6 of 142 • • • Electric Portfolio – a portfolio composed of only customer side solutions. Includes gas DR, electrification, shell measures, and firm to interruptible service conversion, excluding gas consuming appliance incentives; NPA-Only Portfolios – two portfolios comprised of only customer side solutions. Includes gas DR, electrification, shell measures, firm to interruptible service conversion, and gas consuming appliance incentives; Hybrid Portfolios – two portfolios comprised of solutions optimized for least cost among all achievable potential solutions, utilizing a combination of gas infrastructure reinforcements (including modular liquified natural gas (LNG) and compressed natural gas (CNG) supplemental supply), and NPA measures and technologies. The Company provided a Gas-Only Portfolio to serve as a baseline of comparison for analysis. The alternative portfolios were then qualitatively and quantitatively evaluated and analyzed to identify the appropriate portfolio for use in mitigating the need for a new traditional natural gas infrastructure project in the Eastern Mountain Gas System. Following the development and analysis of these alternative portfolios, the analysis presented in this report and the associated cost-benefit analysis modelling tool supported the recommendation of Hybrid Portfolio 2 as the preferred alternative portfolio. Hybrid Portfolio 2 is projected to solve the capacity constraint, and best balances cost with supporting reduced reliance on gas infrastructure, focusing on the use of NPAs to drive the Company’s customers toward enduse decarbonization, and reducing Design Day peak demand on the gas system. Hybrid Portfolio 2 combines many DSM and other conservation and BE measures and programs with a reduced amount of natural gas infrastructure, including one modular LNG site and one CNG site to support system reliability. Hybrid Portfolio 2 reflects the least cost option identified through the cost-benefit analysis framework as compared to the baseline gas infrastructure solution. 6
  7. Page 7 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 7 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 7 of 142 2 Review of Scope In June 2023, the Company and the PA team began to collaborate on the Mountain Gas System NPA Analysis. The objective of NPA Analysis was to identify a cost-effective solution to address an urgent capacity constraint, which the Company had identified in its Eastern Mountain Gas System. 2.1 Scope of Work Overview To address the capacity constraint identified by the Company in the Eastern Mountain Gas System, the PA team took a multistep collaborative approach. The PA team worked closely with the Company to provide an overview of the gas system, working with the Company to review their planning process, and identify and understand the capacity constraint. The PA team worked with the Company’s customers and stakeholders, informed by primary research, to develop a custom list of potential NPA measures and technologies. The NPA Analysis process included primary research into the Company’s Eastern Mountain Gas System customers’ knowledge of and preferences for various DSM and other conservation measures and programs. The PA team assessed the potential of the NPA measures and technologies, and lastly, developed and evaluated alternative portfolios to cost-effectively alleviate the capacity constraint in the Eastern Mountain Gas System. Additionally, the NPA Analysis included an assessment of the impacts to the Mountain Electric System of increased electrification measures. The Mountain Gas System NPA Analysis scope of work included the development and evaluation of alternative portfolios, comprised of a variety of NPA measures and technologies, to potentially offset the need for the baseline gas infrastructure project proposed in the long-term plan for the Eastern Mountain Gas System. The capacity constraint in the Eastern Mountain Gas System could prohibit reliability and growth in sales to existing customers, new customers, structures, and facilities if not alleviated through a combination of measures. Specifically, the NPA Analysis presented in this report provides an assessment of the opportunity to utilize NPAs to avoid, defer, or potentially reduce a planned gas infrastructure project to alleviate the capacity constraint in the Eastern Mountain Gas System. 2.2 Overview of Mountain Energy NPA Analysis The core deliverables expected of the PA team as a product of the Mountain Gas System NPA Analysis included alternative portfolio development, comparative analysis and reporting, and stakeholder engagement. This report functions as a technical appendix to Company testimony, providing further details to the NPA Analysis and Potential Study. This report includes an expert review of the Company’s system planning, including an overview of sales and peak day demand, customer counts, and use per customer (UPC) trends. The report details the NPA DSM Solution Development Study, or Potential Study, that assessed the diversity and end-use of gas customers in the Eastern Mountain Gas System to inform the potential and feasibility for NPA measures and technologies in the various geographies of the area. This work included extensive residential and commercial customer surveys and primary research collection to develop a bespoke list of NPA measures that could be feasible for alleviating the capacity constraint. Lastly, the report details the development of five alternative portfolios, representing a combination of NPA measures and technologies, and determines the viability of each for alleviating the capacity constraint. If the capacity constraint could be alleviated, the alternative portfolios were tested for cost-effectiveness using a cost-benefit analysis framework. This report concludes with a recommendation of Hybrid Portfolio 2, as this portfolio successfully alleviates the capacity constraint in the Eastern Mountain Gas System, aligns with the Company’s emission reduction goals, and proves to be cost-effective. 7
  8. Page 8 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 8 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 8 of 142 3 Review of Planning Processes and the Need for an NPA Analysis The Company’s Eastern Mountain Gas System is experiencing an existing and forecasted capacity constraint, where customers are at risk of an outage during cold weather events such as Design Day conditions due to insufficient system pressure caused by customer gas demand growth and limited supply (capacity constraint). To resolve this capacity constraint, the peak demand requirements must be addressed. The Mountain Energy NPA Analysis, completed through collaboration between the PA team and the Company, aimed to alleviate the capacity constraint in the Eastern Mountain Gas System. To achieve this goal, the PA team worked with the Company to review key planning processes and further understand the capacity constraint in the region and understand the diversity of end-users effected by the capacity constraint. 3.1 Mountain Gas System Overview The Mountain Gas System serves 65,000 customers and three gas local distribution companies (LDCs). The system stretches from Boulder, Colorado to approximately Durango, Colorado and includes approximately 975 miles of transmission mains and eight compressor stations. The Company’s Mountain Gas System covers much of the mountainous terrain in Colorado. The system is composed of various pipelines, facilities, and appurtenances to transport gas throughout the Mountain System to supply the customers’ demand load. The Mountain Gas System is generally composed of three hydraulically separate systems on Design Day – the Western, Eastern, and Southern Mountain Gas System. The Eastern Mountain Gas System was the focus of the Mountain Energy NPA Analysis. Below, Figure 3-1 provides a map of the entire Mountain Gas System with directional gas flows into the Mountain Gas System from the major supply points. 8
  9. Page 9 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 9 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 9 of 142 Figure 3-1: Mountain Gas System Map The system is subdivided into three systems, Marshall Compressor Station (CS) Supply (red), Rifle CS Supply (green), and Tiffany CS Supply (cyan). These systems are interconnected, but during loading conditions, operate generally as three separate systems. The point of demarcation, or null point, is located just north of Leadville, CO. 9
  10. Page 10 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 10 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 10 of 142 The NPA Analysis presented in this report focuses on the Eastern Mountain Gas System, as demonstrated in Figure 3-2: Eastern Mountain Gas System. Figure 3-2: Eastern Mountain Gas System This area is also served by the Company’s Mountain Electric Distribution System, which includes eight distribution substations, twenty-five distribution feeders and two medium voltage classes (13.2kV and 24.9 kV). 3.2 System Constraints – the Need for an NPA Analysis The Company determined the Eastern Mountain Gas System cannot support the peak demand load on colder than Design Day conditions. The capacity shortfall is forecasted to increase approximately 0.9% through the 2033-2034 heating season and reach approximately 579 mscfh by 2033, as detailed in Figure 3-3. 10

Text of CLF-011 Attachment 18.pdf

Extracted from the file · 22 pages · 55,502 characters

Text of CLF-011 Attachment 19.pdf

Extracted from the file · 18 pages · 27,716 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)