Interrogatory responses
Answers to questions 11
Files6
CLF-011 Attachment 14.pdf
PDF · 3.1 MB · 23 pagesText searchable
Download CLF-011 Attachment 14.pdfRead the text of CLF-011 Attachment 14.pdf
CLF-011 Attachment 15.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download CLF-011 Attachment 15.pdfRead the text of CLF-011 Attachment 15.pdf
CLF-011 Attachment 16.pdf
PDF · 4.6 MB · 20 pagesText searchable
Download CLF-011 Attachment 16.pdfRead the text of CLF-011 Attachment 16.pdf
CLF-011 Attachment 17.pdf
PDF · 4.3 MB · 142 pagesText searchable
Download CLF-011 Attachment 17.pdfRead the text of CLF-011 Attachment 17.pdf
CLF-011 Attachment 18.pdf
PDF · 2.1 MB · 22 pagesText searchable
Download CLF-011 Attachment 18.pdfRead the text of CLF-011 Attachment 18.pdf
CLF-011 Attachment 19.pdf
PDF · 1.9 MB · 18 pagesText searchable
Download CLF-011 Attachment 19.pdfRead the text of CLF-011 Attachment 19.pdf
Page 21 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 21 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 21 of 142 As displayed in the map above, Area 1 (light blue) consists of Marshall CS to Williams Fork CS, which includes the Grand Lake area. Grand Lake Area (dark blue) includes Granby and Grand Lake Top considers Grand Lake Only. Area 2 (green) is defined as Williams Fork CS to Frisco and includes the Breckenridge (yellow) and Keystone (purple) areas. Area 3 (red) is defined as Frisco to Leadville and Area 4 (orange) is defined as Leadville to Del Norte, plus the upper Gunnison Valley. Table 4-3 and Table 4-4 show the customer counts, annual energy consumption, peak day consumption, and peak hour consumption by geography for residential and commercial customers respectively. Data from these tables were used to inform an understanding of customer geographical spread, annual consumption by geography, and peak consumption by geography. Table 4-3: Residential Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 2,066 179,186 1,638 91 Area 1 – Other Grand Lake Area 3,048 300,904 2,949 164 Other Area 1 5,709 538,930 5,263 292 Area 2 Breckenridge 8,188 1,130,644 10,010 556 Area 2 - Keystone 4,526 501,849 4,755 264 Other Area 2 2,850 363,991 3,386 188 Area 3 3,447 348,255 3,088 172 Area 4 448 35,092 335 19 None 25,203 2,912,243 30,625 1,701 Total Mountain System 55,485 6,311,094 60,794 3,377 Geography 7 Table 4-4: Commercial non-Transport Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 136 34,501 244 14 Area 1 – Other Grand Lake 384 121,016 976 54 Other Area 1 590 268,915 2,369 132 Area 2 Breckenridge 911 418,027 3,225 179 Area 2 - Keystone 646 287,356 2,515 140 Other Area 2 36 24,736 219 12 Area 3 372 137,719 1,104 61 Area 4 72 24,569 217 12 Geography The “None” geography is defined as the area that has minimal impact on the system constraint, generally inclusive of the western Mountain System north and west of Meadow Mountain and southern Mountain System south of Del Norte. 7 21Page 22 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 22 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 22 of 142 Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) None 3,020 1,680,926 14,147 786 Total Mountain System 6,167 2,997,765 22,979 1,276 Table 4-5 shows the customer counts, annual energy consumption, peak day consumption, and peak hour consumption by geography for commercial transport customers. Results from this table were used to inform commercial transport customer dynamics and appropriate NPA measures and technologies. Table 4-5: Commercial Transport Customer Counts and Usage by Geography Customer Count Annual Energy Consumption (mcf) Peak Day Consumption (mcfd) Peak Hour Consumption (mscfh) Area 1 - Grand Lake Top Portion 7 12,552 96 5 Area 1 – Other Grand Lake 23 71,461 569 32 Other Area 1 64 235,315 1,950 108 Area 2 Breckenridge 184 804,165 6,358 353 Area 2 - Keystone 200 473,443 3,700 206 Other Area 2 58 260,966 2,783 155 Area 3 67 473,108 3,805 211 Area 4 0 0 0 0 None 327 1,752,614 13,401 745 Total Mountain System 930 4,083,624 28,498 1,583 Geography The PA team used data from the Company for the residential and commercial customer count and load growth in the region over the timeline of the study (through winter of 2033-34). For commercial, it was forecast that the number of new construction buildings was equal to the demolition rate. For residential, the total number of buildings assumption increases by roughly 1% per year, as seen in Figure 4-7. 22Page 23 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 23 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 23 of 142 Figure 4-74: Residential and Commercial Building Stock Count 70,000 Building Stock 60,000 50,000 40,000 30,000 20,000 10,000 0 Year Residential Stock Comercial Stock Results from this figure were used to inform residential and commercial demand and end-use through the 10year forecasted capacity constraint timeline. In general, a customer that is closer on the pipeline distribution network to a constraint point delivers a higher fraction of premise peak gas savings to that constraint point. The Company’s gas modeling team used Synergi gas hydraulic modeling software to model the average impact of customer demand reduction in each of the nine geographies for each of the three constraint points, which allows more precise impacts of measures installed in different areas to be calculated for each of the different constraint points. The areas modeled and the constraint points are shown in Figure 4-6 above. With the geographic areas of interest informing the PA team’s analysis, Table 4-6 shows the impact of peak hour reduction for all geographies at each constraint point. Area 2, including Breckenridge, Keystone, and other parts of Area 2, delivers the highest fraction of peak hour reductions to Breckenridge and Keystone. The immediate area around Grand Lake (“Grand Lake Top”) is the only area that can deliver peak hour reductions to the Grand Lake constraint. Table 4-6: Ratio of Peak Hour Reduction to Capacity Delivered Geography RB-4 (Breckenridge) RX-7 (Keystone) RG-12 (Upper Grand Lake) Other Area 1 0.37 0.14 0.00 Area 1 – Other Grand Lake 0.49 0.18 0.00 Area 1 - Grand Lake Top 0.42 0.16 0.65 Other Area 2 0.65 0.27 0.00 Area 2 - Breckenridge 0.98 0.05 0.00 Area 2 - Keystone 0.46 0.74 0.00 Area 3 0.75 0.24 0.00 Area 4 0.31 0.10 0.00 None 0.00 0.00 0.00 4.4 Measure Characterization The PA team started measure development by compiling a list of current gas DSM measures included in the DSM technical resource manual and then conducted a national review of available measures and technologies to consider for inclusion in the portfolio. The initial list was provided to stakeholders for comment and 23Page 24 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 24 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 24 of 142 stakeholders provided additional measures to add to the initial measure list for screening. The PA team then performed a qualitative and quantitative screen of NPA measures and technologies. This screening was intended to streamline the overall analysis by excluding measures expected to have minimal impact on potential. Qualitative Measure Characterization NPA measure qualitative screening process: each measure was processed through a series of screens to make it to the next step. 1. Determine Design Day peak hour gas savings: the PA team assessed if the measure/technology had measurable impact to the peak hour gas demand. 2. Relative peak hour/peak day gas demand impact: the PA team assessed the relative magnitude of peak hour/peak day gas demand impact from the NPA measure/technology on a scale of 1-5. A NPA measure/technology had to score higher than 1 to pass. 3. Qualitative screen: the NPA measure/technology was scored form 1-5 on each of the following criteria: 1) commercial availability of measure; 2) customer acceptance of solution; 3) availability of contractors; 4) ease of implementation; and 5) GHG impacts. A weighted score was then determined. Excluded measures will not necessarily be eliminated from consideration for future program offerings, but they are not included in quantitative estimates of potential. Table 4-7 and Table 4-8 show residential and commercial (including transport) qualitative screening results, including measures that passed screening (included measures) and those that failed screening (excluded measures). Each excluded measure has a reason for exclusion listed. Table 4-7: Residential Qualitative Measure Screening Results Measure Type Measure Inclusion Status/ Reason for Exclusion DR Behavioral Messaging DR Included DR Thermostat DR/DLC Included Behavior Home Energy Reports Included EE Windows Included EE Infiltration Reduction Included EE Insulation Included Low Flow Faucet Aerator Excluded / Minimal Peak Hour Savings Low Flow Showerheads Excluded / Minimal Peak Hour Savings Gas Equipment Gas Furnace Replacement Included Gas Equipment High Efficiency Boiler Replacement Included Gas Equipment Efficient Storage and Tankless Water Heaters Included Gas Equipment Gas Furnace Tune-Up Included EE Building Codes Excluded / Out of Program Scope EE Energy Star Home/Efficient Home Included BE Heat Pump Water Heater Included EE EE 24Page 25 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 25 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 25 of 142 Measure Type Measure Inclusion Status/ Reason for Exclusion BE Heat Pump Full Electrification Included BE Ground Source Heat Pumps (Specific Location) Included BE All Electric New Construction Included BE Dual Fuel Heat Pump Excluded / Minimal Peak Hour Savings DR Tech Agnostic, Whole Home DR Measured at Meter Excluded / Low Market Availability DR DHW DLC Excluded / Low Market Availability DR HVAC DLC - switch Excluded / Low Market Availability Gas Equipment High Efficiency Fireplaces Excluded / Low Market Availability Water Heater Tank Insulation Excluded / Minimal Peak Hour Savings Water Heater Pipe Insulation Excluded / Minimal Peak Hour Savings Integrated Controls for MSHPs Excluded / Minimal Peak Hour Savings Ranges Excluded / Minimal Peak Hour Savings Electric Resistance Water Heater Excluded / Minimal Peak Hour Savings BE Furnace/Boiler Supplements (i.e. Pellet Stoves) Excluded / Low Market Acceptance Gas Equipment Pool Heaters Excluded / Minimal Applicability EE Snowmelt Excluded / Minimal Applicability Clothes Dryers Excluded / Minimal Peak Hour Savings Ground Source Heat Pumps (Snow Melt) Excluded / Minimal Applicability Smart Thermostat Excluded / Negative Peak Hour Savings Gas Equipment EE BE Gas Equipment BE Gas Equipment BE EE Table 4-8: Commercial and Industrial Qualitative Measure Screening Results Measure Type Measure Inclusion Status/ Reason for Exclusion DR Tech Agnostic, Whole Facility DR Measured at Meter Included BE All Electric New Construction Included EE Infiltration Reduction Included EE Windows Included EE Insulation Included 25Page 26 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 26 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 26 of 142 Measure Type Measure Inclusion Status/ Reason for Exclusion Gas Equipment Gas Condensing Boiler Included Gas Equipment Gas Storage and Tankless Water Heater Included Guest Room Energy Management Excluded / Minimal Peak Hour Savings Gas Equipment Gas Furnace - High Efficiency Included EE Energy Efficient New Construction Included Gas Equipment Condensing Boiler - Process Included BE Cooking Electrification Included BE Ground Source Heat Pumps (Specific Location) Included BE VRF Heat pumps (large or boiler/chiller) Included BE Heat pump water heaters Included BE ASHP replace Rooftop (baseline rooftop) Included BE Snowmelt Electrification Excluded / Low Market Availability DR Snowmelt DR Included in Whole Facility DR EE Building Codes Excluded / Out of Program Scope DR Thermostat DR/DLC Included in Whole Facility DR DR Forced Whole Facility DLC w/incentives Excluded / Low Market Acceptance BE Fuel Switching for Dual Fuel Customers Excluded / Minimal Applicability Combination Ovens Excluded / Minimal Peak Hour Impacts Pre-Rinse Spray Valves Excluded / Minimal Peak Hour Impacts Demand Control Ventilation Excluded / Minimal Peak Hour Impacts HVAC Heat Recovery/ Energy Recovery Ventilator Excluded / Low Impacts Snowmelt EE Excluded / Minimal Peak Hour Impacts Hot Water Boiler Tune-Up Excluded / Low Impacts High Efficiency Ovens & Dryers Excluded / Minimal Peak Hour Impacts Steam Trap Replacement Excluded / Minimal Applicability Dual Fuel Heat Pumps (gas backup) Excluded / Minimal Peak Hour Impacts Commercial Boiler - Solar Hot Water Excluded / Minimal Peak Hour Impacts Ground Source Heat Pumps (Snow Melt) Excluded / Low Impacts EE Gas Equipment EE EE EE EE Gas Equipment Gas Equipment EE BE BE BE 26Page 27 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 27 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 27 of 142 Measure Type Measure Inclusion Status/ Reason for Exclusion EE C&I Process Excluded / Minimal Applicability DR Outdoor fireplace DR Included in Whole Facility DR BE Ground Source Network Loop Excluded / Low Market Availability Quantitative Measure Characterization The measures that passed qualitative screening then received further quantitative measure characterization, including all inputs necessary to estimate cost-effectiveness and peak hour impacts. Savings were estimated using TRM where available, calibrated to actual consumption and peak data for the mountain region. Residential and commercial (including transport) measures and their key measure characteristics are shown in Appendix 6. While the actual analysis used geography and building group, the savings values in these tables reflect the weighted average values across all geographies and building types, assuming the weights from the achievable potential. Table 4-9 below shows the residential savings adjustment multipliers by geographic area and building type. These multipliers represent the ratio in consumption and savings between the building type and geographic area combination and the base assumptions based on the TRM with peak hour factors applied. They were derived using the premise-level disaggregated end-use peak usage by geographic area and building type. These multipliers reflect differences in weather and building size and characteristics that drive differences in per premise consumption across the population. The savings adjustments are multiplied by the generic savings to estimate geography and building type-specific results. Table 4-9: Residential Measure Savings Adjustments by Geographic Area and Building Type Geographic Area Building Type Heating Non-Heating 1 - Breck SF 1.21 1.40 1 - Breck MF 0.92 1.06 2 - None SF 1.04 1.09 2 - None MF 0.79 0.83 3 - Area3 SF 0.91 0.94 3 - Area3 MF 0.69 0.72 4 - Area4 SF 0.70 0.74 4 - Area4 MF 0.53 0.56 5 - Keystone SF 0.99 1.05 5 - Keystone MF 0.76 0.80 6 – Upper Grand Lake SF 0.82 0.67 6 – Upper Grand Lake MF 0.63 0.51 7 – Grand Lake SF 0.93 0.79 7 – Grand Lake MF 0.71 0.60 8 - OtherArea1 SF 0.89 0.76 8 - OtherArea1 MF 0.68 0.58 9 - OtherArea2 SF 1.13 1.24 9 - OtherArea2 MF 0.86 0.94 27Page 28 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 28 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 28 of 142 Table 4-10 below shows the commercial measure adjustment multipliers (including transport). Table 4-10. Commercial and Transport Measure Adjustment Multipliers Geographic Area Building Type Heating Non-Heating 1 - Breck Commercial 0.98 1.01 1 - Breck Multifamily Commercial 1.09 1.34 1 - Breck Multifamily Transport 10.07 9.17 1 - Breck Transport 9.08 10.93 2 - None Commercial 1.32 1.11 2 - None Multifamily Commercial 1.37 1.66 2 - None Multifamily Transport 7.76 8.30 2 - None Transport 14.17 14.41 3 - Area3 Commercial 0.91 0.66 3 - Area3 Multifamily Commercial 1.13 0.89 3 - Area3 Multifamily Transport 6.35 11.51 3 - Area3 Transport 20.74 15.84 4 - Area4 Commercial 0.85 0.53 4 - Area4 Multifamily Commercial 4.18 3.97 4 - Area4 Multifamily Transport NA NA 4 - Area4 Transport NA NA 5 - Keystone Commercial 0.98 1.00 5 - Keystone Multifamily Commercial 0.96 1.31 5 - Keystone Multifamily Transport 3.51 5.46 5 - Keystone Transport 4.88 6.88 6 – Upper Grand Lake Commercial 0.70 0.37 6 – Upper Grand Lake Multifamily Commercial 0.70 0.34 6 – Upper Grand Lake Multifamily Transport NA NA 6 – Upper Grand Lake Transport 2.43 6.84 7 – Grand Lake Commercial 0.79 0.65 7 – Grand Lake Multifamily Commercial 0.63 0.64 7 – Grand Lake Multifamily Transport 5.80 13.52 7 – Grand Lake Transport 6.27 4.16 8 - OtherArea1 Commercial 1.06 0.94 8 - OtherArea1 Multifamily Commercial 1.11 1.05 28Page 29 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 29 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 29 of 142 Geographic Area Building Type Heating Non-Heating 8 - OtherArea1 Multifamily Transport 8.62 13.24 8 - OtherArea1 Transport 7.50 7.79 9 - OtherArea2 Commercial 1.73 0.93 9 - OtherArea2 Multifamily Commercial 1.70 1.73 9 - OtherArea2 Multifamily Transport 2.86 5.12 9 - OtherArea2 Transport 17.23 25.62 4.5 Primary Research To inform the NPA Potential Study, the PA team conducted primary research to assess customer characteristics and interest in energy efficient and electrification upgrades along with trade partner knowledge and interest in promoting and installing electrification equipment. The PA team used the information from these surveys and interviews to inform estimates and ramp up time for market adoption, the level of incentives needed to achieve the NPA goals, and the amount of workforce development needed to support any program. The PA team conducted primary research among three groups of interviewees, with the respective survey and interview topics as follows: • • • Residential Customer Survey - Gas equipment saturation - Demographic information - Willingness to participate in gas equipment or building shell efficiency upgrades, conversions of gas equipment to electricity, and load management programs Contractor / Builder Interviews - Experience and awareness of the Company’s programs - Experience in recommending or installing heat pumps - Need for additional training - Recommendations for marketing Commercial Customer Survey - Gas equipment saturation - Building characteristics - Willingness to participate in converting gas equipment to electricity, shell upgrades and load management programs 4.5.1 Residential Customer Survey The PA team conducted a survey of a random sample of the Company’s residential gas customers in the affected mountain areas, intended to capture customer demographics in the Eastern Mountain Gas System. For comparison purposes, a sample of customers located on the front range of the Company’s service territory. The PA team offered the survey in both English and Spanish, recruited customers over email, and offered a $10 gift card incentive for completing the survey. Response rates and survey confidence and precision for front range and mountain areas are shown in Table 4-11. The survey questionnaire is attached in Appendix 6.2. 29Page 30 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 30 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 30 of 142 Table 4-11: Residential Survey Response Rates Area Customers Surveyed Completed Surveys Response Rate Spanish Respondents Confidence and precision Front Range 4,600 295 6.4% 9 90% +/- 4.7% Mountain 4,599 400 8.5% 9 90% +/- 4% 4.5.2 Residential Customer Survey Results Since customers that own their own homes are more likely to invest in upgrades than renters, the survey first asked about home ownership. For those customers responding to the survey, home ownership rates are higher in the mountain areas than on the front range (Figure 4-8) which improves the opportunity to participate. Figure 4-8: Home Ownership Rates 100% Percentage of Respondents 89% 80% 77% 60% 40% 23% 20% 10% 0% 1% 0% Own Rent Front Range (n=281) Other Mountain (n=384) For customers identifying as renters, the PA team asked whether the respondents would have the ability to influence equipment decisions in the homes they reside, and used this information to screen out those survey respondents that would be unable to answer later program interest questions. As shown in Figure 4-9, the level of influence was spread across the four choices; only those indicating some or a lot of influence received later survey questions about program interest. Renter respondents that self-report as influential were included in our assessments for the NPA potential. 30
Text of CLF-011 Attachment 18.pdf
Extracted from the file · 22 pages · 55,502 characters
Text of CLF-011 Attachment 19.pdf
Extracted from the file · 18 pages · 27,716 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026