  1. Page 91 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 91 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 91 of 142 Figure 5-12: Hybrid Portfolio 1 Peak Hour Gas Capacity Delivered to RX-7 (Keystone) 140 120 Transport Peak Gas Savings (mscfh) 100 Commercial 80 60 Residential 40 20 Supplemental Supply 0 2025 2026 Supplemental Supply 2027 2028 BE 2029 EE 2030 Behavior 91 2031 DR 2032 2033 Gas Equipment Shortfall
  2. Page 92 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 92 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 92 of 142 Figure 5-13: Hybrid Portfolio 1 Peak Hour Gas Capacity Delivered to RG-12 (Grand Lake) 14 12 Transport Commercial Peak Gas Savings (mscfh) 10 8 6 Residential 4 2 0 2025 BE 2026 EE 2027 2028 Behavior 2029 DR 2030 2031 2032 Gas Equipment 2033 Temporary Measures Shortfall Table 5-4 below shows the resulting impacts and costs associated with the NPA portion of Hybrid Portfolio 1, not including impacts and costs of supplemental supply or temporary measures. The NPA impacts and costs are the same as in NPA Portfolio 2, with a direct utility cost of $390,000/mscfh for the NPA portion. While the savings include savings from furnaces after the federal standard goes into effect in 2029, the costs do not include costs from furnaces after this point in time. Table 5-4: Hybrid Portfolio 1 NPA Cumulative Impacts and Costs by Year Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2025 27 19 6 1 1,174 $248,040 $5,573,471 $5,821,511 2026 65 44 15 2 2,715 $830,772 $12,735,168 $13,565,890 2027 107 72 25 3 4,745 $1,866,448 $21,568,011 $23,434,460 2028 153 104 36 4 7,424 $3,516,535 $33,376,197 $36,892,732 2029 199 135 46 5 10,951 $5,994,280 $44,781,454 $50,775,734 2030 255 172 59 7 16,393 $9,582,553 $59,560,726 $69,143,280 2031 312 210 72 8 22,714 $14,646,125 $78,570,815 $93,216,940 92
  3. Page 93 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 93 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 93 of 142 Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2032 377 254 87 10 30,839 $21,648,220 $102,855,043 $124,503,262 2033 454 306 105 12 41,205 $31,177,571 $133,638,398 $164,815,970 While Hybrid Portfolio 1 was able to meet the full required shortfall, the results of Hybrid Portfolio 1 showed relatively high costs of NPA solutions, along with an underutilization of supplemental supply expected in the later years. Higher utilization of the supplemental supply would allow for a smaller (and lower cost) NPA portfolio, by eliminating some of the additional NPA solutions after the shortfall is closed. As a result of these findings in Hybrid Portfolio 1, the team decided to explore further cost optimization in the development of Hybrid Portfolio 2. 5.2.2 Hybrid Portfolio 2 As discussed above, the installation of large quantities of NPA measures has a higher cost than continued use of supplemental supply. Therefore, it was determined to reduce the scope of the NPA portfolio after the initial four years of installation and eliminate high-cost measures and reduce the size of the NPA portion in Hybrid Portfolio 2 after this point to solve the constraint, with continued consistent utilization of supplemental supply in the later years. The resulting Hybrid Portfolio 2 supports system reliability while reducing capitalized gas infrastructure spend. To optimize the cost of Hybrid Portfolio 2, the PA team applied a more stringent measure-level costeffectiveness screen to installations occurring after 2029. This rigorous screen resulted in many higher cost measures, including most full electrification measures, to have their incremental NPA incentives eliminated from Hybrid Portfolio 2 after 2029. The team continued to model additional adoption of gas furnaces, without incentives, as required by federal code after 2028. Figure 5-14, Figure 5-15, and Figure 5-16 show the peak hour gas capacity delivered by Hybrid Portfolio 2 over time for the different measure types by building sector, compared to the shortfall in Breckenridge, Keystone, and Grand Lake, respectively, while adding in contribution from supplemental supply. It’s important to recognize that the peak hour capacity delivered is based on extreme conditions used in gas modeling. As a result, there’s a distinction between usage of always-on NPA solutions, including EE and building electrification, and the usage of dispatchable resources, like DR and the supplemental supply solutions. 93
  4. Page 94 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 94 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 94 of 142 Figure 5-14: Hybrid Portfolio 2 Peak Hour Gas Capacity Delivered to RB-4 (Breckenridge) 94
  5. Page 95 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 95 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 95 of 142 Figure 5-15: Hybrid Portfolio 2 Peak Hour Gas Capacity Delivered to RX-7 (Keystone) 95
  6. Page 96 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 96 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 96 of 142 Figure 5-16: Hybrid Portfolio 2 Peak Hour Gas Capacity Delivered to RG-12 (Grand Lake) 8 7 Transport Commercial Peak Gas Savings (mscfh) 6 5 4 Residential 3 2 1 0 2025 BE 2026 EE 2027 Behavior 2028 DR 2029 2030 2031 Gas Equipment 2032 2033 Temporary Measures Shortfall In consultation with the Company’s implementation team, the team decided to reduce the area served in this portfolio to focus on the areas with the highest concentration of potential savings. The PA team determined that installations in Area 2, Area 3, and Upper Grand Lake, collectively deliver over 85% of the achievable potential benefits in Breckenridge, Keystone, and Grand Lake. As such, the Company’s implementation team and PA team determined that the eligible area for implementation will include Area 2, Area 3, and Upper Grand Lake, which includes Summit County and the towns of Grand Lake, Leadville, Red Cliff, and Minturn. As a result, the same potential for savings is expected, but realized over a small geography. By concentrating program marketing effort in a smaller area, the team believes that it will be able to meet the NPA goals more cost-effectively. The supplemental supply equipment allows for operational contingency against potentially slower than predicted NPA technology adoption, reduces stranded asset risk as compared to piping reinforcements, and provides peak hour demand shaving, as seen in Figure 5-17. 96
  7. Page 97 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 97 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 97 of 142 Figure 5-17: Hybrid Portfolio 2 Design Day Peak Hour Demand in 2033 Table 5-5 below shows the cumulative impacts and costs associated with the NPA portion of Hybrid Portfolio 2. The NPA portion has a direct utility cost of $290,000 per mscfh. The NPA-related costs of Hybrid Portfolio 2 are less than half the NPA-related cost of Hybrid Portfolio 1, while the supplemental supply and temporary measures are anticipated to have similar costs. While the savings include savings from furnaces after the federal standard goes into effect in 2029, the costs do not include costs from furnaces after this point in time. Table 5-5: Hybrid Portfolio 2 NPA Cumulative Impacts and Costs by Year Year Premiselevel Peak Hour Gas Impact (mscfh) RB-4 Peak Hour Gas Impact (mscfh) RX-7 Peak Hour Gas Impact (mscfh) RG-12 Peak Hour Gas Impact (mscfh) Electric Grid Impacts (kW) Marginal Electric Capacity Costs Program + Incentive Costs Total Program + Electric Infrastructure Costs 2025 27 19 6 1 1,174 $248,040 $5,573,471 $5,821,511 2026 65 44 15 2 2,715 $830,722 $12,735,168 $13,565,890 2027 107 72 25 3 4,745 $1,866,448 $21,568,011 $23,434,460 2028 153 104 36 4 7,424 $3,516,535 $33,376,197 $36,892,732 2029 199 135 46 5 10,951 $5,994,280 $44,781,454 $50,775,734 2030 209 142 49 6 10,950 $8,521,579 $45,691,415 $54,212,994 2031 219 148 51 6 10,948 $11,099,468 $46,648,431 $57,747,898 2032 229 155 53 6 10,946 $13,728,907 $47,661,588 $61,390,495 2033 239 162 56 7 10,943 $16,410,857 $48,742,311 $65,135,169 5.2.3 Supply Side Measures Supporting the Hybrid Portfolio Given the Electric and NPA-Only alternative portfolios were unable to solve for the capacity constraint, a modular LNG site in Breckenridge and a modular CNG site in Keystone were included as part of the Hybrid Portfolios to support system reliability and growth. 97
  8. Page 98 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 98 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 98 of 142 Assumptions around the costs associated with these supply side measures, provided by the Company, included temporary LNG and CNG equipment lease payments and modular CNG and LNG costs at Keystone and Breckenridge, respectively. Costs were provided in nominal dollars and reflect the in-service/retire dates. 5.3 Results, and Recommendations Following development and analysis of optimized alternative portfolios, results support recommendation of Hybrid Portfolio 2. Portfolios were developed to optimized for cost and GHG objectives, while meeting operational requirements. Hybrid Portfolio 2 solves the capacity constraints and is the lowest cost option, while also supporting less reliance on gas infrastructure and progress towards end-use decarbonization. Figure 5-18 shows the 10-year long term plan cost estimates for the potential solutions evaluated. Figure 5-18: 10-Year Long Term Plan Cost Estimates19 Hub and Spoke (Maximum Scenario) Hub and Spoke (Minimum Scenario) Electric Portfolio (Infeasible - Capacity Shortfall Not Met) NPA Portfolio 1 (Infeasible - Capacity Shortfall Not Met) NPA Portfolio 2 (Infeasible - Capacity Shortfall Not Met) Hybrid Portfolio 1 Hybrid Portfolio 2 $0 Gas Infrastructure $100 NPA Program $200 ($ millions) $300 $400 Electric Capacity (Marginal) The implementation of the NPA measures and technologies in Hybrid Portfolio 2 results in end-use emissions reductions, with emissions decreasing 150% as compared to the maximum gas infrastructure solution . The PA team performed the cost-benefit analysis of both Hybrid Portfolio 1 and Hybrid Portfolio 2. As seen in Figure 5-19, Hybrid Portfolio 2 resulted in being more cost-effective as compared to Hybrid Portfolio 1 under both the primary modified total resource cost test (EMTRC) and the secondary expanded, rate-payer impact measure test (ERIM). Hybrid Portfolio 2 is more cost effective than Hybrid Portfolio 1 because Hybrid Portfolio 2 eliminates the implementation of higher-cost NPA measures after the initial four years when the constraint is met. Both Hybrid Portfolio 1 and 2 utilize supplemental supply, the difference being Hybrid Portfolio 2 favors utilization of supplemental supply at a consistent level as the lower-cost alternative to more expensive NPA measures. 19 Includes the marginal cost of electric capacity. 98
  9. Page 99 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 99 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 99 of 142 Figure 5-19: Cost Effectiveness Comparison of Hybrid Portfolios $250,000,000 $200,000,000 $150,000,000 $200 $193 $128 $140 $100,000,000 $50,000,000 $0 Hybrid Portfolio Hybrid Portfolio Hybrid Portfolio Hybrid Portfolio 1 - EMTRC 2 - EMTRC 1 - ERIM 2 - ERIM As seen in Figure 5-20 to 5-22, the modular LNG equipment at the proposed Breckenridge site is assumed to be fully utilized at the equipment maximum flow rate of 285 mscfh in the 2033-‘34 heating season on Design Day. If required, additional LNG equipment can be added if the NPA program adoption is less successful than anticipated. The modular CNG equipment at the proposed Keystone site is assumed to be utilized at a flow rate of 69 mscfh in the 2033-’34 heating season on Design Day. If required, additional modular supplemental supply equipment can be added if the NPA program adoption is less successful than anticipated. Figure 5-20: Hybrid Portfolio 2 Modular LNG Breckenridge 99
  10. Page 100 of 142

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 17 Page 100 of 142 Hearing Exhibit 102, Attachment GKJ-2 Proceeding No. 25A-____EG Page 100 of 142 Figure 5-21: Hybrid Portfolio 2 Modular CNG Keystone Figure 5-22: Hybrid Portfolio 2 Modular CNG Grand Lake Hybrid Portfolio 2, which includes gas appliances, reflects the implementation of 34,000 customers within the NPA project area with 80% assumed to be residential and 20% commercial. Hybrid Portfolio 2 includes Behavior Response programs (47% of program), Thermostat DR (9%), Gas EE Appliances (13%), Building Shell Measures (4%), and Electrification (1%). Hybrid Portfolio 2, in addition to being cost competitive and alleviating the capacity constraint, provides strategic considerations to the Company, especially as the Company navigates decarbonization in an emerging regulatory landscape. By implementing the Hybrid Portfolio 2, the Company can maintain physical flexibility of resources and planning flexibility over the next ten years. Through 2029, to meet the capacity constraint, the Company can fund and progress NPA measures and solutions, allowing the Company to learn about the implementation of NPAs while alleviating the constraint and progressing their decarbonization targets. 5.4 Electrification Analysis Lastly, to understand the impact of the NPA measures on the electric distribution grid, the electric potential peak impacts at the feeder level were estimated using the portfolio analysis results, using the following steps: 1. For each premise, disaggregate peak hour gas load by end use. For each end use, apply assumed gas combustion efficiency and assumed electric efficiency during peak hours to estimate resulting 100

Text of CLF-011 Attachment 18.pdf

Extracted from the file · 22 pages · 55,502 characters

Text of CLF-011 Attachment 19.pdf

Extracted from the file · 18 pages · 27,716 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)