Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 6 thru 7

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-02 Date Issued August 28, 2026 AMTRAK-006 Page 1 of 1 Date Filed: September 10, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: National Railroad Passenger Corp. (Amtrak) Question: Identify the origin and purpose of the hard-coded adjustments of 193.09 and 2.67 (reported in $000s) included in cell F47 (Current Revenue for Rate 58) of Exhibit CLP-RATES-2.3. Provide all supporting calculations, source documents, and workpaper references supporting these adjustments. Response: The purpose of the hard-coded adjustments of 193.09 and 2.67 (reported in $000s) included in cell F47 (Current Revenue for Rate 58) of Exhibit CLP-RATES-2.3 is to reconcile the difference between the projected RDM and ESI Rate Year revenue at current rates included in Schedule C3.1 with the actual calculated RDM and ESI Rate Year revenue in Exhibit CLP-RATES-2. Due to the timing of when the Rate Year billing determinants data was available when completing the filing, Exhibit CLP-REVREQ-2, Schedule C-3.1 used estimated billing determinants for the purposes of calculating the RDM and ESI Rate Year revenue at current rates. However, ExhibitCLP-RATES-2 has the finalized Rate Year billing determinants. In addition, the estimated ESI Rate Year revenue was calculated using a c/kWh average rate for each rate class rather than incorporating demand charges as the Company did not have information on demand billing determinants at that time. Therefore, the adjustments were included to reconcile the difference between the two Exhibits. AMTRAK-006, Attachment 1, shows the calculation of these adjustments for each effected rate class. A revised Exhibit CLP-RATES-2 and Exhibit CLP-REVREQ-2, Schedule C-3.1 will be provided along with the Company’s next cost of service update.

As listed on the current system

Question(s) Answered 6 thru 7 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/10/2026

This filing on the current system (opens in a new tab)