Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 108, 110, 113

Files3

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-04 Date Issued September 28, 2026 NECTA-108 Page 1 of 1 Date Filed: October 09, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: Reference the Written Exceptions of the Connecticut Light and Power Company d/b/a Eversource Energy dated April 25, 2022, in Docket No. 19-01-52RE01, please discuss whether, under Eversource’s proposal, existing or prospective municipal attachers would be allocated a share of non-billable make ready costs when a pole replacement is required. Response: Yes, Eversource’s proposal states that “if there are no unauthorized attachers, then all entities attached to the pole plus the new attacher should equitably share in the cost to fix it.” PURA will determine whether the terms “all entities” and “new attacher” include municipal attachers, however, the Company’s language is designed to encompass all attachers. PURA may decide to determine this issue in a new docket to, among other things, investigate modifications to the current cost allocation methodologies. Please refer to Docket No. 19-01-52RE01, September 9, 2026, ruling on Motion No. 044.

As listed on the current system

Question(s) Answered 108, 110, 113 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)