Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

  1. Page 71 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 71 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 71 of 142 Figure 4-70: Grand Lake Achievable Potential 14 Peak Hourly Demand (mcfh) 12 10 8 6 4 2 0 2025 2026 2027 2028 2029 2030 2031 2032 2033 Achievable Potential The residential sector had the highest achievable potential, as shown in Table 4-23, as a result of the residential building group contributing more than other building groups to peak load as well as a higher market maturity for electrification technologies. Historically, transport customers have not been eligible to participate in gas EE programs since they do not contribute to funding gas programs. However, transport customers consume a significant amount of gas during the system peak hour and represent a significant portion of overall achievable potential in Breckenridge and Keystone. Table 4-23: Achievable Potential by Building Type Building Sector Building Type RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Total (mscfh) Residential SF 178 62 9 249 MF 34 12 2 47 Commercial Commercial 30 12 1 43 Multifamily Commercial 8 2 0 11 Transport 48 17 0 65 Multifamily Transport 18 5 0 23 Total 306 105 12 423 Transport Total Figure 4-71, Figure 4-72, and Figure 4-73 show the total achievable potential by measure type and all building sector in Breckenridge, Keystone, and Grand Lake. Residential building electrification measures have the highest achievable potential. Most of the commercial potential is located at transport customer facilities. 71
  2. Page 72 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 72 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 72 of 142 Figure 4-71: Cumulative Achievable Potential by Sector and Measure Type Delivered to RB-4 (Breckenridge) 350 300 Transport Peak Gas Savings (mscfh) 250 Commercial 200 150 100 Residential 50 0 2025 2026 2027 BE 2028 2029 2030 EE Behavior DR 72 2031 2032 Gas Equipment 2033
  3. Page 73 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 73 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 73 of 142 Figure 4-72: Achievable Potential by Sector and Measure Type Delivered to RX-7 (Keystone) 120 100 Peak Gas Savings (mscfh) Transport 80 Commercial 60 40 Residential 20 0 2025 2026 2027 2028 BE EE 2029 2030 Behavior DR 73 2031 2032 Gas Equipment 2033
  4. Page 74 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 74 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 74 of 142 Figure 4-73: Achievable Potential by Sector and Measure Type Delivered to RG-12 (Grand Lake) 14 12 Transport Commercial Peak Gas Savings (mscfh) 10 8 6 Residential 4 2 0 2025 2026 2027 2028 BE EE 2029 2030 Behavior DR 2031 2032 2033 Gas Equipment Achievable potential, delivered to each constraint point from each geographic area was calculated separately. As shown in Table 4-24, the Breckenridge and Keystone are both helped the most by actions taken immediately adjacent to the constraint, with some additional benefits derived from nearby areas. Meanwhile, the Grand Lake constraint can only be solved by actions taken in Grand Lake. The modeling also showed that actions in Area 4 have minimal benefits at the constraint point in the Eastern Mountain Gas System, which should not be surprising, given that Area 4 is in the Southern Mountain System, with only a very limited connection to the Eastern Mountain Gas System. Table 4-24: Achievable Potential by Geographic Area of Installation RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Total (mscfh) Area 2 - Breckenridge 155 7 0 162 Area 2 - Keystone 35 56 0 91 Area 3 46 15 0 60 Other Area 2 28 12 0 40 Other Area 1 21 8 0 29 Geographic Area 74
  5. Page 75 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 75 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 75 of 142 Geographic Area RB-4 (Breckenridge) (mscfh) RX-7 (Keystone) (mscfh) RG-12 (Upper Grand Lake) (mscfh) Total (mscfh) Area 1 – Other Grand Lake 19 7 0 26 Area 1 - Grand Lake Top 8 3 12 23 Area 4 6 2 0 8 Total 306 105 12 423 4.7 NPA DSM Solution Development Conclusions The NPA DSM solution development effort resulted in a series of conclusions that feed directly into the design of NPA portfolios. These conclusions are reiterated below for convenience. 4.7.1 Building Type, End Use Disaggregation, and Geographic Area Analysis Conclusions Conclusion 1: Based on analysis of existing peak hour gas demand, single family residential buildings were identified as having the highest peak hour loads, with master-metered multifamily and lodging the commercial areas with the highest peak hour loads. • Implication for Portfolio and Plan Development: The development of the portfolios and plan should focus on residential solutions first. Within commercial areas, the portfolios and plan should focus extra effort on master-metered multifamily and lodging. Conclusion 2: Space heating is by far the largest end use contributing to peak hour consumption. • Implication for Portfolio and Plan Development: Space heating should be the focus of NPA portfolio and plan development, with a particular focus on residential space heating. Conclusion 3: Areas 2 and 3 in Summit County including Breckenridge, Keystone, other parts of Area 2, and Area 3 deliver the highest fraction of peak hour reductions to Breckenridge and Keystone. The immediate area around Grand Lake (Grand Lake Top) is the only area that can deliver peak hour reductions to the Grand Lake constraint. • Implication for Portfolio and Plan Development: The delivery of NPA solutions should focus on Area 2 and Area 3, including Summit County and the area running from Minturn to Leadville, including the towns of Minturn, Red Cliff, and Leadville, plus surrounding area, as well as the immediate area around Grand Lake. 4.7.2 Residential Survey Conclusions Conclusion 4: Survey respondents in the mountains were much more likely to rent out their home on a shortterm basis than respondents on the front range. Conclusion 5: Survey respondents in the mountains had higher income and education than respondents on the front range. • Implication for Portfolio and Plan Development: Messaging and marketing should be adjusted to reflect the different homeowner demographics in the mountains. Conclusion 6: Many more homes in the mountains have boilers when compared to the front range. Conclusion 7: Very few homes in the mountains have cooling currently or are looking to add cooling. 75
  6. Page 76 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 76 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 76 of 142 • Implication for Portfolio and Plan Development: Marketing heat pumps to customers in the mountains will need to focus more on ductless heat pumps installed at homes with boilers and selling other benefits besides comfort from cooling. Conclusion 8: A large majority of survey respondents are unfamiliar with existing Company program offerings and other incentive opportunities. • Implication for Portfolio and Plan Development: Increased marketing focused on program awareness may be helpful. Conclusion 9: Respondents were highly sensitive to upfront costs of equipment in their willingness to participate. Willingness to participate did not change appreciably above 100% of costs being covered. Conclusion 10: Respondent were less sensitive to increases in operating costs, with 50% of customers willing to install a free heat pump, even with an increase in operating costs of $1,000 per year. • Implication for Portfolio and Plan Development: Offering 100% incentives will dramatically increase willingness to participate, even if operating costs are going up significantly. 4.7.3 Commercial Survey Conclusions Conclusion 11: A significant number of respondents indicated they were somewhat likely to add to cooling. • Implication for Portfolio and Plan Development: This represents an opportunity to sell some businesses on the cooling benefits of heat pumps. Conclusion 12: 20% of respondents had snow melt systems connected to a boiler and 7% had outdoor fireplaces. • Implication for Portfolio and Plan Development: This represents an opportunity for facility-specific DR actions. Conclusion 13: 80% of respondents were interested in installing a free heat pump, even with an increase in operating costs. • Implication for Portfolio and Plan Development: 100% incentives may motivate people to adopt heat pumps, even with an increase in operating costs. 4.7.4 Contractor/Builder Interview Conclusions Conclusion 14: Builders and contractors reported low familiarity and low trust of heat pumps. They are concerned about the opportunity to completely displace gas heating due to high altitudes and cold mountain temperatures. • Implication for Portfolio and Plan Development: The interviews indicated that significant training and preparation of market structure will be needed as manufacturers, distributors, and architects will need to lead the contractors and builders to choose new electrification technologies. 4.7.5 Potential Conclusions Conclusion 15: Technical potential: Electrification measures have the highest technical potential, allowing for technical potential to eliminate almost 100% of existing gas load. • Implication for Portfolio and Plan Development: In the long run, electrification has the highest potential, so preparing the market for electrification will be required for large reductions in the long run. Conclusion 16: Economic supply curves: Electrification measures have high costs, driven primarily by cost of capacity increases. • Implication for Portfolio and Plan Development: If electrification measures can be developed with lower peak demand impacts (e.g. using other backup systems besides electric resistance), economics of electrification can be significantly reduced. 76
  7. Page 77 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 77 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 77 of 142 Conclusion 17: Achievable potential: The highest potential comes from high efficiency gas equipment, electrification, and DR. • Implication for Portfolio and Plan Development: Plan should develop solutions for all three of these areas and not exclude any of them from the solution. 77
  8. Page 78 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 78 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 78 of 142 5 Alternative Portfolios Alternative portfolios, comprised of a variety of measures to alleviate the capacity constraint, were developed for specific geographies based on the underlying customer types. The alternative portfolios were optimized for the lowest cost, while meeting operational requirements. To develop portfolios, a multistep approach was implemented, as demonstrated in Figure 5-1. Figure 5-1: Alternative Portfolio Development Process Five alternative portfolios were developed for the Eastern Mountain Gas System. The alternative portfolios included an Electric Portfolio, several NPA-Only Portfolios, and several Hybrid Portfolios. The alternative portfolio analysis focused on the least cost among all achievable potential solutions. A baseline gas infrastructure project was supplied by the Company for comparative purposes to measure the success of the alternative portfolios. Each alternative portfolio was evaluated based on its ability to meet the capacity constraint in the Eastern Mountain Gas System. If an alternative portfolio was able to meet the capacity constraint, then the cost effectiveness of the portfolio was assessed using a cost benefit analysis framework. Five potential alternative portfolios were considered for alleviating the capacity constraint in the Eastern Mountain Gas System. The alternative portfolios can be divided into two categories: 1. Demand Side Portfolios – these alternative portfolios included an Electric Portfolio and two NPA-Only Portfolios, differing in their inclusion of gas consuming appliance incentives and transport customers. 2. Two Hybrid Portfolio options combing NPA portfolios with supplemental supply infrastructure. Once assembled, the alternative portfolios were evaluated under four criteria through an iterative process. The first threshold an alternative portfolio must successfully pass was whether the alternative portfolio could meet the capacity constraint and close the gap within 10 years. If the alternative portfolio could not achieve this baseline, the portfolio was removed from additional consideration. If the portfolio was able to close the capacity constraint within 10 years, the alternative portfolio was analyzed using the cost-benefit analysis tool to assess 1) program and incentive costs, 2) electric system impacts, and 3) emission impacts. Additionally, the Company provided a baseline gas infrastructure solution to test the other alternative portfolios for cost effectiveness. These alternative portfolios and their potential for alleviating the capacity constraint in the Eastern Mountain Gas System are presented in the following sections. 78
  9. Page 79 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 79 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 79 of 142 5.1 Demand Side Portfolios The three alternative portfolios considered as demand side portfolios were the Electric Portfolio and two NPAOnly Portfolios. The NPA-Only Portfolios can be further broken down into additional portfolios, inclusive and exclusive of transport customers and LDC growth. Electric Only Portfolio The Electric Only Portfolio was a portfolio comprised of only customer side solutions (i.e. NPA measures and technologies) including DR, building electrification, and non-equipment gas EE measures for residential and commercial customers, not including transport customers. The portfolio excluded incentives for gas consuming equipment. While gas demand response and building shell measures are not strictly electrification measures, they are included in the electric portfolio as they do not promote gas infrastructure or gas appliance installation. This potential alternative portfolio was analyzed to determine whether the capacity constraint could be solved without the need for gas consuming appliance incentives. Figure 5-2, Figure 5-3, and Figure 5-4 below show the peak hour savings contribution to the Electric Only Portfolio over time for the different measure types by building sector, compared to the shortfall in Breckenridge, Keystone, and Grand Lake, respectively. Figure 5-2: Electric Portfolio Peak Hour Impacts Delivered to RB-4 (Breckenridge) 500 450 400 Peak Gas Savings (mscfh) 350 Persisting Shortfall 300 250 200 Commercial 150 100 Residential 50 0 2025 2026 2027 BE 2028 EE 2029 2030 Behavior 79 2031 DR 2032 2033 Shortfall
  10. Page 80 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 80 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 80 of 142 Figure 5-3: Electric Portfolio Peak Hour Savings Delivered to RX-7 (Keystone) 140 120 Persisting Shortfall Peak Gas Savings (mscfh) 100 80 Commercial 60 40 Residential 20 0 2025 2026 2027 2028 BE EE 2029 2030 Behavior 80 2031 DR 2032 2033 Shortfall

Text of CLF-011 Attachment 18.pdf

Extracted from the file · 22 pages · 55,502 characters

Text of CLF-011 Attachment 19.pdf

Extracted from the file · 18 pages · 27,716 characters