Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Text of CLF-011 Attachment 17.pdf

Extracted from the file · 142 pages · 272,863 characters

Text of CLF-011 Attachment 18.pdf

Extracted from the file · 22 pages · 55,502 characters

  1. Page 1 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 1 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 1 of 17 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * ) ) ) ) ) ) ) ) ) Colorado PUC E-Filings System IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF THE MOUNTAIN ENERGY PROJECT AND ASSOCIATED CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR SUPPLEMENTAL SUPPLY PROCEEDING NO. 25A-0044EG REBUTTAL TESTIMONY OF JORDAN MANN ON BEHALF OF PUBLIC SERVICE COMPANY OF COLORADO July 3, 2025
  2. Page 2 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 2 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 2 of 17 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF THE MOUNTAIN ENERGY PROJECT AND ASSOCIATED CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR SUPPLEMENTAL SUPPLY ) ) ) ) ) ) ) ) ) PROCEEDING NO. 25A-0044EG REBUTTAL TESTIMONY OF JORDAN MANN TABLE OF CONTENTS SECTION I. PAGE INTRODUCTION, QUALIFICATIONS, AND PURPOSE OF TESTIMONY .............. 3 II. NPA POTENTIAL STUDY ........................................................................................ 5 A. Reasonableness of the Potential Study ........................................................ ..5 B. Potential Study Adoption Rates ..................................................................... ..9 III. NPA MEASURES ................................................................................................... 11
  3. Page 3 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 3 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 3 of 17 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF THE MOUNTAIN ENERGY PROJECT AND ASSOCIATED CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR SUPPLEMENTAL SUPPLY ) ) ) ) ) ) ) ) ) PROCEEDING NO. 25A-0044EG REBUTTAL TESTIMONY OF JORDAN MANN I. 1 PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 2 3 INTRODUCTION, QUALIFICATIONS, AND PURPOSE OF TESTIMONY A. My name is Jordan Mann. My business address is 2500 30th Street, Suite 207 4 Boulder, Colorado 80301. 5 BY WHOM ARE YOU EMPLOYED AND IN WHAT POSITION? 6 A. I am employed by Apex Analytics LLC (“Apex”) as a Project Director. Apex was 7 formed in 2011 with the goal of providing the highest-quality research, planning, 8 and strategic support for clean energy programs. 9 professionals with backgrounds in economics, mathematics, engineering, data 10 science, behavioral science, qualitative research, and market research. 11 Consulting partnered with Apex (“the PA team”) to support Public Service 12 Company of Colorado (“Public Service” or the “Company”) in assessing the Apex has a team of 16 PA
  4. Page 4 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 4 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 4 of 17 1 achievable potential of peak hour gas demand reduction in the mountain region.1 2 A description of my qualifications, duties, and responsibilities is set forth in my 3 Statement of Qualifications at the conclusion of my testimony. 4 ON WHOSE BEHALF ARE YOU TESTIFYING IN THE PROCEEDING? 5 A. I am testifying on behalf of Public Service. 6 DID 7 PROCEEDING? 8 A. PREVIOUSLY PROVIDE DIRECT TESTIMONY IN THIS No, I did not. WHAT IS THE PURPOSE OF YOUR REBUTTAL TESTIMONY? 9 10 YOU A. My Rebuttal Testimony provides information about the potential study conducted 11 for the Eastern Mountain Gas System (the “Potential Study”) as well as information 12 and estimated adoption rates regarding certain non-pipeline alternative (“NPA”) 13 measures. 1 See Hrg. Ex. 102, Attachment GJK-2, section 4.3 at 20 (Jones Direct) for a map of the mountain region.
  5. Page 5 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 5 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 5 of 17 II. 1 WHAT IS THE PURPOSE OF THIS SECTION OF YOUR TESTIMONY? 2 3 NPA POTENTIAL STUDY A. This section of my testimony supports the discussion of the Potential Study in 4 section II.A. of Company witness Kerry R. Klemm’s Rebuttal Testimony. 5 particular, I describe the methodology of the Potential Study to estimate potential 6 peak gas demand reduction of the NPA portfolio in the mountain region. Additional 7 information about the Potential Study and results can be found in Hearing Exhibit 8 102, Attachment GKJ-2, the Mountain Energy Project Non-Pipeline Alternative 9 Report. 10 measures addressed in section II.D. of witness Klemm’s Rebuttal Testimony. 11 A. Reasonableness of the Potential Study 12 DID OTHER PARTIES RAISE CONCERNS WITH ASPECTS OF THE 13 COMPANY’S APPROACH TO THE POTENTIAL STUDY? 14 A. Yes. In I also discuss the Potential Study’s adoption rates for certain NPA For example, as noted in Ms. Klemm’s Rebuttal Testimony, Mountain 15 Community Coalition (“MCC”) witness Kenji Takahashi asserted that the 16 Company’s approach to the NPA Potential Study results in “a substantial 17 underestimation of demand-side potential to meet system needs.”2 18 Southwest Energy Efficiency Project (“SWEEP”) witness Justin Brant asserted that 19 the Company “overstated the cost of NPA measures and understated their 20 potential to reduce peak hour gas demand.”3 2 3 Hrg. Ex. 601 at 10:5-11 (Takahashi Answer). Hrg. Ex. 500 at 18:14-15 (Brant Answer). Similarly,
  6. Page 6 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 6 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 6 of 17 1 DID THE POTENTIAL STUDY REASONABLY ASSESS THE POTENTIAL OF 2 VARIOUS NPA MEASURES TO REDUCE PEAK GAS DEMAND? 3 A. Yes. The Potential Study followed industry best practices, including in the 4 assessment of the technical and achievable potential of the NPA portfolio. 5 HOW DID THE POTENTIAL STUDY ASSESS TECHNICAL POTENTIAL? 6 A. The Potential Study estimated technical potential by first identifying measures that 7 reduce peak hour gas consumption. The PA team created a comprehensive list 8 of measures as part of the Study development process addressed in the 9 Company’s Direct Testimony in order to identify all measures that could potentially 10 reduce peak gas demand. Measures then went through a qualitative screen where 11 they were rated on a one to five scale on the size of peak savings, commercial 12 availability of the measure, customer acceptance of solution, availability of 13 contractors to install such measures, ease of implementation, and greenhouse gas 14 emission impacts. 15 Next the savings potential for each included measure was calculated with 16 reliance on the Company’s Demand Side Management (“DSM”) Technical 17 Reference Manual assumptions when possible. Measure savings potential was 18 further calibrated by the annual consumption and peak hour gas consumption per 19 customer in the mountain region. The total technical potential of each individual 20 measure is the peak hour reduction achieved if the efficient measure replaced all 21 inefficient measures instantaneously. The total technical potential of all measures 22 is the sum of all individual measures except for the case where multiple efficient 23 measure technologies can replace a single inefficient measure (for example an
  7. Page 7 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 7 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 7 of 17 1 inefficient furnace could be replaced with an efficient furnace or an air source heat 2 pump). In the case where multiple efficient measure technologies can replace a 3 single inefficient measure, the measure with the highest technical potential is used 4 and the measure(s) with lower technical potential are ignored. Technical potential 5 is a first step in assessing the overall state of the market; however, it is not useful 6 for setting policy since what is technically achievable is not practically achievable. 7 HOW DID THE POTENTIAL STUDY ASSESS ECONOMIC POTENTIAL? 8 A. WHY DID THE POTENTIAL STUDY NOT ASSESS ECONOMIC POTENTIAL? 9 10 The study did not assess economic potential. A. Economic potential is an intermediary step in which an economic screen using a 11 cost test is applied to measures to remove them from consideration in the 12 achievable potential step. Most commonly, a total resource cost (“TRC”) test is 13 used and measures with a TRC below 1.0 are excluded from consideration in the 14 achievable potential. For the Potential Study, the study goal was to compare a 15 suite of measures that could alleviate a constraint in the physical infrastructure of 16 the gas system and compare that approach to a gas infrastructure solution. A 17 measure could have a TRC below 1.0, but still be part of a portfolio that is more 18 cost-effective than a gas infrastructure solution. Conversely, a measure could 19 have a TRC above 1.0 but not save any peak hour gas. In addition, at the time of 20 the potential study, the value for a key benefit, the area-specific avoided cost of 21 peak hour gas capacity, was not defined. 22 potential using a cost-effectiveness screen, an economic screen based on the 23 expanded rate impact measure test or incentives higher than $100,000/mscfh-year Instead of a traditional economic
  8. Page 8 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 8 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 8 of 17 1 was used. This screen eliminated measures that produce very little savings for the 2 incentive spend required. Ultimately this screen removed measures that make up 3 less than two percent of the total achievable potential. 4 HOW DID THE POTENTIAL STUDY ASSESS ACHIEVABLE POTENTIAL? 5 A. The Potential Study assessed achievable potential by forecasting the uptake of 6 each included technology under a scenario where incentives were set equal to the 7 incremental cost of each measure. The forecasting methodology used in the 8 Potential Study was a bass diffusion model. For a characterization of the building 9 stock’s equipment, the Potential Study used the Company’s most current Colorado 10 DSM potential study to characterize the density (i.e., the prevalence of a 11 technology) and efficient saturation of technologies in the residential and 12 commercial sectors. The estimate of current consumption was calibrated to the 13 actual customers’ consumption for each geography in the mountain region. The 14 team collected primary data specific to customers in the mountain region to assess 15 customers’ willingness to adopt specific technologies. 16 forecasting methodology uses the current market share of a technology as a 17 starting point and then creates an s-shaped adoption curve with the end point 18 being equal to the proportion of customers willing to adopt a technology with 19 incentives equal to incremental measure cost, which is informed by the team’s 20 primary research. The rate at which the technology is adopted between the start 21 point of current market share and the long-run market share is determined by the 22 bass diffusion coefficients of innovation (p) and innovation (q). A coefficient set 23 which represents a relatively aggressive level of market diffusion was selected. The bass diffusion
  9. Page 9 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 9 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 9 of 17 1 The overall level of adoption of these technologies represents achievements that 2 are significantly higher than the current adoption levels achieved by existing DSM 3 offerings in the region. 4 The primary data collection, use of the Public Service prior DSM potential 5 study, actual mountain region customer data, and best-practice bass diffusion 6 forecasting methodologies together resulted in a study that is as accurate as 7 possible. In summary, the Potential Study reasonably assessed the potential of 8 various NPA measures to reduce peak gas demand. 9 B. Potential Study Adoption Rates 10 PLEASE OUTLINE INTERVENOR POSITIONS ON THE NPA ADOPTION 11 RATES ASSUMED USED IN THE POTENTIAL STUDY. 12 A. As noted in Ms. Klemm’s Rebuttal Testimony, Staff and Utility Consumer Advocate 13 (“UCA”) suggest the Company has overestimated the NPA measure adoption 14 rates,4 while MCC, SWEEP, and Sierra Club suggest the Company has 15 underestimated NPA measure adoption rates.5 16 HOW DID THE POTENTIAL STUDY CALCULATE ADOPTION RATES FOR 17 NPA MEASURES? 18 A. The Potential study relied on primary data collection from customers in the 19 mountain region to assess potential participants’ willingness to adopt peak gas 20 saving technologies. The percentage of customers willing to adopt a technology 21 with incentives equal to the full incremental cost of the technology is the expected 4 Hrg. Ex. 900 at 20:4-5 (LaMere Answer); Hrg. Ex. 400 at 17:15-17 (Henry-Sermos Answer). Hrg. Ex. 601 at 13:5-6 (Takahashi Answer); Hrg. Ex. 500 at 19:1-2 (Brant Answer); Hrg. Ex. 700, Rev. 1, at 21:4-6 (Brown Answer). 5
  10. Page 10 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 19 Page 10 of 18 Hearing Exhibit 115, Rebuttal Testimony of Jordan Mann Proceeding No. 25A-0044EG Page 10 of 17 1 long-run market share of a technology. The Potential Study used a bass diffusion 2 model to estimate each technology’s adoption, starting with the current market 3 share of the technology and ending at the expected long run market share of the 4 technology. The high level of incentives and intensive outreach activities planned 5 for the Mountain Energy Project led the team to choose relatively aggressive 6 adoption curve coefficients. Based on the novel nature of the Mountain Energy 7 Project, high level of incentives, and current low market share of electric space 8 heating technologies in the mountain region, the Company believes that this 9 forecast does have some level of uncertainty. Implementation of the NPA portfolio 10 will provide the Company evidence of actual customer uptake of the NPA portfolio 11 and assist the Company in determining whether adjustments to the NPA are 12 necessary to increase participation. The Company maintains that the potential 13 study, based upon reasonable adoption rates, accurately assesses the potential 14 savings available in the mountain region through the NPA portfolio.

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)