Interrogatory responses
Answers to questions 3, 7, 9, 17
Files5
ICC-003_Final.pdf
PDF · 128 KB · 1 pageText searchable
Download ICC-003_Final.pdfRead the text of ICC-003_Final.pdf
ICC-007_Final.pdf
PDF · 85 KB · 1 pageText searchable
Download ICC-007_Final.pdfRead the text of ICC-007_Final.pdf
ICC-009_Final.pdf
PDF · 149 KB · 2 pagesText searchable
Download ICC-009_Final.pdfRead the text of ICC-009_Final.pdf
ICC-017_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download ICC-017_Final.pdfRead the text of ICC-017_Final.pdf
ICC-017 Attachment 1.pdf
PDF · 1.2 MB · 1 pageText searchable
Download ICC-017 Attachment 1.pdfRead the text of ICC-017 Attachment 1.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-003 Page 1 of 1 Date Filed: September 21, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-1. Are any of the Eversource Interconnection Policies joint documents with United Illuminating? If so, state which ones and explain the timeline and purpose for which the document(s) were integrated. Response: The Company and the United Illuminating Company (“UI”) maintain three joint, PURA-approved interconnection documents: 1. Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or less. (Docket No. 03-01-15RE04; current version dated April 11, 2025). 2. Guidelines for Generator Interconnection Agile Fast Track and Study Processes (Docket No. 17-12-03RE06; current version dated September 1, 2026). 3. Exhibit B Generator Interconnection Technical Requirements; current version April 11, 2025. The Company and UI have jointly developed and maintained PURA-approved interconnection guidelines, developed through stakeholder working groups, since PURA’s April 21, 2004, Decision in Docket No. 03-01-15, which implemented Public Act No. 03-135’s directive that PURA review and adopt statewide generation interconnection protocols, including applicable IEEE standards, so that both EDCs apply uniform, nondiscriminatory interconnection procedures to distributed generation.
Text of ICC-017 Attachment 1.pdf
Extracted from the file · 1 page · 1,941 characters
As listed on the current system
Question(s) Answered 3, 7, 9, 17 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/21/2026