Interrogatory responses
Answers to questions 11
Files6
CLF-011 Attachment 14.pdf
PDF · 3.1 MB · 23 pagesText searchable
Download CLF-011 Attachment 14.pdfRead the text of CLF-011 Attachment 14.pdf
CLF-011 Attachment 15.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download CLF-011 Attachment 15.pdfRead the text of CLF-011 Attachment 15.pdf
CLF-011 Attachment 16.pdf
PDF · 4.6 MB · 20 pagesText searchable
Download CLF-011 Attachment 16.pdfRead the text of CLF-011 Attachment 16.pdf
CLF-011 Attachment 17.pdf
PDF · 4.3 MB · 142 pagesText searchable
Download CLF-011 Attachment 17.pdfRead the text of CLF-011 Attachment 17.pdf
CLF-011 Attachment 18.pdf
PDF · 2.1 MB · 22 pagesText searchable
Download CLF-011 Attachment 18.pdfRead the text of CLF-011 Attachment 18.pdf
CLF-011 Attachment 19.pdf
PDF · 1.9 MB · 18 pagesText searchable
Download CLF-011 Attachment 19.pdfRead the text of CLF-011 Attachment 19.pdf
Page 83 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 83 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 83 of 142 achievable potential results shown below should be considered as an aggressive scenario representing the maximum achievable available. NPA Portfolio 1 NPA Portfolio 1 is identical to the Electric Portfolio, focusing on customer side NPA solutions, except this portfolio includes incentives for gas consuming appliances. NPA measures within this portfolio included DR, electrification, shell measures, and energy efficient gas appliances. The NPA Portfolio 1 includes energy efficient gas equipment with a phase out of incentives for this equipment beginning in 2029. The phase out in 2029 aligns with Department of Energy standards requiring residential gas furnaces to meet high efficiency standards. Savings associated with high efficiency gas equipment required by standards after this date are included in this portfolio, to reflect the impact of these standards in reducing the shortfall, while costs are excluded, because incentives will no longer be offered after 2028. Figure 5-5, Figure 5-6, and Figure 5-7 below show the peak hour savings contribution to NPA Portfolio 1 over time for the different measure types by building sector (transport not included), compared to the shortfall in Breckenridge, Keystone, and Grand Lake, respectively. Figure 5-5: NPA Portfolio 1 Peak Hour Impacts Delivered to RB-4 (Breckenridge) 500 450 400 Persisting Shortfall Peak Gas Savings (mscfh) 350 300 250 Commercial 200 150 100 Residential 50 0 2025 2026 BE 2027 EE 2028 2029 Behavior 2030 DR 83 2031 2032 2033 Gas Equipment ShortfallPage 84 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 84 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 84 of 142 Figure 5-6: NPA Portfolio 1 Peak Hour Impacts Delivered to RX-7 (Keystone) 140 120 Persisting Shortfall Peak Gas Savings (mscfh) 100 80 Commercial 60 40 Residential 20 0 2025 2026 BE 2027 EE 2028 2029 2030 Behavior DR 84 2031 2032 Gas Equipment 2033 ShortfallPage 85 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 85 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 85 of 142 Figure 5-7: NPA Portfolio 1 Peak Hour Impacts Delivered to RG-12 (Grand Lake) 14 12 Commercial Peak Gas Savings (mscfh) 10 8 6 Residential 4 2 0 2025 2026 2027 BE 2028 EE 2029 2030 Behavior DR 2031 2032 2033 Gas Equipment Shortfall Even with aggressive incentives and the significant addition of gas equipment measures, the team found a persisting shortfall at the Breckenridge and Keystone constraint points for NPA Portfolio 1. Table 5-2 below shows a summary of cumulative program impacts by year. Electric capacity costs make up a significant portion of the overall direct utility costs associated with this portfolio. The resulting portfolio has direct utility costs of $362,000 per mscfh delivered in 2033. While the savings include savings from furnaces after the federal standard goes into effect in 2029, the costs do not include costs from furnaces after this point in time. Table 5-2: NPA Portfolio 1 Cumulative Impacts and Costs by Year Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2025 23 15 5 1 982 $185,459 $4,424,263 $4,609,722 2026 56 36 13 2 2,262 $621,181 $10,196,308 $10,817,489 2027 90 59 21 3 3,949 $1,397,116 $17,591,663 $18,988,779 2028 129 85 29 4 6,191 $2,637,916 $27,011,003 $29,648,919 2029 169 110 38 5 9,156 $4,509,717 $35,864,331 $40,374,048 2030 211 138 48 7 13,047 $7,230,142 $46,982,403 $54,212,544 85Page 86 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 86 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 86 of 142 Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2031 258 169 59 8 18,102 $11,080,277 $60,857,217 $71,937,494 2032 311 203 71 10 24,607 $16,418,642 $78,088,853 $94,507,495 2033 373 244 85 12 32,933 $23,705,823 $99,377,323 $123,083,145 NPA Portfolio 2 The inability of NPA Portfolio 1 to alleviate the shortfall in Breckenridge and Keystone prompted the team to explore an additional scenario (NPA Portfolio 2) where transport customers are included in demand-side programs. Figure 5-8, Figure 5-9, and Figure 5-10 below show the peak hour savings contribution to NPA Portfolio 2 over time for the different measure types by building sector (including transport), compared to the shortfall in Breckenridge, Keystone, and Grand Lake, respectively. Figure 5-8: NPA Portfolio 2 Peak Hour Impacts Delivered to RB-4 (Breckenridge) 500 450 Peak Gas Savings (mscfh) 400 Persisting Shortfall 350 300 Transport 250 Commercial 200 150 100 Residential 50 0 2025 2026 BE 2027 EE 2028 2029 2030 Behavior DR 86 2031 2032 Gas Equipment 2033 ShortfallPage 87 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 87 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 87 of 142 Figure 5-9: NPA Portfolio 2 Peak Hour Impacts Delivered to RX-7 (Keystone) 140 120 Persisting Shortfall 100 Peak Gas Savings (mscfh) Transport 80 Commercial 60 40 Residential 20 0 2025 2026 BE 2027 EE 2028 2029 2030 Behavior DR 87 2031 2032 2033 Gas Equipment ShortfallPage 88 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 88 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 88 of 142 Figure 5-10: NPA Portfolio 2 Peak Hour Impacts Delivered to RG-12 (Grand Lake) 14 12 Transport Commercial Peak Gas Savings (mscfh) 10 8 6 Residential 4 2 0 2025 2026 BE 2027 EE 2028 2029 Behavior 2030 DR 2031 2032 2033 Gas Equipment Shortfall The shortfall in Breckenridge and Keystone remained under all scenarios. Given that each of the NPA-Only Portfolios resulted in a persistent capacity shortfall in Breckenridge and Keystone over the next ten years, the PA team and Company determined that NPA-only solutions were insufficient to eliminate the shortfall. Table 5-3 below shows a summary of cumulative program impacts by year. Electric capacity costs make up a significant portion of the overall direct utility costs associated with this portfolio. The resulting portfolio has direct utility costs of $390,000 per mscfh delivered in 2033. While the savings include savings from furnaces after the federal standard goes into effect in 2029, the costs do not include costs from furnaces after this point in time. Table 5-3: NPA Portfolio 2 Cumulative Impacts and Costs by Year Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2025 27 19 6 1 1,174 $248,040 $5,573,471 $5,821,511 2026 65 44 15 2 2,715 $830,772 $12,735,168 $13,565,890 2027 107 72 25 3 4,745 $1,866,448 $21,568,011 $23,434,460 2028 153 104 36 4 7,424 $3,516,535 $33,376,197 $36,892,732 2029 199 135 46 5 10,951 $5,994,280 $44,781,454 $50,775,734 88Page 89 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 89 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 89 of 142 Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2030 255 172 59 7 16,393 $9,582,553 $59,560,726 $69,143,280 2031 312 210 72 8 22,714 $14,646,125 $78,570,815 $93,216,940 2032 377 254 87 10 30,839 $21,648,220 $102,855,043 $124,503,262 2033 454 306 105 12 41,205 $31,177,571 $133,638,398 $164,815,970 5.2 Hybrid Portfolio Development Once the NPA Analysis concluded that an Electric Only and both NPA-Only Portfolios were insufficient for alleviating the capacity constraint in the Eastern Mountain Gas System, the PA team tested the potential for including gas infrastructure reinforcement (supplemental supply) to new portfolios. The Company informed the PA team that up to 285 mscfh of supplemental supply could be added in Breckenridge or Keystone. The PA team tested two Hybrid Portfolios, described in the following sections. Hybrid Portfolio 1 consisted of NPA Portfolio 2 with supplemental supply. Hybrid Portfolio 1 had relatively high costs of NPA measures and relatively low utilization of the supplemental supply in the late years. Hybrid Portfolio 2 was developed to explore the possibility of using more of the supplemental supply capacity in later years to reduce the cost of the portfolio. Hybrid Portfolio 2 utilizes a higher fraction of supplemental supply capacity in the later years, with a smaller, lower cost portfolio of NPA measures. Hybrid Portfolio 2 was ultimately the most cost-effective portfolio, discussed below. 5.2.1 Hybrid Portfolio 1 Hybrid Portfolio 1 comprises a portfolio that includes all achievable potential solutions, utilizing gas infrastructure, electrification, and NPA measures and technologies. Hybrid Portfolio 1 includes all NPA measures and incentives from NPA Portfolio 2, in addition to supplemental supply, and near-term use of temporary mitigation measures. The contents of Hybrid Portfolio 1 were determined thus: First, the PA team determined if supplemental supply was required at each shortfall point. While the Grand Lake shortfall at RG-12 could be met with the NPA-only portfolios, the shortfalls at RB-4 (Breckenridge) and RX-7 (Keystone) could not. Second, the PA team decided which measures and customers to include in the NPA portion of the Hybrid Portfolios. The inclusion of gas equipment DSM, through 2028, and transport customers in the NPA solution results in a lower cost per unit of peak reduction, so the PA team decided to include gas equipment DSM and transport customers in the NPA portion of Hybrid Portfolio 1, along with supplemental supply. Figure 5-11, Figure 5-12, and Figure 5-13 show the peak hour gas capacity delivered by Hybrid Portfolio 1 over time for the different measure types by building sector, compared to the shortfall in Breckenridge, Keystone, and Grand Lake respectively, while adding in contribution from supplemental supply and/or temporary mitigation measures. In this portfolio, the achievable NPA Portfolio from the potential study continues to be implemented throughout the time period, resulting in the supplemental supply contribution dropping over time as the NPA measures reduce incremental Design Day peak hour demand. 89Page 90 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 90 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 90 of 142 Figure 5-11: Hybrid Portfolio 1 Peak Hour Gas Capacity Delivered to RB-4 (Breckenridge) 500 450 Transport 400 Commercial Peak Gas Savings (mscfh) 350 300 250 Residential 200 150 100 Supplemental Supply 50 0 2025 2026 Supplemental Supply DR 2027 2028 2029 2030 BE Gas Equipment 2031 2032 EE Temporary Measures 90 2033 Behavior ShortfallPage 91 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 91 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 91 of 142 Figure 5-12: Hybrid Portfolio 1 Peak Hour Gas Capacity Delivered to RX-7 (Keystone) 140 120 Transport Peak Gas Savings (mscfh) 100 Commercial 80 60 Residential 40 20 Supplemental Supply 0 2025 2026 Supplemental Supply 2027 2028 BE 2029 EE 2030 Behavior 91 2031 DR 2032 2033 Gas Equipment ShortfallPage 92 of 142
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 92 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 92 of 142 Figure 5-13: Hybrid Portfolio 1 Peak Hour Gas Capacity Delivered to RG-12 (Grand Lake) 14 12 Transport Commercial Peak Gas Savings (mscfh) 10 8 6 Residential 4 2 0 2025 BE 2026 EE 2027 2028 Behavior 2029 DR 2030 2031 2032 Gas Equipment 2033 Temporary Measures Shortfall Table 5-4 below shows the resulting impacts and costs associated with the NPA portion of Hybrid Portfolio 1, not including impacts and costs of supplemental supply or temporary measures. The NPA impacts and costs are the same as in NPA Portfolio 2, with a direct utility cost of $390,000/mscfh for the NPA portion. While the savings include savings from furnaces after the federal standard goes into effect in 2029, the costs do not include costs from furnaces after this point in time. Table 5-4: Hybrid Portfolio 1 NPA Cumulative Impacts and Costs by Year Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2025 27 19 6 1 1,174 $248,040 $5,573,471 $5,821,511 2026 65 44 15 2 2,715 $830,772 $12,735,168 $13,565,890 2027 107 72 25 3 4,745 $1,866,448 $21,568,011 $23,434,460 2028 153 104 36 4 7,424 $3,516,535 $33,376,197 $36,892,732 2029 199 135 46 5 10,951 $5,994,280 $44,781,454 $50,775,734 2030 255 172 59 7 16,393 $9,582,553 $59,560,726 $69,143,280 2031 312 210 72 8 22,714 $14,646,125 $78,570,815 $93,216,940 92
Text of CLF-011 Attachment 18.pdf
Extracted from the file · 22 pages · 55,502 characters
Text of CLF-011 Attachment 19.pdf
Extracted from the file · 18 pages · 27,716 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026