Interrogatory responses
Answers to questions 11
Files6
CLF-011 Attachment 14.pdf
PDF · 3.1 MB · 23 pagesText searchable
Download CLF-011 Attachment 14.pdfRead the text of CLF-011 Attachment 14.pdf
CLF-011 Attachment 15.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download CLF-011 Attachment 15.pdfRead the text of CLF-011 Attachment 15.pdf
CLF-011 Attachment 16.pdf
PDF · 4.6 MB · 20 pagesText searchable
Download CLF-011 Attachment 16.pdfRead the text of CLF-011 Attachment 16.pdf
CLF-011 Attachment 17.pdf
PDF · 4.3 MB · 142 pagesText searchable
Download CLF-011 Attachment 17.pdfRead the text of CLF-011 Attachment 17.pdf
CLF-011 Attachment 18.pdf
PDF · 2.1 MB · 22 pagesText searchable
Download CLF-011 Attachment 18.pdfRead the text of CLF-011 Attachment 18.pdf
CLF-011 Attachment 19.pdf
PDF · 1.9 MB · 18 pagesText searchable
Download CLF-011 Attachment 19.pdfRead the text of CLF-011 Attachment 19.pdf
Page 101 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 101 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 101 of 142 energy consumption during peak hour. Add up the peak hour electricity consumption to estimate peak hour electricity demand. 2. Estimate the total added electric demand for 100% electrification for each geographic area in the analysis by summing up the premise-level results from step 1. 3. Compile the estimated added electric demand for each geographic area in Hybrid Portfolio 2, after making adjustments for the planned area for implementation (Area 2, Area 3, and Grand Lake). 4. For each geography, derive the ratio of total potential electric demand increase by dividing the results of step 3 by the results of step 4. 5. For each feeder, estimate the added peak electric demand for 100% electrification by summing up the results of step 1 the feeder level. 6. Map each feeder to a geographic area. 7. For each feeder, multiply the results of step 5 by the electric demand increase ratio for the geographic area corresponding to each feeder to get feeder-level winter peak demand increases. The resulting winter peak demand increases from the hybrid NPA solution, for each feeder, by year, are shown in Table 5-6 below. Increases stop after 2029, because electrification measures are assumed to be discontinued in Hybrid Portfolio 2 after 2029, along with other measures with poor cost-effectiveness. 101Page 102 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 102 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 102 of 142 Table 5-6. Hybrid Portfolio 2 Winter Peak Demand Increase by Feeder and Year Cumulative Winter Peak Demand Increase by Year (kW) Feeder 2025 2026 2027 2028 2029 2030 2031 2032 2033 BREC2564M 63 145 252 396 585 585 585 585 584 BREC2565M 118 271 473 740 1,091 1,091 1,091 1,090 1,090 BREC2566M 50 116 202 315 461 461 461 461 461 BREC2568M 53 123 214 332 486 486 486 486 486 CLIM2531M 25 58 101 157 228 228 228 228 228 DILL2556M 34 79 137 214 315 315 315 315 315 DILL2557M 34 79 137 214 316 316 316 316 316 DILL2558M 13 30 53 82 120 120 120 120 120 DILL2559M 45 104 181 285 423 423 422 422 422 DILL2591M 6 13 22 34 50 50 50 50 50 GILM2525M 4 9 16 24 36 36 36 36 36 LEAD1205M 3 6 11 17 26 26 26 26 26 LEAD1207M 7 15 27 42 62 62 62 62 62 LEAD1209M 35 81 142 222 327 327 327 327 327 MAYF2541M 28 66 114 177 258 258 258 258 258 MAYF2542M 26 60 105 164 241 241 241 241 241 PTAR2105M 71 163 284 444 655 655 655 654 654 PTAR2107M 79 183 320 501 741 741 741 741 741 SUMM2604M 89 206 359 562 829 829 829 829 828 SUMM2605M 28 65 114 178 263 263 263 263 263 SUMM2606M 30 70 123 191 281 280 280 280 280 5.5 Cost-Benefit Analysis The cost-benefit analysis provides the framework and support for evaluating the preferred Hybrid Portfolio 2 as compared to a gas infrastructure solution.20 The primary cost effectiveness test and the modified total resource cost test measures the net cost and benefits of an alternative portfolio, including both energy savings and non-energy benefits. These include utility incentives, equipment costs, and utility system cost that result from the implementation of NPAs, as well as social impacts such as avoided social emissions cost and other non-energy benefits. To support the alternative portfolio results and recommendation, a primary and secondary cost effectiveness tests were calculated through a cost-benefit analysis framework. A modified total resource cost test, which is modified to include the benefit of avoided social emissions and other non-energy benefits, was utilized as the primary cost effectiveness test. An expanded ratepayer impact measure test was utilized as a secondary test to review the potential impacts to electric and gas customer rates and was expanded to include the benefit of 20 The PA team ran the cost-benefit analysis of both Hybrid Portfolio 1 and Hybrid Portfolio 2. Hybrid Portfolio 2 resulted in being more cost-effective under both the primary modified total resource cost and the secondary expanded, rate-payer impact measure test, leading to Hybrid Portfolio 2 being compared to the baseline gas infrastructure solution within this section. 102Page 103 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 103 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 103 of 142 avoided social emissions and other non-energy benefits. The modified total resource cost test resulted in a net present value of cost of $128 million for Hybrid Portfolio 2 and expanded ratepayer impact measure test results in a net present value cost of $140 million. Hybrid Portfolio 2 reflected the least cost option with the cost-benefit analysis framework reflecting favorable results compared to the gas-only solution. A breakdown of the cost-benefit analysis for Hybrid Portfolio 2 can be seen in Figure 5-23 as compared to the minimum gas infrastructure solution cost. Figure 5-23: Recommended Hybrid Portfolio 2 EMTRC NPV Cost-Benefit Analysis – Minimum Gas Infrastructure $98 $(22) $(16) $(2) $128 $106 $29 $41 The Hybrid Portfolio 2 total net present value cost included $41 million for NPA program cost and $29 million for electric system upgrade cost. These costs were offset by benefits for a total net cost for the recommended Hybrid Portfolio 2 of $128 million. These benefits included $22 million benefits from avoided social emissions, $16 million in avoided gas usage, and $2 million which reflect other non-energy benefits. The baseline gas infrastructure solution, provided by the Company, resulted in a cost of $106 million for the minimum scenario and cost of $285 million for the maximum scenario. Figure 5-24 shows the breakdown of the cost-benefit analysis for Hybrid Portfolio 2 as compared to the maximum gas infrastructure solution cost and Figure 5-25 shows the results of the cost-benefit analysis for Hybrid Portfolio 2 as compared to the minimum and maximum gas infrastructure cost. 103Page 104 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 104 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 104 of 142 Figure 5-24: Recommended Hybrid Portfolio 2 EMTRC NPV Cost-Benefit Analysis – Maximum Gas Infrastructure $285 $98 $(22) $(16) $(2) $29 $41 104 $128Page 105 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 105 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 105 of 142 Figure 5-25: Recommended Hybrid Portfolio 2 NPV Cost-Benefit Analysis – Minimum and Maximum Gas Infrastructure $300,000,000 $285 $250,000,000 $200,000,000 $150,000,000 $128 $106 $100,000,000 $50,000,000 $0 Portfolio Net Cost Min Gas Infrastructure Max Gas Infrastructure 5.5.1 Included, but Not Quantified Costs and Benefits Many costs and benefits were considered within the cost-benefit analysis framework to evaluate the NPA alternative portfolio as compared to the gas infrastructure solution. Some of these costs and benefits, although considered, are not explicitly quantified within the cost-benefit analysis, referred to as not applicable (N/A) within other PA generated documentation. These cost and benefit impacts are either expected to be minimal or they lack a defensible method for quantification. There are other costs and benefits within the tool that are included, but not quantified (INQ). This means that the component of the analysis was considered as important to the analysis but was challenging, if not impossible, to quantify. The aspects of the analysis would include, but are not limited to, electric reliability cost, NPA reliability benefits, air pollutants, incremental generation methane leakage cost, end of life replacement benefit, upstream benefit, avoided CHP compliance benefit, stranded asset risk, and gas commodity variability benefit. • Electric reliability cost reflects the incremental investments that may be required to support the reliability of the Company’s electric system such as restoration cost or outage cost. Electric reliability costs are considered but not explicitly quantified given lack of defensible method and approach. • NPA solutions can provide benefits to host by either preventing outages or by reducing the length of outage events. NPA reliability benefits are not quantified explicitly, but the beneficial impact they can provide are considered. • Air quality and human health can deteriorate due to increased concentration of pollutants like PM 2.5, SO2, and NOX. It is considered that NPA solutions can help reduce the amount of air pollutants, but it is not explicitly quantified. • Incremental generation methane leakage cost can occur due to the potential increased need to procure fossil-fired generation to support increased electric usage. Incremental generation methane leakage cost is not quantified explicitly in this cost-benefit analysis framework. 105Page 106 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 106 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 106 of 142 • End of life replacement benefit represents a potential benefit value of the avoided future replacement cost of the existing equipment. This is not quantified explicitly given the lack of quantifiable method. • Upstream benefits reflect a potential benefit of the value of avoided costs such as the cost to acquire upstream pipeline capacity to deliver gas to the Company’s system. These benefits are not quantified explicitly in this framework. • Avoided CHP compliance benefit represents potential value of avoided cost associated with GHG reductions which would be achieved through incremental spend via other programs. This would only be considered if the NPA portfolio is incremental to CHP. • Stranded Asset risk reflect a potential benefit value of reduced risk of assets becoming stranded prior to being fully depreciated. This is not quantified explicitly in this framework given the lack of defensible quantification methodology. • Gas commodity variability benefit represents the potential benefit of the value of avoided exposure to gas commodity cost fluctuations due to reduced dependence on natural gas. This potential benefit is acknowledged in this framework, but not quantified explicitly. 5.5.2 Conclusion The analysis of the considered alternative portfolios demonstrates that Hybrid Portfolio 2 represents the most effective solution for addressing the Eastern Mountain Gas System’s capacity constraints. Hybrid Portfolio 2 combines a suite of NPA measures, including gas demand response programs, energy efficient gas appliances, and building shell measures, as well as modular LNG and CNG supplemental supply. Of the alternatives considered, this portfolio best balances cost-effectiveness with environmental considerations and operational flexibility. While the potential analysis indicates that NPA measures alone fail to close the current and forecasted constraint, by combining NPA measures with supplemental supply infrastructure, Hybrid Portfolio 2 is able to solve the constraint while achieving a 150% reduction in emissions compared to the maximum gas infrastructure solution, and at a significantly lower cost than Hybrid Portfolio 1. In addition, Hybrid Portfolio 2 allows for an implementation pathway that maintains optionality for removal of supplementary supply infrastructure should NPA measures be adopted at a faster rate than anticipated, or conversely ensures sufficient supply should NPA adoption lag expectations, while avoiding the stranded asset risk associated with the alternative gas-only infrastructure solution. Of the options considered, Hybrid Portfolio 2 represents the best option for addressing the gas supply constraint, while balancing cost, environmental considerations, and operational flexibility. 106Page 107 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 107 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 107 of 142 6 Appendices 6.1 Measure-level Impacts per Premise Table 6-1: Residential Single Family Weighted Average Measure Characteristics NPA Measure Name Air Sealing_Res_Space Heat_Retrofit Attic Insulation_Res_Space Heat_Retrofit Behavioral DR_Res_DR_Retrofit Boiler Electrification with ccASHP_Res_Space Heat_Early Boiler Electrification with ccASHP_Res_Space Heat_ROB Energy Star New Home_Res_Space Heat_New Furnace Electrification with ccASHP_Res_Space Heat_Early Furnace Electrification with ccASHP_Res_Space Heat_ROB Gas Furnace Replacement_Res_Space Heat_Early Gas Furnace Replacement_Res_Space Heat_ROB Ground Source Heat Pump_Res_Space Heat_Early Ground Source Heat Pump_Res_Space Heat_ROB High Efficiency Boiler Upgrade_Res_Space Heat_Early High Efficiency Boiler Upgrade_Res_Space Heat_ROB Home Energy Report_Res_Space Heat_New Home Energy Report_Res_Space Heat_Retrofit Low Flow Aerator, Bathroom_Res_Water Heat_Retrofit Low Flow Aerator, Kitchen_Res_Water Heat_Retrofit Low Flow Showerhead_Res_Water Heat_Retrofit Other Space Heat Electrification with ccASHP_Res_Space Heat_Early Storm Windows_Res_Space Heat_Retrofit Thermostat DR_Res_DR_Retrofit Wall Insulation_Res_Space Heat_Retrofit Whole Building Electrification_Res_Space Heat_New Measure Life (years) 10 20 1 18 18 20 18 18 18 18 20 20 20 20 1 1 10 10 10 18 20 1 20 18 Peak hour demand reduction per unit (mscfh) 0.0138 0.0082 0.0003 0.0690 0.0687 0.0151 0.0690 0.0690 0.0182 0.0183 0.0730 0.0729 0.0122 0.0122 0.0014 0.0015 0.0000 0.0000 0.0001 0.0690 0.0020 0.0110 0.0233 0.0720 107 Peak day demand reduction per unit (mscfd) 0.249 0.147 0.005 1.243 1.237 0.271 1.242 1.242 0.328 0.329 1.314 1.314 0.220 0.220 0.026 0.026 0.000 0.000 0.001 1.243 0.039 0.198 0.420 1.296 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 20.34 -0.02 -46 $492 12.00 0.00 0 $2,213 0.00 0.00 0 $10 101.54 16.68 12360 $17,872 101.07 16.60 12303 $8,322 22.15 -0.33 -1035 $3,559 101.49 16.67 12360 $17,872 101.49 16.66 12360 $11,544 26.83 0.00 0 $4,149 26.90 0.00 0 $1,313 107.68 5.89 8229 $74,019 107.68 5.90 8229 $67,846 17.99 0.00 0 $4,408 17.99 0.00 0 $1,346 2.14 0.00 -152 $4 2.14 0.00 -152 $4 0.26 0.00 0 $1 0.25 0.00 0 $2 2.03 0.00 0 $3 101.54 16.71 12360 $17,872 3.22 0.00 -771 $149 0.01 0.00 0 $51 34.28 0.00 0 $1,458 106.01 17.41 -2 $18,408Page 108 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 108 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 108 of 142 Table 6-2: Residential Multifamily Weighted Average Measure Characteristics NPA Measure Name Air Sealing_Res_Space Heat_Retrofit Attic Insulation_Res_Space Heat_Retrofit Behavioral DR_Res_DR_Retrofit Boiler Electrification with ccASHP_Res_Space Heat_Early Boiler Electrification with ccASHP_Res_Space Heat_ROB Energy Star New Home_Res_Space Heat_New Furnace Electrification with ccASHP_Res_Space Heat_Early Furnace Electrification with ccASHP_Res_Space Heat_ROB Gas Furnace Replacement_Res_Space Heat_Early Gas Furnace Replacement_Res_Space Heat_ROB Ground Source Heat Pump_Res_Space Heat_Early Ground Source Heat Pump_Res_Space Heat_ROB High Efficiency Boiler Upgrade_Res_Space Heat_Early High Efficiency Boiler Upgrade_Res_Space Heat_ROB Home Energy Report_Res_Space Heat_New Home Energy Report_Res_Space Heat_Retrofit Low Flow Aerator, Bathroom_Res_Water Heat_Retrofit Low Flow Aerator, Kitchen_Res_Water Heat_Retrofit Low Flow Showerhead_Res_Water Heat_Retrofit Other Space Heat Electrification with ccASHP_Res_Space Heat_Early Storm Windows_Res_Space Heat_Retrofit Thermostat DR_Res_DR_Retrofit Wall Insulation_Res_Space Heat_Retrofit Whole Building Electrification_Res_Space Heat_New Measure Life (years) 10 20 1 18 18 20 18 18 18 18 20 20 20 20 1 1 10 10 10 18 20 1 20 18 Peak hour demand reduction per unit (mscfh) 0.0106 0.0062 0.0002 0.0525 0.0523 0.0115 0.0526 0.0525 0.0139 0.0139 0.0557 0.0571 0.0093 0.0093 0.0011 0.0011 0.0000 0.0000 0.0000 0.0528 0.0003 0.0084 0.0177 0.0548 108 Peak day demand reduction per unit (mscfd) 0.190 0.112 0.004 0.947 0.943 0.207 0.946 0.947 0.250 0.251 1.002 1.001 0.168 0.168 0.020 0.020 0.000 0.000 0.001 0.947 0.030 0.151 0.320 0.987 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 15.50 -0.01 -35 $375 9.14 0.00 0 $1,686 0.00 0.00 0 $8 77.36 12.70 9417 $13,617 77.01 12.67 9374 $6,341 16.88 -0.25 -789 $2,711 77.32 12.70 9417 $13,617 77.32 12.71 9417 $8,796 20.44 0.00 0 $3,161 20.50 0.00 0 $1,000 82.04 4.48 6270 $56,395 82.04 4.57 6270 $51,692 13.71 0.00 0 $3,358 13.71 0.00 0 $1,025 1.63 0.00 -116 $3 1.63 0.00 -116 $3 0.20 0.00 0 $0 0.19 0.00 0 $1 1.55 0.00 0 $3 77.36 12.75 9417 $13,617 2.45 0.00 -587 $114 0.01 0.00 0 $39 26.12 0.00 0 $1,111 80.77 13.25 -1 $14,025Page 109 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 109 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 109 of 142 Table 6-3: Commercial Weighted Average Measure Characteristics NPA Measure Name Com Air Sealing_Com_Space Heat_Retrofit Com ASHP_Com_Space Heat_Early Com ASHP_Com_Space Heat_ROB Com Gas Condensing Boiler_Com_Space Heat_Early Com Gas Condensing Boiler_Com_Space Heat_ROB Com Gas Furnace_Com_Space Heat_Early Com Gas Furnace_Com_Space Heat_ROB Com Load Shedding_Com_DR_Retrofit Com VRF_Com_Space Heat_Early Com VRF_Com_Space Heat_ROB Commercial Roof Insulation_Com_Space Heat_Retrofit Commercial Wall Insulation_Com_Space Heat_Retrofit Commercial Windows_Com_Space Heat_Retrofit Gas Process Condensing Boiler_Com_Process_ROB Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_ROB Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_ROB HPWH_Com_Water Heat_ROB Measure Life (years) 20 20 20 20 20 20 20 1 16 16 20 20 20 20 20 20 20 20 15 Peak hour demand reduction per unit (mscfh) 0.0202 0.1599 0.1590 0.0243 0.0243 0.0252 0.0251 0.4354 0.1598 0.1590 0.0277 0.0905 0.0891 0.0000 0.1759 0.1702 0.1748 0.1719 0.0012 Peak day demand reduction per unit (mscfd) 0.367 2.876 2.876 0.437 0.437 0.454 0.454 7.838 2.875 2.876 0.505 1.646 1.607 0.000 3.155 3.066 3.155 3.067 0.045 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 31.61 0.00 0 $33,622 244.95 38.09 29770 $18,924 244.95 38.13 29770 $7,750 37.26 0.00 0 $8,165 37.26 0.00 0 $3,629 38.66 0.00 0 $3,629 38.66 0.00 0 $3,629 0.44 0.00 0 $4,898 244.95 15.22 29770 $74,368 244.95 15.26 29770 $62,941 43.04 0.00 0 $7,409 140.31 0.00 0 $38,802 136.87 0.00 0 $33,185 2.25 0.00 0 $219 259.80 16.09 19178 $203,680 256.29 15.78 18919 $191,773 259.80 16.19 19178 $203,680 256.29 16.03 18919 $191,773 26.34 0.10 1943 $1,003 Table 6-4: Commercial Multifamily Weighted Average Measure Characteristics NPA Measure Name Com Air Sealing_Com_Space Heat_Retrofit Com ASHP_Com_Space Heat_Early Com ASHP_Com_Space Heat_ROB Com Gas Condensing Boiler_Com_Space Heat_Early Com Gas Condensing Boiler_Com_Space Heat_ROB Com Gas Furnace_Com_Space Heat_Early Com Gas Furnace_Com_Space Heat_ROB Com Load Shedding_Com_DR_Retrofit Com VRF_Com_Space Heat_Early Com VRF_Com_Space Heat_ROB Commercial Roof Insulation_Com_Space Heat_Retrofit Commercial Wall Insulation_Com_Space Heat_Retrofit Commercial Windows_Com_Space Heat_Retrofit Gas Process Condensing Boiler_Com_Process_ROB Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_ROB Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_ROB HPWH_Com_Water Heat_ROB Measure Life (years) 20 20 20 20 20 20 20 1 16 16 20 20 20 20 20 20 20 20 15 Peak hour demand reduction per unit (mscfh) 0.0258 0.2048 0.2073 0.0314 0.0312 0.0318 0.0317 0.5064 0.2045 0.2000 0.0340 0.1121 0.1083 0.0000 0.2190 0.2126 0.2187 0.2117 0.0013 109 Peak day demand reduction per unit (mscfd) 0.487 3.673 3.672 0.559 0.559 0.580 0.580 9.122 3.672 3.671 0.645 2.105 2.057 0.000 3.885 3.832 3.886 3.836 0.103 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 35.28 0.00 0 $37,518 285.11 44.31 34651 $22,027 285.12 44.36 34651 $9,021 43.37 0.00 0 $9,503 43.37 0.00 0 $4,224 45.00 0.00 0 $4,224 45.00 0.00 0 $4,224 0.51 0.00 0 $5,697 285.11 17.72 34651 $86,562 285.11 17.34 34651 $73,260 50.10 0.00 0 $8,624 163.31 0.00 0 $45,164 159.31 0.00 0 $38,626 0.00 0.00 0 $0 286.36 17.83 21139 $224,502 288.54 17.42 21299 $215,900 286.35 17.86 21139 $224,502 288.54 17.25 21300 $215,900 109.76 0.40 8096 $4,181Page 110 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 110 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 110 of 142 Table 6-5: Transport Weighted Average Measure Characteristics NPA Measure Name Com Air Sealing_Com_Space Heat_Retrofit Com ASHP_Com_Space Heat_Early Com ASHP_Com_Space Heat_ROB Com Gas Condensing Boiler_Com_Space Heat_Early Com Gas Condensing Boiler_Com_Space Heat_ROB Com Gas Furnace_Com_Space Heat_Early Com Gas Furnace_Com_Space Heat_ROB Com Load Shedding_Com_DR_Retrofit Com VRF_Com_Space Heat_Early Com VRF_Com_Space Heat_ROB Commercial Roof Insulation_Com_Space Heat_Retrofit Commercial Wall Insulation_Com_Space Heat_Retrofit Commercial Windows_Com_Space Heat_Retrofit Gas Process Condensing Boiler_Com_Process_ROB Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_ROB Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_ROB HPWH_Com_Water Heat_ROB Measure Life (years) 20 20 20 20 20 20 20 1 16 16 20 20 20 20 20 20 20 20 15 Peak hour demand reduction per unit (mscfh) 0.1914 1.6564 1.6529 0.2518 0.2523 0.2617 0.2619 4.5771 1.6544 1.6622 0.2897 0.9447 0.9247 0.0000 1.6440 1.6829 1.6451 1.6785 0.0830 Peak day demand reduction per unit (mscfd) 3.476 29.810 29.810 4.534 4.534 4.704 4.704 82.375 29.811 29.804 5.240 17.076 16.654 0.113 29.584 30.241 29.578 30.241 1.572 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 294.16 0.00 0 $312,843 2574.31 400.15 312873 $198,882 2574.32 400.34 312873 $81,450 391.56 0.00 0 $85,807 391.56 0.00 0 $38,137 406.28 0.00 0 $38,137 406.28 0.00 0 $38,137 4.58 0.00 0 $51,492 2574.32 159.99 312873 $781,580 2574.30 160.03 312871 $661,475 452.36 0.00 0 $77,865 1474.61 0.00 0 $407,791 1438.48 0.00 0 $348,762 57.22 0.00 0 $5,587 2543.86 158.29 187787 $1,994,371 2619.90 162.79 193400 $1,960,382 2543.86 158.12 187787 $1,994,373 2619.93 162.68 193402 $1,960,405 415.69 2.57 30663 $15,836 Table 6-6: Transport Multifamily Weighted Average Measure Characteristics NPA Measure Name Com Air Sealing_Com_Space Heat_Retrofit Com ASHP_Com_Space Heat_Early Com ASHP_Com_Space Heat_ROB Com Gas Condensing Boiler_Com_Space Heat_Early Com Gas Condensing Boiler_Com_Space Heat_ROB Com Gas Furnace_Com_Space Heat_Early Com Gas Furnace_Com_Space Heat_ROB Com Load Shedding_Com_DR_Retrofit Com VRF_Com_Space Heat_Early Com VRF_Com_Space Heat_ROB Commercial Roof Insulation_Com_Space Heat_Retrofit Commercial Wall Insulation_Com_Space Heat_Retrofit Commercial Windows_Com_Space Heat_Retrofit Gas Process Condensing Boiler_Com_Process_ROB Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Boiler baseline_Com_Space Heat_ROB Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_Early Ground Source Heat Pumps (Specific Location) Furnace baseline_Com_Space Heat_ROB HPWH_Com_Water Heat_ROB Measure Life (years) 20 20 20 20 20 20 20 1 16 16 20 20 20 20 20 20 20 20 15 Peak hour demand reduction per unit (mscfh) 0.2271 1.3156 1.3095 0.1991 0.2002 0.2065 0.2083 3.0868 1.3173 1.3094 0.2246 0.7471 0.7348 0.0000 1.5033 1.3558 1.5118 1.3620 0.0382 110 Peak day demand reduction per unit (mscfd) 4.104 23.701 23.698 3.605 3.605 3.740 3.741 55.598 23.700 23.697 4.160 13.588 13.233 0.000 27.186 24.298 27.187 24.300 1.039 Electric peak demand impact per unit Electric energy load Annual mscf reduction (winter kW) impact per unit (kWh) - NPA incentive strategy per unit increase/(decrease) increase/(decrease) cost per premise ($) 326.36 0.00 0 $347,084 1737.51 270.23 211171 $134,234 1737.51 270.26 211171 $54,974 264.28 0.00 0 $57,915 264.28 0.00 0 $25,740 274.21 0.00 0 $25,740 274.21 0.00 0 $25,740 3.09 0.00 0 $34,727 1737.51 108.07 211171 $527,520 1737.50 108.62 211170 $446,457 305.31 0.00 0 $52,554 995.28 0.00 0 $275,234 970.89 0.00 0 $235,393 0.00 0.00 0 $0 1966.23 121.48 145147 $1,541,516 1741.19 108.16 128534 $1,302,878 1966.23 121.93 145147 $1,541,517 1741.27 109.23 128539 $1,302,919 745.26 3.39 54972 $28,391
Text of CLF-011 Attachment 18.pdf
Extracted from the file · 22 pages · 55,502 characters
Text of CLF-011 Attachment 19.pdf
Extracted from the file · 18 pages · 27,716 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026