Interrogatory responses
Answers to questions 8, 9
Filed by Connecticut Light and Power Company dba Eversource Energy2 files
Part of docket 26-05-10Files2
AMTRAK-008_Final.pdf
PDF · 102 KB · 1 pageText searchable
Download AMTRAK-008_Final.pdfRead the text of AMTRAK-008_Final.pdf
AMTRAK-009_Final.pdf
PDF · 133 KB · 3 pagesText searchable
Download AMTRAK-009_Final.pdfRead the text of AMTRAK-009_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-008 Page 1 of 1 Date Filed: September 23, 2026 Witness: Amparo Nieto Request from: National Railroad Passenger Corp. (Amtrak) Question: Explain the derivation of the minimum system classification factors for overhead and underground transformers shown in Table 1 of Exhibit CLP-ACOS-1. Specifically, identify the assumed minimum transformer sizes, average transformer sizes, installed costs, and the treatment of excavation, restoration, and other installation costs used to calculate the customer-related percentages of 42.9% for overhead transformers and 19.1% for underground transformers. Response: The Minimum System Study was conducted by the Company using inventory from the Company’s Continuing Property Records (“CPR”) found in the Asset Management module in PowerPlan. The analysis included, as a starting point, the original cost of all construction of overhead and underground transformers installed. All original cost dollars were brought into year 2025 dollars and added up separately for Overhead (“OH”) and Underground (“UG”) transformers, by applying the corresponding Handy-Whitman index. Next, a minimum cost for transformers was calculated, in 2025 dollars. The minimum system represents the minimum size that must be installed for an interconnecting customer before the Company accounts for the customer’s expected demand. The Company determined the minimum cost, in year 2025 dollars, using the cost of a 1-phase Overhead 25 kVA transformer as a measure of the minimum size. The cost of this minimum sized transformer, stated in 2025 dollars, was multiplied by the number of OH transformers currently in service to provide the total customerrelated share of OH transformers. These costs, divided by the total costs of OH transformers (in 2025 dollars) results in the customer-related portion of 42.9%. The remaining cost represents the demand-related portion of the OH transformers. The same exercise was performed for UG transformers, which results in a customer-related share for all UG transformers in service of 19.1%. Detailed information on original costs, size of the transformer costs in the inventory, and HandyWhitman update calculations are included in CIEC-019, Attachment 1.
As listed on the current system
Question(s) Answered 8, 9 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026