Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of CLF-011 Attachment 28.pdf

Extracted from the file · 4 pages · 6,964 characters

Text of CLF-011 Attachment 29.pdf

Extracted from the file · 5 pages · 11,434 characters

Text of CLF-011 Attachment 30.pdf

Extracted from the file · 47 pages · 125,202 characters

  1. Page 46 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 46 of 65 Appendix A: Data Collection Instruments 1. What proportion of your commercial HVAC installations for systems 25 tons or less fall into each of the following categories? [Check that responses total 100%, probe if they do not] Project Type % of Commercial Installations 25 Tons or Less Equipment replacement: Installing new equipment to replace existing equipment or an existing system that may or may not still be functional. - Plan and specify new construction: Installing a new system where one did not previously exist or has been completely removed, based on a design and specifications provided to you. - Design/build new construction: Installing a new system where one did not previously exist or has been completely removed, based on a design you develop. - Other: [ - ] Introduction (5 min, start at 0:00) Hello everyone, and thanks for joining us today. My name is [NAME]. As we mentioned when we Minnesota Commerce Department that will help utilities in the state improve their energy efficiency programs. The goal of our research, and this conversation, is to better understand what it is like to be a HVAC project, what decisions get made along the way, and what you need to take into consideration as you make those decisions. Our goal is to help utilities design programs that fit better with the realities of the commercial HVAC industry. Before we get started, there are a few housekeeping items I need to go over: 1. I know there are lots focused on the discussion, just like you would if we were in a room together. 2. each other, and conversations online can be a little awkward. So, we will need to give each other a little extra slack and patience. 3. We want to learn about how things work differently as well as what is similar for each of you. We welcome different opinions. 4. call on you. Or, if you have been talking a lot, I might ask you to give someone else a turn. I appreciate your understanding and cooperation in making sure everyone gets to speak. 5. Our discussion will take 90 minutes. We will take a five-minute break partway through, but if K. We hope you will come back as soon as you can. HVAC Market Actor Profile EcoMetric 44
  2. Page 47 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 47 of 65 Appendix A: Data Collection Instruments 6. If there is background noise where you are, please mute yourself when you are not speaking. 7. Some people will be listening-in to our discussion today. Some of my colleagues and [LIST ANY OBSERVERS FROM THE DEPARTMENT AND/OR UTILITIES] are on the line. 8. As I mentioned, our goal is to learn from your experience and expertise, and we appreciate your honesty. Nothing you say tonight is going to have any impact on your relationships with utility programs or anything like that. 9. We will be video and audio recording the conversation today. We may share the recordings with 10. Our report will not include any information that identifies individual respondents. Any questions before we begin? Warm-Up Question (5 min, start at 0:05) Q1. First, I would like to go around and have everyone tell us your name and one way your work has fore as things everyone to talk most of the time we can let the conversation flow more naturally. Motivations (10 min, start at 0:10) Q2. To start with, please quickly take me through a typical day: How is it structured? What kinds of things are you doing? a. Is that the same for everyone? How is the structure of your day different? b. How much variation is there in the kinds of things you do from one day to the next? Q3. What makes a day a good day for you? a. What are the most rewarding parts of your job? b. Are there some types of installations you like more than others? Q4. And what makes a bad day? a. What is the most challenging part of your job? b. What is the most frustrating part of your job? Project Decision-Making Equipment Replacement (15 min, start at 0:20) Q5. an equipment replacement scenario. [REFERENCE SCREENER/PRE-GROUP QUESTIONNAIRE DATA ABOUT FREQUENCY OF PROJECTS BY TYPE] HVAC Market Actor Profile EcoMetric 45
  3. Page 48 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 48 of 65 Appendix A: Data Collection Instruments How do you typically find equipment replacement work? [IF NEEDED, PROBE ON: MAINTENANCE CONTRACTS, RELATIONSHIPS WITH EXISTING CUSTOMERS, REFERRALS, MARKETING, ETC.] Q6. How often do you recommend the equipment to install in a replacement scenario, as opposed to having it specified by someone else? a. Who typically specifies the equipment in a replacement scenario if it is not you? b. Are there certain types of projects or certain types of customers where it is more likely that someone else will specify the equipment for a replacement? Q7. What, if anything, would lead you suggest a type of equipment other than the existing equipment type in a replacement scenario? a. What prevents you from suggesting different equipment types more often? b. When, if ever, would you suggest customers switch from gas equipment to electric equipment in a replacement scenario? How often does that occur? Q8. What about the efficiency of the equipment itself: how often do you suggest equipment that has a higher efficiency level in a replacement, as opposed to one that just meets code? a. In what types of projects or for which types of customers are you more likely to recommend high efficiency equipment? b. What prevents you from recommending higher efficiency systems more often? c. How receptive are customers to higher efficiency systems when you suggest them? Q9. Who do you look to for information to inform your recommendations in an equipment replacement scenario? a. What information do you look for from the end-user? b. What role does your distributor play in helping identify options to recommend? c. When would you bring in an engineer? Do you have that capability on your staff? If not, how would you find one? Plan & Spec New Construction (10 min, start at 0:35) Q10. [REFERENCE SCREENER/PREGROUP QUESTIONNAIRE DATA ABOUT FREQUENCY OF PROJECTS BY TYPE]. How do you typically find plan and spec work? How often are you responding to open bids, as opposed to more limited requests for proposals? a. What, if anything, do you do to differentiate your proposals in plan and spec work, or is the competition just based on price? HVAC Market Actor Profile EcoMetric 46
  4. Page 49 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 49 of 65 Appendix A: Data Collection Instruments b. What types of customers or types of buildings are more likely to take a plan and spec approach? Q11. Who typically specifies the equipment in the plan and spec projects you work on? Q12. In what types of situations might you suggest changes to the equipment or design specified in a plan and spec project? a. How often does that happen? b. Who do you make those recommendations to? A general contractor? The building owner? c. How receptive are they, typically, to your suggestions? Q13. How do you work with distributors on a plan and spec project? [IF NEEDED] What, if anything, do they do beyond providing pricing and filling the order for the equipment? Design/Build New Construction (15 min, start at 0:45) Q14. And f a. What types of customers or types of buildings are more likely to do design/build projects? Q15. What are your most important considerations when you are deciding what type of system to recommend in a design/build project? a. What information do you need to decide what type of system to recommend? b. How do you get that information? c. How do you decide what fuel type to use (gas or electric) when you are designing a system for a design/build project? What might lead you to select an efficient electric option over gas? Q16. Who is involved in designing the system for a design/build project? a. What design capabilities do you have internally, and what would you have to look for outside advice on? Who would you look to for that advice? b. [IF NOT ADDRESSED] What information or advice, if any, would distributors provide? c. [IF NOT ADDRESSED] When would you seek advice from an engineer? How would you find an engineer to help with that? Q17. And what about selecting the specific equipment, once you have settled on a system design: What are your most important considerations in that step? a. What information do you need to select specific equipment types? b. How do you get that information? HVAC Market Actor Profile EcoMetric 47
  5. Page 50 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 50 of 65 Appendix A: Data Collection Instruments c. What role do distributors play in selecting the specific equipment to recommend? Break (5 min, start at 1:00) take a break from looking at the screen for a few minutes. Please be back promptly in five minutes, at [TIME] Poll Question: How frequently do you install equipment that is more efficient than energy code requires in each project type? Project Type Never or almost never Rarely About half the time Often Always or almost always Equipment Replacement - - - - - Plan & Spec New Construction - - - - - Design/Build New Construction - - - - - Energy Efficiency (15 min, start at 1:05) Q18. It looks like people are most likely to install efficient equipment in [DISPLAY AND REFERENCE POLL RESPONSES]. Why is that? Q19. And it looks like people are less likely to install efficient equipment in [REFERENCE POLL RESPONSES]. What prevents you from installing efficient equipment more often in those types of projects? Q20. Beyond project type, in what situations are you more likely to install a system that is more efficient than code? a. Are there certain types of customers that are more likely to install above-code systems? b. Are there certain types of equipment where you are more likely to install above-code options? Q21. When you are recommending equipment, do you always recommend an above-code option? a. [IF NOT] How do you decide when to recommend an above code option? Q22. How does installing a more efficient system compare to a system that just meets code from a business perspective? HVAC Market Actor Profile EcoMetric 48
  6. Page 51 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 51 of 65 Appendix A: Data Collection Instruments a. Are there greater business risks with an efficient system, in terms of things that might reduce the profitability of the installation or reduce customer satisfaction? b. Are there greater business benefits with an efficient system, in terms of things like profits, customer satisfaction, and building relationships? Information Sources (10 min, start at 1:20) Q23. is it to you to be knowledgeable about all the HVAC technologies available and stay up to date on the latest developments? Why do you say that? a. How do you get information about HVAC technologies? b. How easy or difficult is it to find the information you are looking for on HVAC technologies? What types of information are harder to find? Q24. And what about technical questions: What did you do the last time you were in the field and a question came up, for example troubleshooting a technical issue? a. Is that what you would typically do in that situation? If not, what would you typically do? b. How often does that kind of situation come up? Q25. Finally, what kinds of continuing education opportunities do you find the most valuable? a. How easy or hard is it to find those types of opportunities? Q26. you think the commercial HVAC market is likely to change going forward as a result of the pandemic. Thank you very much for your time. This discussion has given us a lot of great information that will help inform future efficiency program designs. We will send your gift cards to the email addresses we have been using to communicate with you in the next few days. Contractor Interview Screener and Guide Screening Hello, my name is [NAME], calling from Schlesinger Group on behalf of EcoMetric Consulting and the EcoMetric is interviewing commercial HVAC contractors to learn more about your work. You may have received an email from the Department regarding this research. The information we gather will help the Department and Minnesota electric and gas utilities design programs that more effectively work with HVAC contractors. We expect the interview to take about 45 minutes, and EcoMetric will provide an electronic gift card for $150 in appreciation of your time and input. Would you be interested in being part of that type of discussion? HVAC Market Actor Profile EcoMetric 49
  7. Page 52 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 52 of 65 Appendix A: Data Collection Instruments [If yes, continue to screener. If refusal, thank them for their time.] [If concerned about legitimacy:] If you have questions about the study, you can reach out to Laura Silver at the Minnesota Commerce Department at [email removed]. Background/Screener [If interested in participating:] Great, before I schedule a time for our interviewer to call you, I have a few short questions to make sure you would be a good fit for our research. [ASK ALL] S1. Roughly what proportion of the HVAC systems your company installs are each of the following types? a. Residential b. Commercial, 25 tons or less [IF LESS THAN 20%, GO TO TERMINATION SCRIPT] c. Commercial, greater than 25 tons [ASK ALL] S2. Thinking a. Maintenance b. Repairs c. Replacement of existing equipment [IF NEEDED: IF THEY ARE MOSTLY A MAINTENANCE/REPAIR SHOP] d. New construction or major renovations [IF REPLACEMENT + NEW CONSTRUCTION < 20%, GO TO TERMINATION SCRIPT] [ASK ALL] S3. What is your role in a typical small-to-medium, meaning 25 tons or less, commercial HVAC installation project? a. Sales [PROCEED TO S5] b. System design/specification [PROCEED TO S5] c. Installation [PROCEED TO S5] d. Reception only no decision role [PROCEED TO S4] e. Other with no decision role [PROCEED TO S4] [IF NOT INVOLVED IN SMALL COMMERCIAL DECISION-MAKING] S4. We would like to speak with people who are closely involved in decisions around which types of HVAC equipment are installed in commercial projects and how that equipment is installed. Is HVAC Market Actor Profile EcoMetric 50
  8. Page 53 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 53 of 65 Appendix A: Data Collection Instruments there someone in your company involved in sales or installation for small-to-medium commercial projects that we could speak with? a. Yes [Ask to speak with that person and return to introduction; if not available, leave message and record contact information] b. No [GO TO TERMINATION SCRIPT] [IF INVOLVED IN SMALL COMMERCIAL DECISION-MAKING] S5. How many employees does your company have across all its locations? a. [NUMERIC RESPONSE] [IF INVOLVED IN SMALL COMMERCIAL DECISION-MAKING AND SIZE/GEOGRAPHY QUOTA NOT FILLED] S6. you. As a reminder, the questions generally take about 45 minutes. [Schedule and record interview time] Termination people who work in specific roles in commercial HVAC installation. We regret that our current study is not a good match for you. Thank you very much for taking the time to speak with me today. Interview Lead-in Thanks for taking the time to talk with me. understand the small commercial HVAC business so they can more effectively work with contractors. Our focus will be on the decisions that go into a typical small-to-medium commercial HVAC installation, and by small-tobusiness. Do you have any questions before we begin? I written report in a way that would identify individual respondents. Q1. First of all, please describe how Covid-19 has impacted your business? [Note: Keep this section short and focused on current status] a. [PROBE] Did the type or volume of projects you work on change, both in the beginning of the pandemic and now? Please explain. HVAC Project Decision-Making Thanks, now I would like to learn about how things work under normal (non-pandemic) circumstances. HVAC Market Actor Profile EcoMetric 51
  9. Page 54 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 54 of 65 Appendix A: Data Collection Instruments Q2. First, please tell me about what a typical day is like for you. a. How much does the structure of your day vary? b. What is the most rewarding thing you do on a day-to-day basis? c. What aspects of your day-to-day work are the most challenging or frustrating? Q3. Please walk me through the path from HVAC system decision, to purchase, to installation for a small-to-medium commercial project. a. [If not answered in Q2] At what point in that process do you typically come in? b. How is this path different based on the size of HVAC system? What about new construction vs. replacement? [Probe for if/how key decisions are different for different size projects] Q4. On what proportion of your small commercial HVAC installations is the system design already done by the time you come onto the project? Enter numeric value ____% a. In those cases, who designs the system? b. In those cases, do you have an opportunity to suggest changes to the system if you feel there is a better solution? i. How frequently do you make suggestions? c. Please describe the types of customers or projects that are most likely to design the system before bringing in the installer? d. [If not addressed] other projects where the system is designed before you are involved? Q5. On what proportion of your small commercial HVAC installations is your firm in charge of designing the system? Enter numeric value ____% a. system. [If multiple project types (e.g., design/build new construction and replacement), probe on each in follow-up questions] b. In those cases, who specifically, including people at your company, external partners or subcontractors, distributors, or others, is involved in the system design? [List people involved for each type] i. Plan + Spec ii. Design/Build iii. New construction HVAC Market Actor Profile EcoMetric 52
  10. Page 55 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 31 Page 55 of 65 Appendix A: Data Collection Instruments iv. Equipment c. [If they design systems] What factors lead you to design an HVAC system one way rather than another? i. How is the design process different between new construction and equipment replacement? Q6. About what proportion of your small-toan engineer? a. What determines whether a project will need stamping? b. What role, if any, does the engineer play in developing the design? Q7. What proportion of your installations meet code, what proportion exceed code, and for what proportion does code not apply? a. Meet ____% b. Exceed ____% c. Code does not apply ____% d. When does code not apply? Q8. In what situations are you more likely to install a small-to-medium commercial HVAC system that is more energy efficient than code? a. [If needed] Are there certain types of businesses that are more likely to install above-code systems? Certain types of projects? b. Who generally decides whether an HVAC system will be more efficient than energy code requires? What motivates them to choose an above code system? c. How, if at all, does your work change when you are installing a system that is more efficient than energy code requires? Q9. Once the system is designed, what are the most important decisions you make while installing a small-to-medium commercial HVAC project? a. What information do you need to make those decisions? b. Where do you get that information? Q10. What kinds of commissioning and QA/QC happen after the equipment is installed? a. How, if at all, is this documented? Do you report it to anyone? Q11. Who is in charge of the final approval, confirming that the job is done? HVAC Market Actor Profile EcoMetric 53

Text of CLF-011 Attachment 32.pdf

Extracted from the file · 11 pages · 34,299 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)