Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 3, 7, 9, 17

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

Text of ICC-017_Final.pdf

Extracted from the file · 1 page · 1,436 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 8, 2026 ICC-017 Attachment 1 Page 1 of 1 CL&P dba Eversource Docket No. 26-08-02 Order 13 Dated 7/28/2026 Attachment 1 Milestones Apr. 2026 Application submission to tariff review approval Tariff review time only Full timeline1 Tariff review approval to interconnection conditional approval and work order issuance2 Utility notification of completed inspection to meter installation Applications not requiring in-field corrections Applications requiring in-field corrections Meter installation to issuance of the permission to operate Project Phases3 Application submission to interconnection conditional approval Application submission to issuance of the permission to operate Average Business Days May 2026 Jun. 2026 7 8 8 8 8 5 8 8 6 12 52 4 11 51 3 9 46 4 12 10 11 84 79 72 Eversource does not require witness tests, and therefore the length of time for any applicable witness tests is not included in the above metrics. Eversource does not record time stamps for payment processing dates, and therefore the length of time to process payments when applicable is not included in the above metrics. The overwhelming majority of payments received are credit card payments, which are recorded on the application the same day they are completed. 1 The full timeline is inclusive of time associated with application correction requests and resubmissions. Eversource issues the work order number with the interconnection conditional approval notice. Therefore, the length of time to receive the work order number needed to apply for permits from cities and towns is included in the interconnection conditional approval metric. 3 Project phase timelines are inclusive of all steps, including installation timeline and any delays not associated with the interconnection process that may have affected the overall timeline. 2

As listed on the current system

Question(s) Answered 3, 7, 9, 17 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/21/2026

This filing on the current system (opens in a new tab)