Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

  1. Page 61 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 61 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 61 of 142 4.5.5 Contractor/Builder Interviews The PA team conducted qualitative interviews with a sample of the Company’s mountain region program trade partners. The goal of the research efforts was to understand the current familiarity and experience with heat pumps, challenges they see, and assess the number of incentives, marketing and training that would be required to implement a successful electrification program. We screened the Company’s database for contractors that work in heating, ventilating and air conditioning systems along with builders that work in the mountain areas. We received responses as shown in Table 4-17. We conducted the interviews using by experienced energy research staff via telephone and offered $50 gift card incentives for a completed interview. A copy of the interview guides are included in Appendix 6.4. Table 4-17: Sample Disposition and Characteristics Category Builders (N) Commercial Contractors Residential Contractors Qualified Sample 19 16 18 Non-eligible (contact error) 4 0 1 Refused 3 1 0 Complete 3 4 3 Response Rate 20% 25% 18% 4.5.6 Contractor/Builder Interviews Results For builders, the PA team asked questions around familiarity with electric technologies for heating and water heating, the challenges in building all-electric homes, role of incentives, and the role of marketing. For contractors, we asked questions to understand the contractor’s current knowledge and engagement with heat pumps, identify shared traits among customers that decide to use electric equipment, understand the customer decision and contractors influence in adoption of new technologies, and identify incentive needs and opportunities if the Company were to pursue a program to convert gas equipment to electricity. Familiarity and Experience All builders and contractors indicated they were familiar with heat pumps. Only 4 of 10 have installed heat pumps for heating in at least one application, while 6 of 10 have installed heat pump water heaters in at least one application. Buildings and Contractors had mixed experience with the technologies: • 1/10, a residential contractor is a proponent of heat pumps for heating but not water heating, 2 residential contractors had a bad experience and refuse to work with them now • 2/3 Residential builders believe there are no heat pump alternatives to boilers • 6/10 Concern it won’t work at low temps, fear of customer complaints, maintenance, and longevity unknowns. • 6/10 Concerned about skilled workforce and lack of knowledgeable and capable installers • 6/10 state that customers want gas, decision already made, or customer needs to replace like for like • 6/10 believe installation is more expensive due to involvement of additional trades (electrical + plumbing, maybe drywall for retrofits) • 3/10 believe water heaters are too noisy and may pump unwanted cold air into space 61
  2. Page 62 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 62 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 62 of 142 Customer Interest Contractors and builders report having seen customer interest increase over the past three years (7/10). One commercial contractor indicated they had only seen interest in water heaters, and one residential contractor said they had only had interest in new construction, but not retrofit. When asked when they would recommend heat pumps to customers the following responses were provided: • 3/10 If cost effective - new construction or retrofit with an existing ducted system and have a backup electric baseboard or backup wood stove, dual fuel natural gas furnace with a coil can also be a heat pump. One stated “simpler systems” such as where a customer wants to cool one room. • 5/10 “If customers asked, I would consider / become educated.” • 1/10 Never at high altitude • 1/10 Never when converting existing gas systems due to higher installation and operating costs • 1/10 Noted life expectancy of a heat pump is longer than natural gas system Ease of Selling The three builders were asked about customer interest in going electric by end-use. Figure 4-64 shows the response of each builder. The most favorable opportunity was space heating, while cooling and fireplaces were least favorable. Figure 4-64: Perception of Builders – Ease of Selling Electric Homes by End-Use 5 5 5 5 4 4 4 3 3 2 2 2 2 1 1 1 Cooking Fireplaces 1 0 Spae SpaceHeat Heat Water Heat Custom Builder 1 Custom Builder 2 Employee Housing Builder Current New Construction Practices The three builders also reported how often they install different types of gas end-uses. As shown in Figure 4-65, the two custom gas builders most often install multiple gas end-uses beyond heating and water heating. 62
  3. Page 63 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 63 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 63 of 142 Figure 4-65: Builder Experience – Typical Gas End-Uses Installed 100% 100% 100% 80% 100% 100% 100% 70% 60% 60% 40% 40% 20% 0% 0% 5% 0% 0% 2% 0% 0% Fireplaces Stoves Custom Builder 1 Fire Pits Custom Builder 2 Hot Tubs Snow Melt Employee Housing Builder Incremental Costs Builders and Contractors all perceive an increased cost to go electric over gas. The responding builders noted that the installation requires both an electrician and a plumber, but doesn’t involve drywall, which is likely required for a retrofit. A couple of respondents also reported specifics: • • One contractor said a 5,000 square foot home would require $16,000 to $20,000 to install a gas boiler, and $24,000 for a heat pump system. Another contractor said a boiler is $10,000 to $15,000 and a heat pump would be $15,000 to $20,000 Two contractors gas estimates for differences in water heater to heat pump water heater costs, one offered an estimate of $600 and the other was $5,000. Role of Incentives The contractors and builders were asked whether they are aware and if they believe customers are aware of the existing and upcoming federal incentives for heat pumps along with any state or local incentives. • • • One commercial and 3 residential contractors are aware of local and upcoming federal incentives for heat pump technology. Six of 10 were confident in their knowledge and reported they look up specifics when requested by clients. Builders believe about half of their clients are aware of incentives. One residential contractor believes customers are aware of local and federal incentives for heat pumps, but the remainder were unsure. When asked what types of incentives contractors and builders thought it would take to encourage customers to convert to heat pumps, 6 responded as follows: • 3/6 believe 100% incentive • 1/6 believe 75% incentive • 2/6 believe 50% incentive Most Likely to Participate We asked contractors and builders what types of customers would be most likely to participate in a program to convert to heat pumps. Responses were as follows: 63
  4. Page 64 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 64 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 64 of 142 • 5/10 those with existing climate concerns and a desire to lower emissions • 3/10 Sophisticated and educated regarding the technology • 2/10 Interested in lowering their energy bill over time • • 3/10 Wealthy, 40’s with kids, new construction Those interested in reducing climate impacts (ski resorts, box stores), employee housing, or those with local government requirements New construction Least likely: convenience stores and food service. • • Trade Partner Needs We asked contractors and builders about what they need to be “ready” to promote electrification to their customers. The key themes we heard through the interviews were that they would need more trust in the technology, have the incentives and process to receive them be simple, and be provided marketing templates to assist them in marketing the technology. Trade partners felt that having distributors and manufacturers and architects driving education and technology applications would improve their trust. They also mentioned needing assistance in recruiting and training a workforce skilled with heat pumps or other new technologies. The partners indicated that a fixed rebate amount is simple and prefer those over rebates that require detailed calculations to determine the amount. The trade partners were flexible on whether the rebate is paid to a supplier or installer or end user. Around marketing some contractors requested ideas for print, web, and radio advertising and would appreciate direct marketing from the Company through emails and bills as well through other advocacy groups such as High Country conservation. Conclusions Builders and contractors reported low familiarity and low trust of heat pumps. They are concerned about the opportunity to completely displace gas heating due to high altitudes and cold mountain temperatures. Respondents believe that both upfront costs and operating costs are higher with heat pumps because installations are more complicated and require more types of trades (electrician, plumbers, and drywallers). The interviews indicated that significant training and preparation of market structure will be needed as manufacturers, distributors, and architects will need to lead the contractors and builders to choose new electrification technologies. 4.6 Estimating DSM Potential Using the measure-level savings estimates and inputs from the customer and contractor research, the PA team assessed the potential of each NPA measure/technology in three categories: • Technical potential – the theoretical maximum amount of energy use that could be displaced, disregarding all non-engineering constraints such as cost effectiveness and the willingness of end users to adopt the EE measures. • Economic potential – subset of technical potential that is economically cost effective. • Achievable potential – subset of economic potential that further limits potential by taking into consideration market of programmatic barriers or constraints such as program budget caps or implementation issues. The DSM potential estimates were created for the entirety of the Mountain System, allowing for implementation plans to treat more or less of the Mountain System, depending on the results and costeffectiveness of measures implemented in specific geographic areas. 64
  5. Page 65 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 65 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 65 of 142 4.6.1 Technical Potential The technical potential describes the maximum demand reduction that is possible at each constraint point. Technical potential does not factor in economic constraints, customer preference, or market ability to deliver a technology and thus should not be used in setting policy. The technical potential shown in this section does not include technical potential for LDC customers but does include transport customers. To estimate the demand reduction that can be achieved at a pipeline constraint point there are two important factors to consider; 1) How much reduction in peak demand is achieved at the point of the customer, and 2) how much reduction is achieved at the point of constraint. Accounting for the reduction based on geography, the team assessed the technical potential that could be delivered at each constraint point. Table 4-18 shows the top ten measures for technical potential. The measure level technical potential below is shown before competition of measures. I.e., the technical potential shown below is for each measure in isolation. The top ten measures with the highest technical potential were all either heating system upgrades or building envelope efficiency measures. Table 4-18: Top Ten Technical Potential Measures in 2033 Sector Measure Name RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Residential Ground Source Heat Pump 1,123.0 390.5 57.2 Residential Boiler Electrification with ccASHP 556.9 193.7 28.4 Residential Furnace Electrification with ccASHP 556.6 193.6 28.4 Commercial ASHP 335.7 115.0 3.8 Commercial Ground Source Heat Pumps 223.8 76.7 2.5 Commercial VRF 208.0 71.3 2.4 Residential Gas Furnace Replacement 128.6 44.7 6.6 Residential Air Sealing 112.6 39.1 5.7 Commercial Commercial Wall Insulation 111.2 38.1 1.3 Commercial Commercial Windows 108.5 37.2 1.2 Table 4-19 and Table 4-20 show the technical potential for each measure category and in total for residential and commercial, respectively. A single inefficient piece of equipment may have multiple efficient technologies that could replace that equipment. For example, a residential furnace could either be replaced by an all-electric air-source heat pump, or by a more efficient gas furnace. To calculate total technical potential, the efficient measure with the highest gas savings is used to estimate potential (in the prior example, that would be the air-source heat pump since it displaces all gas usage). A competition group is the concept of selecting a single efficient measure from a group of possible measures that will replace an inefficient measure. Total technical potential for the residential and commercial sectors is shown after competition. Note that the gas equipment has a technical potential of 0.0. This is because the equipment could technically be electrified, which saves more gas than a gas equipment replacement. An additional caveat is that the total technical potential does not consider interactive effects between shell measures and electrification. 65
  6. Page 66 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 66 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 66 of 142 Table 4-19: Residential Technical Potential by Measure Category After Competition in 2033 Measure Category Electrification RB-4 (Breckenridge) (mscfh) 1,149.6 RX-7 (Keystone) (mscfh) 399.8 RG-12 (Upper Grand Lake) (mscfh) 58.7 Building Shell 267.8 93.1 13.6 DR 38..2 13.1 2.1 Behavior 5.7 2.0 0.3 Whole Building 4.5 1.6 0.2 Water Saving 0.3 0.1 0.0 Gas Equipment 0.0 0.0 0.0 Gas Equipment Tune Up 0.0 0.0 0.0 Thermostat Retrofit 0.0 0.0 0.0 Total 1,466.0 509.6 74.9 Table 4-20: Commercial Technical Potential by Measure Category After Competition in 2033 Measure Category Electrification RB-4 (Breckenridge) (mscfh) 552.8 RX-7 (Keystone) (mscfh) 189.7 RG-12 (Upper Grand Lake) (mscfh) 6.3 Building Shell 277.1 94.9 3.1 DR 23.2 7.6 0.3 Gas Equipment 0.0 0.0 0.0 Total 853.0 292.2 9.8 Technical potential is slightly higher than the total peak hour consumption in the NPA region because the technical potential is shown for 2033, where estimates on consumption are derived from customer data from 2022. Additionally, a customer cannot achieve peak gas savings from installation of electrification, DR, and shell measures simultaneously. 4.6.2 Economic Supply Curves To evaluate the economic viability of measures, the PA team estimated cost-effectiveness and modeled overall potential at each constraint point for each geography for each measure. The team chose to evaluate cost effectiveness using a modified Residential Impact Test (RIM) test, “ERIM”, that included the economic value of carbon reduction in addition to the standard elements in a RIM test.9 These results were stacked to make a supply curve. The supply curve for the Breckenridge constraint is shown in Figure 4-66. The other areas have almost the exact same supply curve, so only one is presented here. 9 The standard ratepayer impact measure (RIM) evaluates the impact of intervention on utility rates. It includes avoided costs for both the gas and electric system, program overhead, incentives, and lost revenue. 66
  7. Page 67 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 67 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 67 of 142 Figure 4-66: Breckenridge Economic Supply Curve Using Expanded Ratepayer Impact Measure Test (ERIM) 300,000 200,000 High cost measures screened out (<2 mscfh total) ERIM Net Cost ($/mscfh-year) 100,000 High impact measures included (~130 mscfh total) 0 0 20 40 60 80 100 120 140 Low impact, negative cost measures included (<2 mscfh total) -100,000 For the purposes of this potential study, the measures were split into 3 groups, those with extremely high costs (ERIM or incentives higher than $100,000/mscfh-year), those with low to medium costs, and those with negative ERIM costs. The high-cost measures removed from further consideration in the analysis consist of non-heating measures with high costs and make up less than 2% of total achievable potential. The negative cost measures consist of non-heating measures with low costs. They are cost-effective because of their energy and GHG benefits, while delivering almost no gas peak hour benefits. These negative cost measures were included in achievable potential, but also make up less than 2% of total achievable potential. The remaining measures, which make up almost the entire achievable potential, have positive costs below $100,000/mscfh-year. Figure 4-67 shows the same economic supply curve, but only for the high impact portion of the curve, with the measures labeled. This shows the large variability in ERIM net costs across the different measures, with residential envelope, gas equipment, and DR all having large potential at cost of thousands of dollars per mscfh-year, while electrification measures have large potential at costs of tens of thousands of dollars per mscfh-year. The higher costs of electrification measures are driven primarily by the high costs of additional electrical capacity required to serve these new loads. 67
  8. Page 68 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 68 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 68 of 142 Figure 4-67: Breckenridge Economic Supply Curve Showing High Impact Measures 100 Com Non-Heating Equipment Com GSHP 50 ERIM Net Cost ($1000/mscfh-year) Res GSHP Com Heating Equipment Home Energy Report Res Low Cost Envelope Com Envelope Res All Electric NC Res Res Tstat DR Res Furnace/ Boiler ROB Com DR Medium Cost Envelope Res NC Res ccASHP Com ASHP+VRF Res Behavioral DR Res Furnace/Boiler ER 0 0 20 40 60 80 100 Peak Hour Savings (mscfh) 120 140 160 4.6.3 Achievable Potential Achievable potential represents the amount of peak hour demand reduction that could be achieved given limitations on customer acceptance and technology diffusion. Achievable potential is calculated by year, reflecting the expected rate of market adoption of different measures and available stock of opportunities each year. Results are generally presented as achievable potential through 2033. Given the magnitude of the capacity shortfall, the team modeled uptake when customers were given 100% of incremental costs for technologies that reduced their peak load. The survey showed a steep increase in willingness to adopt up to 100% incentives, with little change beyond 100% incentives. The table below shows the achievable potential for the top ten measures in the study. Most of the top measures are BE measures, but the most important measure was a gas equipment measure, meaning replacing gas equipment with more efficient gas equipment. 68
  9. Page 69 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 69 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 69 of 142 Table 4-21: Top Ten Achievable Potential Measures Sector Measure Name Measure Type RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Residential Gas Furnace Replacement Gas Equipment 40 14 2 Residential Thermostat DR EE 33 11 2 Commercial Com ASHP BE 31 11 0 Residential Furnace Electrification with ccASHP BE 29 10 1 Residential Boiler Electrification with ccASHP BE 26 9 1 Commercial Com Load Shedding DR 22 7 0 Residential Energy Star New Home EE 20 7 1 Commercial Com VRF BE 17 6 0 Residential Whole Building Electrification BE 15 5 1 Residential Ground Source Heat Pump BE 14 5 1 Table 4-22 shows achievable potential by measure type and measure category, including transport customers. Electrification, gas equipment (furnaces and boilers), and DR make up most of the achievable potential by measure category. Table 4-22: Achievable Potential by Measure Category Measure Type Measure Category RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Total (mscfh) BE Electrification 148 51 5 204 DR DR 59 20 2 82 Gas Equipment Gas Equipment 57 20 3 79 EE Building Shell 21 7 1 29 EE Whole Building 20 7 1 27 EE Water Saving 0 0 0 0 Behavior Behavior 6 2 0 9 Total Total 306 105 12 423 Figure 4-68, Figure 4-69, and Figure 4-70 show the total achievable potential for all measures and all building sectors in Breckenridge, Keystone, and Grand Lake. 69
  10. Page 70 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 70 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 70 of 142 Figure 4-68: Breckenridge Achievable Potential 350 Peak Hourly Demand (mcfh) 300 250 200 150 100 50 0 2025 2026 2027 2028 2029 2030 2031 2032 2033 2032 2033 Achievable Potential Figure 4-69: Keystone Achievable Potential 120 Peak Hourly Demand (mcfh) 100 80 60 40 20 0 2025 2026 2027 2028 2029 2030 Achievable Potential 70 2031

Text of CLF-011 Attachment 18.pdf

Extracted from the file · 22 pages · 55,502 characters

Text of CLF-011 Attachment 19.pdf

Extracted from the file · 18 pages · 27,716 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)