Interrogatory responses
Answers to questions 11
Files6
CLF-011 Attachment 14.pdf
PDF · 3.1 MB · 23 pagesText searchable
Download CLF-011 Attachment 14.pdfRead the text of CLF-011 Attachment 14.pdf
CLF-011 Attachment 15.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download CLF-011 Attachment 15.pdfRead the text of CLF-011 Attachment 15.pdf
CLF-011 Attachment 16.pdf
PDF · 4.6 MB · 20 pagesText searchable
Download CLF-011 Attachment 16.pdfRead the text of CLF-011 Attachment 16.pdf
CLF-011 Attachment 17.pdf
PDF · 4.3 MB · 142 pagesText searchable
Download CLF-011 Attachment 17.pdfRead the text of CLF-011 Attachment 17.pdf
CLF-011 Attachment 18.pdf
PDF · 2.1 MB · 22 pagesText searchable
Download CLF-011 Attachment 18.pdfRead the text of CLF-011 Attachment 18.pdf
CLF-011 Attachment 19.pdf
PDF · 1.9 MB · 18 pagesText searchable
Download CLF-011 Attachment 19.pdfRead the text of CLF-011 Attachment 19.pdf
Page 13 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 13 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 13 of 142 Factors that Impact Model Accuracy: • Updating the Model for System Changes (Map Posting Backlog) – This is defined as the period it takes to update the GIS system from actual in-service dates to being reflected into the system model. Examples of facilities included in the updates range from new customer loads to large capital improvements to the system. The Company currently evaluates the model and manually adds projects quickly that could materially impact the model to the system configuration. By completing this manual process, the model reflects the most current system configuration at any time it is run. This is a best practice and ensures accurate outcomes. They also complete an annual update cycle for modelling geospatial data that would incorporate system changes and additions not previously added manually. • Connectivity Once Imported – The modeling team does a continuity check while running baseline cases to ensure the system model is connected as the system is in the field. Connectivity is critical to ensure that the actual digital model matches the physical system. Model calibration confirms the configuration and was done extensively. As reviewers, the PA team did not have access to the model directly, but observed and studied the steps used to build and validate the model. Items such as update cycles, model inputs, and model connectivity that can impact model completeness were discussed and verified. Overall, the process observed for data model building appears to be complete and mature. 3.3.2 Model Development and Calibration The Mountain System is a complex system with inputs, loads and various system restraints. The unsteady state modeling approach simulates a three-day period of loading and the related flows and pressures. Below are some of the steps taken to complete the analysis process for the Mountain System. Please note this is a high-level summary of steps taken to complete the analysis process. Overall, this portion of the process was executed thoughtfully and thoroughly. • Once the geospatial and load data were completed in the model software, the model was run using the software processes. Various checks were made, any errors resolved, and the model was ready for running various scenarios. These processes took place prior to the PA team’s confirmation but were explored during joint workshops and the overall results confirmed via historical simulations and actual field pressure/volume data. • Model calibration was performed by matching the simulations to actual pressure/volume data recorded in the Company SCADA system. Loads were increased or decreased to match the actual conditions noted at a known design temperature. This could be done on the entire model, or specific areas depending on the outcomes. For the Mountain System model, this was done by the area, to ensure overall outcomes match real data. This becomes the baseline model or base case model. This data was verified and observed via curves showing SCADA data to model outcomes. The curves validated the model calibration was complete and within reasonable tolerances. • After the model is calibrated, the added growth is placed into the model. This is completed by adding load nodes in the areas where growth is expected to simulate future growth. And the model is run up to the full load profile (as detailed above). The Company performed these steps after determining the best growth approach based on study of growth data. Once all calibration and the baseline model are completed, the planning software then allows analysis to begin. 13Page 14 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 14 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 14 of 142 4 NPA DSM Solution Development The PA team was retained by the Company to complete an assessment of a variety of NPA measures and technologies to understand their potential to alleviate the capacity constraint in the Eastern Mountain Gas System. In the Colorado Public Utilities Commission’s (PUC) Rules Regulating Gas Utilities, an NPA is defined as “programs, equipment, or actions that avoid, reduce, or delay the need for investment in certain types of new gas infrastructure and may include EE, demand response (DR), and beneficial electrification”.3 As part of the Mountain Energy NPA Analysis, the PA team worked to complete the NPA potential study, described in this section, meant to inform an integral element of the Company’s planning process for supplying safe, clean, and reliable energy to the Eastern Mountain Gas System. To address the Eastern Mountain Gas System capacity constraint, the PA team developed NPA DSM solutions and estimated their potential for alleviating the constraint. The PA team conducted primary research in the Eastern Mountain Gas System to better understand specific characteristics of the region, assess barriers to NPA implementation, understand trade partners’ readiness to support electrification, understand customer’s interest in participating in potential Company programs, and assess interest at different incentive levels to inform the achievable potential for NPA measures. Figure 4-1 below shows the methodology for developing and evaluating a set of NPA measures and technologies that could be efficient in helping alleviate the current gas system capacity constraint in the Eastern Mountain Gas System. Figure 4-1: Approach to Estimating Potential The steps from the figure are further explained in this list: 1. Determine gas demand: The PA team assessed current and projected gas demand by customer class and end use, accounting for Design Day peak hour and peak day, informed by data provided by the Company.4 2. Identify potential NPA measures/technologies: The PA team developed a list of 70+ potential NPA measures and technologies to evaluate for effectiveness in the Eastern Mountain Gas System, shown in Table 4-7 and Table 4-8, later in this section. The potential measures include EE, DR, and electrification measure types. Additionally, the PA team determined the gas saving values and costs associated with each identified measure. The team consulted the Company’s most recent potential 3 Colorado Department of Regulatory Agencies, Public Utilities Commission, 4 Code of Colorado Regulations 723-4. 4 The team included a demolition rate of 1% per year for residential and 2% per year for commercial. The Company provided slightly lower demolition rates but the PA team assumed a higher demolition and rebuild rate in the mountain service territories. 14Page 15 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 15 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 15 of 142 study, the technical reference manual (TRM), scanned for national NPA measures, and accumulated stakeholder feedback to develop the initial measure list. 3. NPA measure qualitative screening process: Each NPA measure was processed through a series of screens to make it to the next step. a. Determine Design Day peak hour gas savings: The PA team assessed if the measure/technology had measurable impact to the peak hour gas demand. b. Relative peak hour/peak day gas demand impact: The PA team assessed the relative magnitude of peak hour/peak day gas demand impact from the NPA measure/technology on a scale of 1-5. A NPA measure/technology had to score higher than 1 to pass. c. Qualitative screen: The NPA measure/technology was scored form 1-5 on each of the following criteria: 1) commercial availability of measure; 2) customer acceptance of solution; 3) availability of contractors; 4) ease of implementation; and 5) GHG impacts. A weighted score was then determined. 4. Conduct interviews/surveys: The PA team established customer willingness to adopt NPA measures and technologies and determined the necessary incentive levels required to increase likelihood of customer adoption. 5. Quantitative Measure Characterization: For all measures passing the qualitative screen, the PA team developed a full set of quantitative inputs for estimating peak hour impacts and cost-effectiveness of each measure/technology in each geographic area under consideration. Where possible, savings, costs, and lifetimes were aligned with current Company DSM TRM assumptions. The team deviated from the TRM in three important ways. First, all measures in the study were defined at the premise level, rather than some other unit for ease of application. This is especially impactful in the commercial area, where building sizes vary tremendously. Second, for measures not included in the current Company DSM TRM, the PA team relied on secondary sources of estimates of savings from other jurisdictions. Third, for measures covering end uses with significantly different baseline premise-level consumption in the Eastern Mountain Gas System, the algorithms from the TRM were used, with usage variables updated to match premise-level usage in the Eastern Mountain Gas System, which accounts for differences in climate and building size between the TRM (generalized across Xcel territory) and the Eastern Mountain Gas System. Savings estimates were then calibrated to actual premise-level consumption and peak hour usage in each geographic area to calculate area-specific estimates of impacts. The peak hour estimates are based on the calibrated gas model from the Company, as mentioned earlier, and are based on gas planning design temperatures ranging from 42 to -33 degrees F, which are significantly lower than ASHRAE design temperatures used in the latest TRM. All of the impact estimates are effectively scaled to the average size premise within each area and building segment. Market adoption curves were developed based on current participation rates and expected market growth based on customer surveys and contractor interviews. Quantitative inputs included: a. Annual throughput savings (therms/year) b. Peak hour gas demand impacts (peak hour mscfh) c. Lifetime (years) d. Incremental Cost (dollars) e. Adoption curves f. Electricity throughput impacts (kWh) g. Electricity summer and winter peak demand impacts (kW) 6. Modeling of NPA measures/technologies: The PA team modeled 54 measures across each of the nine geographies. The PA team assessed the potential of each NPA measure/technology in three categories: a. Technical potential – the theoretical maximum amount of energy use that could be displaced, disregarding all non-engineering constraints such as cost effectiveness and the willingness of end users to adopt the EE measures. 15Page 16 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 16 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 16 of 142 b. Economic potential – subset of technical potential that is economically cost effective. c. Achievable potential – subset of economic potential that further limits potential by taking into consideration market of programmatic barriers or constraints such as program budget caps or implementation issues. 7. Calculate potential savings: the PA team used all the inputs from the process to determine the amount of technical, economic, and achievable potential gas reductions from EE, DR, firm to interruptible service, and electrification. 4.1 Building Type and End-Use Disaggregation The PA team used load disaggregation to calibrate all NPA measures/technologies impact assumptions using baseline estimates of annual throughput and peak day gas demand usage by building type and geography. First, the PA team disaggregated the annual throughput and peak hour impacts by building type and customer type for the entire mountain region (e.g. residential, commercial, commercial transport, and LDC), as shown in Figure 4-2 and Figure 4-3 below. The results show that single family residential makes up the largest portion of non-LDC, non-transport annual throughput and peak hour usage. As a result, single family residential solutions were identified as the most important building type to focus on in development of NPA DSM solutions, with master-metered multifamily and lodging the most important commercial areas for commercial solutions. Figure 4-2: Mountain System Throughput by Building Type and Customer Type Annual Throughput (ccf) 70,000,000 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0 Residential Commercial Transport Commercial 16 LDCPage 17 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 17 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 17 of 142 Figure 4-3: Mountain System Peak Hour Gas Consumption by Building Type and Customer Type By understanding the building type and end-use disaggregation, the PA team was able to identify that single family residential makes up the largest portion of non-LDC, non-transport annual throughput and peak hour usage. Practical NPA measures and technologies were informed by narrowing in on a specific customer class and end use. 4.2 End Use Disaggregation The PA team disaggregated monthly consumption (throughput) data from the Company into heating and nonheating by premise for all premises in the Mountain System. The heating and non-heating loads were then disaggregated further using a combination of results from the residential energy consumption survey (RECS)5, the commercial building energy consumption survey (CBECS)6, and their professional judgement, to apply estimated breakdowns of heating and non-heating by building type. Next, the PA team disaggregated the peak hour data from the Company. The PA team began this process by assessing the verified Design Day as-is gas model estimates of peak heating and non-heating. The PA team could then disaggregate peak heating and non-heating further using information from throughput disaggregation and assumed load shapes. As shown in Figure 4-4 below, space heating was found to be the largest end use for annual throughput, followed by water heating and commercial cooking. 5 Residential Energy Consumption Survey (RECS) - Energy Information Administration (eia.gov) Information Administration (EIA)- Commercial Buildings Energy Consumption Survey (CBECS) 6 Energy 17Page 18 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 18 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 18 of 142 Figure 4-4: Mountain System End Use Disaggregation of Annual Throughput 70,000,000 Annual Througput (ccf) 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0 Residential Commercial Multifamily Commercial Transport Multifamily Heating - Space Heating Annual Water Heating (ccf) Annual Cooking (ccf) Annual Other - Clothes Dryers (ccf) Heating - Snow Melting (ccf) Annual Other - Outdoor Fireplaces (ccf) Annual Other - Pool Heat (ccf) Annual Other - Process (ccf) Transport Table 4-1 below shows the annual throughput end use breakdown per premise for the Mountain System. Customers in the Mountain System have significantly higher usage than customers on the Front Range. Table 4-1: Mountain System Annual Consumption per Premise by Customer Type End Use Annual Consumption per Premise (ccf) Residential Commercial Multifamily Commercial Transport Multifamily Transport Heating – Space Heating 846 3,058 3,079 18,468 28,959 Annual Water Heating 274 1,608 456 10,066 7,048 Annual Cooking Annual Other - Clothes Dryers Heating - Snow Melting Annual Other - Outdoor Fireplaces Annual Other - Pool Heat 15 487 703 3,049 7,643 3 30 23 189 319 - 161 46 972 1,282 - 30 74 189 679 - 30 118 189 1,041 Annual Other - Process - - 266 - 2,531 Total 1,137 5,413 4,764 33,139 49,348 On peak days, the heating load spikes much higher, while all other loads stay the same. This results in space heating being, by far, the largest contributor to peak hour consumption, as shown in Figure 4-5. As a result, space heating became the focus of NPA DSM solution development efforts for inclusion in a portfolio focused on reducing peak hour gas consumption, with a particular focus on residential space heating. 18Page 19 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 19 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 19 of 142 Figure 4-5: Mountain System End Use Disaggregation of Peak Hour Consumption Peak Hour Consumption (mcfh) 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 0 Residential Commercial Multifamily Heating - Space Heating Commercial Peak Water Heating (mcfh) Transport Multifamily Peak Cooking (mcfh) Transport Peak Other - Total (mcfh) Table 4-2 below shows the peak hour gas end use breakdown per premise for the Mountain System. Table 4-2: Mountain System Peak Hour Gas Usage per Premise by Customer Type End Use Peak Hour Gas Usage per Premise (mscfh) Residential Commercial Multifamily Commercial Transport Multifamily Transport Peak Heating – Space Heating 0.061 0.220 0.203 1.334 1.849 Peak Water Heating 0.001 0.011 0.005 0.087 0.117 Peak Cooking 0.000 0.003 0.009 0.026 0.134 Peak Other - Clothes Dryers 0.000 0.000 0.000 0.002 0.006 Peak Heating - Snow Melting - 0.004 0.001 0.022 0.028 Peak Other - Outdoor Fireplaces - 0.000 0.001 0.002 0.009 Peak Other - Pool Heat - 0.000 0.001 0.002 0.014 Peak Other - Process - - 0.004 - 0.035 Total 0.062 0.239 0.223 1.474 2.192 19Page 20 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 20 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 20 of 142 4.3 Geographic Area Analysis Customers were segmented into different areas based on their relative location to the constrained area. This was done because each geographic area provides varying levels of per unit Design Day peak hour gas reductions for each constraint point. A map of the geographic areas of interest is displayed in Figure 4-6. Figure 4-6: Map of Modeled Target NPA Potential Geographic Areas 20Page 21 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 21 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 21 of 142 As displayed in the map above, Area 1 (light blue) consists of Marshall CS to Williams Fork CS, which includes the Grand Lake area. Grand Lake Area (dark blue) includes Granby and Grand Lake Top considers Grand Lake Only. Area 2 (green) is defined as Williams Fork CS to Frisco and includes the Breckenridge (yellow) and Keystone (purple) areas. Area 3 (red) is defined as Frisco to Leadville and Area 4 (orange) is defined as Leadville to Del Norte, plus the upper Gunnison Valley. Table 4-3 and Table 4-4 show the customer counts, annual energy consumption, peak day consumption, and peak hour consumption by geography for residential and commercial customers respectively. Data from these tables were used to inform an understanding of customer geographical spread, annual consumption by geography, and peak consumption by geography. Table 4-3: Residential Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 2,066 179,186 1,638 91 Area 1 – Other Grand Lake Area 3,048 300,904 2,949 164 Other Area 1 5,709 538,930 5,263 292 Area 2 Breckenridge 8,188 1,130,644 10,010 556 Area 2 - Keystone 4,526 501,849 4,755 264 Other Area 2 2,850 363,991 3,386 188 Area 3 3,447 348,255 3,088 172 Area 4 448 35,092 335 19 None 25,203 2,912,243 30,625 1,701 Total Mountain System 55,485 6,311,094 60,794 3,377 Geography 7 Table 4-4: Commercial non-Transport Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 136 34,501 244 14 Area 1 – Other Grand Lake 384 121,016 976 54 Other Area 1 590 268,915 2,369 132 Area 2 Breckenridge 911 418,027 3,225 179 Area 2 - Keystone 646 287,356 2,515 140 Other Area 2 36 24,736 219 12 Area 3 372 137,719 1,104 61 Area 4 72 24,569 217 12 Geography The “None” geography is defined as the area that has minimal impact on the system constraint, generally inclusive of the western Mountain System north and west of Meadow Mountain and southern Mountain System south of Del Norte. 7 21Page 22 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 22 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 22 of 142 Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) None 3,020 1,680,926 14,147 786 Total Mountain System 6,167 2,997,765 22,979 1,276 Table 4-5 shows the customer counts, annual energy consumption, peak day consumption, and peak hour consumption by geography for commercial transport customers. Results from this table were used to inform commercial transport customer dynamics and appropriate NPA measures and technologies. Table 4-5: Commercial Transport Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 7 12,552 96 5 Area 1 – Other Grand Lake 23 71,461 569 32 Other Area 1 64 235,315 1,950 108 Area 2 Breckenridge 184 804,165 6,358 353 Area 2 - Keystone 200 473,443 3,700 206 Other Area 2 58 260,966 2,783 155 Area 3 67 473,108 3,805 211 Area 4 0 0 0 0 None 327 1,752,614 13,401 745 Total Mountain System 930 4,083,624 28,498 1,583 Geography The PA team used data from the Company for the residential and commercial customer count and load growth in the region over the timeline of the study (through winter of 2033-34). For commercial, it was forecast that the number of new construction buildings was equal to the demolition rate. For residential, the total number of buildings assumption increases by roughly 1% per year, as seen in Figure 4-7. 22
Text of CLF-011 Attachment 18.pdf
Extracted from the file · 22 pages · 55,502 characters
Text of CLF-011 Attachment 19.pdf
Extracted from the file · 18 pages · 27,716 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026