Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 15 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 15 of 104 Work Order Number Description 80182383 PR7/7 JCF - (50): JC/14 5 1/2 MILE 80182435 *HAWKEYE* WQ-CD01570-LEANING REJECT 80182500 *D&D*KA - Conv. 1230459 - Make Read 80182648 MRP - 13H95-13H92 Load Swap - OH RO 80182658 MCB - 791 COLEMAN RD, 11 LOT SUB DI 80182705 *HAWKEYE* WQ-CD01570-LEANING REJECT 80182837 CD01261-(2023 AIMS Seg 08, Part 01 80182883 3/21 1850::OLD SPRINGFIELD:RD::STAF 80182884 PRI DB CABLE LEDGEWOOD DR BROOKFIEL 80182937 *HAWK* CD01570 - Leaning Pole Repla 80182959 CD01570 - Leaning Pole Replacements 80183019 TO STORES 4/6/23--WRITTEN CREEK ( 3 80183055 CD01570 - Leaning Pole Replacements 80183126 *HAWK* CD01570 - Leaning Pole Repla 80183162 *HAWK* CD01570 - Leaning Pole Repla 80183180 15 DAY DUE 6/27/22; LEBANON, pic GA 80183198 *ASP* CD01570 - Leaning Pole Replac 80183209 FRONTIER POLE / WTBS - EM PLANNER ( 80183212 *ASP* CD01570 - Leaning Pole Replac 80183226 PD-369 OCEAN AVE N. LONDON/NEW OH S 80183250 15 day due 9/14 Jpt-155 Pine St Bri 80183267 *ASP* CD01570 - Leaning Pole Replac 80183541 JO-Conv#1195271-MakeReadyNonReimb-M 80183551 MR; REPLACE VISE TOPS, ADD STUB POL 80183633 COMP (ASP) JMS- WEST HARTFORD N. MA 80183644 COMP (ASP) JMS-WEST HARTFORD NORTH 80183745 4/4 JFC - SHARON, WOODS RD 2, 106, 80184401 JDB 3/23: 9A- 23 VAN BUREN AVE, NOR 80184441 westbrook,7 pequot park rd/new 3ph 80184463 (*) TELCO TO BE SET - WINDSOR, WIND 80184604 GC - PRESTON, ROUTE 12, 54 80184629 BF-E HTFD, 56 FARM DR - REPL vault 80184631 MUNI/MTR PENDING BF-EAST HARTFORD, 80184637 FCOMP, HTF_SS BF-E HTFD, 301 MAY Rd 80184638 *ASP* MAR - Leaning Pole P#3805 - 9 80184639 MM 275 N Society Rd new pole set 50 80184693 print 2/10 JSG/Burlington--Main St. 80184719 MCB - 104 FERNWOOD DRIVE, CHESHIRE, 80184799 HOLD CUST Pr CRP-112 Weigold rd WIN 80184963 *D&D*Frontier Inspection Pole Shift 80185165 MG-P#1587-CANTERBURY, WATER (559)-I 80185173 *D&D*Frontier Inspection Pole Shift 80185233 *D&D*Conv. 1635931 - Make Ready Rei 80185298 SENT TO CHE 1-24-25 MR#1735456 P279 80185403 APPRENTICES KTI MPB; 96 ROUND LAKE 80186610 *Hawkeye* MAR - Leaning Pole P#463 80186632 *D&D* -Conv#1179679-MakeReadyNonRei 80186653 *ASP* MAR - Leaning Pole P#3205- 69 80186666 MCB - 3/22 P#5680 BALDWIN AVE, WATE 80186980 10/29/24 9A CAR VS POLE PRATT( 80187101 AE/SC: 15 VALLEY RD GRN, 200A OH TO 80187171 MM 24 Bassett Mills Rd new pole #21 80187224 CD02564 Segment 7 Minor Storm MN24A 80187241 CD02564 Segment 8 (8/18/24) (Klarid 80187271 CD02564 Segment 6 Emergency Declara 80187273 MATERIAL WTG FOR 9A TO CLOSE 1/17/ 80187276 CD02564 Segment 6 Emergency Declara 80187283 CD02564 Segment 6 Emergency Declara 80187288 CD02564 Segment 6 Emergency Declara 80187438 WTG FOR PD RPT 12/6/24 (TH) CRP 9A 80187454 PRINT JFC - BETHLEHEM, NONNEWAUG, 1 80187471 DG P#4633 EASTFORD RD WOODSTOCK FRN 80187519 DONE WTG on CUST Print JFC - MORRIS 80187575 APPT 10/08 *MLC* AP-4 HILLTOP RD, F 80187718 AE/JLB 39 HILLTOP AVE STMFD 200A OH 80187743 DG UPGRADE FOR NEWINGTON, ADRIAN, 1 80187753 RL;20 IDAR CT.GRN:REPLACE P 422 40/ 80187915 AMM 54 WOLCOTT ST, BRISTOL. REMOVE 80187917 10/31/24 - 9A - Liberty St / RUSSEL 80187927 *D&D*KG Conv#1653938-RegularMakeRea 80187977 LLYNWOOD DR., VERNON - RPLC'D BROKE 80188010 JFC - 08/24 (RSO - CROWLCJ) JACKSON 80188111 CD02465, Segment 1, SED, P.6979 Riv 80188169 BC - CD02416 Cheshire 2025 Overload 80188368 15D 8/13 JRP - 15 E Summer St SOG I 80188443 *D&D*JS - Conv. 1635828 - Make Read 80188444 *D&D*JS - Conv. 1635828 - Make Read 80188462 11/01/24--VELGOUSE RD. MONTVILLE- P 80188466 TURNOVER E# 5528369 11.02.24 BERKS 80188487 DONE PRINT CRP-122 Shore Dr, WIN, r 80188493 9A - 11/2 - RSO - [RIVERA] - VINE( 80188508 DG P#24 GROVE ST PUTNAM FRNTR POLE 80188641 BJQ - DONE 11/3/24 - ROTTEN POLE -80188678 EVW - 11/2/24 JORAY (29) RD -- S867 80188684 TL - PENNSYLVANIA AVE, #108 NIANTIC 80188687 OK to close 9A - 11/2 - RSO - [KELL 80188706 9A 11/1 (JEZOUKM) BRANDY( 21) ST -80188901 PD-8 POINT COMFORT WTFD/NEW UG SVC 80189114 11/4 9A CAR VS POLE - ROUTE 163(109 80189118 JDB 158 OLD REDDING RD REDDING, SHI 80189149 PM-367 WESTFIELD RD MERIDEN-POST CO 80189216 DONE PRINT JFC - priority reject -4 80189279 VALID--DG P#270 WOLF DEN RD POMFRET 80189312 327 Whitfield St, GF- Upgrade XFMR, 80189417 **MM - 1041 PONUS RDG, NEW CANAAN 80190911 9A - OAC-FAIRFIELD & W PRESTON HTFD 80190920 1/7 nonbillable - low wires...vVALI 80190925 9A Cypress Dr, Stm 80190929 WRTN - DM - 169 MIDDLE HADDAM RD EA 80191016 RC POLE 78 INSTALL NEW OH SERVICE a 80191137 CAR VS POLE - APPROVED 1/2/26 80191172 DL; 800 LONG RIDGE RD; 400AMP 3PH 1 80191177 DL; 800 LONG RIDGE RD; 400AMP 3PH 1 80191439 9A - CAR VS POLE 23 - APPROVED 7/16 80191440 11/06/24 - 9A - (RSO Herman, Lemieu in-service date work order type 7/14/2022 11 Elect Annual Proj - DESG CT 6/7/2022 11 Elect Annual Proj - DESG CT 2/1/2023 11 Dist Capital or Expense 6/22/2022 11 Elect Annual Proj - DESG CT 9/28/2022 11 Elect Annual Proj - DESG CT 6/7/2022 11 Elect Annual Proj - DESG CT 6/27/2025 11 Dist Capital or Expense 4/8/2022 11 Elect Annual Proj - DESG CT 7/27/2023 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 5/11/2022 11 Elect Annual Proj - DESG CT 12/8/2022 11 Elect Annual Proj - DESG CT 5/11/2022 11 Elect Annual Proj - DESG CT 7/6/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 7/20/2022 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 7/25/2023 11 Damage Claims OH 4/21/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 12/15/2022 11 Elect Project - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/15/2022 11 Elect Annual Proj - DESG CT 8/30/2022 11 Damage Claims OH 10/7/2022 11 Elect Annual Proj - DESG CT 1/18/2024 11 Damage Claims OH 1/17/2023 11 Temporary Work DESG CT 10/26/2023 11 Elect Annual Proj - DESG CT 10/31/2024 11 Elect Annual Proj - DESG CT 8/24/2023 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 10/20/2022 11 Elect Annual Proj - DESG CT 3/9/2023 11 Elect Annual Proj - DESG CT 6/27/2022 11 Elect Annual Proj - DESG CT 10/16/2025 11 Dist Capital or Expense 12/5/2024 11 Elect Annual Proj - DESG CT 3/13/2025 11 Corrective Maint UG Svc 12/5/2024 11 Elect Annual Proj - DESG CT 4/21/2025 11 Dist Capital or Expense 1/10/2025 11 Dist Capital or Expense 12/1/2022 11 Elect Annual Proj - DESG CT 6/23/2022 11 Elect Annual Proj - DESG CT 11/10/2022 11 Elect Project - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 3/28/2022 11 Elect Annual Proj - DESG CT 11/8/2024 11 Damage Claims OH 3/8/2025 11 Corrective Maint UG Svc 3/11/2025 11 Dist Capital or Expense 11/12/2024 11 Asset Mgmt - Specific DESG CT 11/22/2024 11 Asset Mgmt - Specific DESG CT 10/31/2024 11 Elect Annual Proj - DESG CT 1/23/2025 11 Damage Claims OH 10/30/2024 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 12/12/2024 11 Dist Capital or Expense 12/4/2024 11 Elect Annual Proj - DESG CT 2/11/2025 11 Dist Capital or Expense 6/27/2025 11 Corrective Maint UG Svc 10/9/2025 11 Corrective Maint UG Svc 8/8/2025 11 Corrective Maint UG Svc 1/16/2025 11 Elect Annual Proj - DESG CT 3/24/2025 11 Elect Annual Proj - DESG CT 12/5/2024 11 Elect Annual Proj - DESG CT 11/21/2024 11 Damage Claims OH 8/21/2025 11 Dist Capital or Expense 2/4/2025 11 Elect Annual Proj - DESG CT 11/4/2024 11 Elect Annual Proj - DESG CT 12/26/2025 11 Asset Mgmt - Specific DESG CT 2/27/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 5/16/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 1/24/2025 11 Elect Annual Proj - DESG CT 11/5/2024 11 Elect Annual Proj - DESG CT 1/16/2025 11 Corrective Maint OH Svc 10/7/2025 11 Damage Claims OH 2/11/2025 11 Dist Capital or Expense 11/13/2024 11 Dist Capital or Expense 12/5/2024 11 Elect Annual Proj - DESG CT 7/8/2025 11 Dist Capital or Expense 11/25/2024 11 Damage Claims OH 4/11/2025 11 Dist Capital or Expense 2/14/2025 11 Elect Annual Proj - DESG CT 1/23/2025 11 Dist Capital or Expense 2/4/2025 11 Dist Capital or Expense 11/12/2024 11 Dist Capital or Expense 11/20/2024 11 Elect Annual Proj - DESG CT 12/9/2024 11 Elect Annual Proj - DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Elect Annual Proj - DESG CT 1/5/2025 11 Dist Capital or Expense 4/22/2025 11 Damage Claims OH 12/2/2024 11 Damage Claims OH 12/4/2024 11 CT Betterment 4/11/2025 11 Corrective Maint OH Svc 1/15/2025 11 Damage Claims OH 12/18/2024 11 Elect Annual Proj - DESG CT 1/17/2025 11 Temporary Work DESG CT 6/18/2025 11 Damage Claims OH 1/28/2025 11 Damage Claims OH Subsequent Close Date 7/17/2026 3/21/2026 9/16/2026 2/13/2026 2/13/2026 1/22/2026 2/13/2026 7/17/2026 6/26/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 8/26/2026 2/13/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 364310 Poles and Appurtenance 196 8,437 172 145,550 219 447 116,368 297 2,838 8,018 3,504 1,348 3,212 5,285 3,134 1,308 3,881 1,237 3,265 2,364 857 240 1,119 9,371 1,158 5,713 1,400 893 (1,626) 58 (56) 4,331 436 2,098 1,290 10,485 855 1,549 6,336 653 15 793 1,223 11,308 7,823 5,282 1,464 4,687 2,434 7,562 4,123 3,815 235,880 295,361 1,310 12,825 5,731 19,509 15,311 15,980 2,836 1,941 4,240 110 266 (224) 6,737 10,670 9,958 11,108 10,473 1,062 2,151 4 4,228 4,540 4,182 1,511 1,592 8,535 1,410 10,755 2,982 1,208 3,926 4,318 4,016 3,841 9,703 479 5,573 2,393 9,723 124 122 3,794 9,826 3,650 4,259 251 8,068 3,296 (818) 3,429 5,719 365000 Overhead Conductors, Device 834 4,403 172 34,779 1,198 170 296,534 372 2,175 2,762 489 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 172 8,268 17,794 679 39 116,325 25,732 5 0 1,787 1,027 322 1,082 497 816 0 273 3,215 1,036 394 2,183 166 2,104 3,418 2,651 944 163 (446) 454 (276) 3,454 1,407 5,594 113 8,686 91 24,524 255 139 362 500 1,522 2,214 1,060 654 547 52 232 4 1,005 3,933 917 (248) (89) 9,344 3,639 13,885 (84) 1,007 332 1,532 1,333 47,042 7 2,737 427 895 (1) 259 3,264 424 914 8 60 143 1,015 61 3,524 373 2,174 103,834 11,340 70 9,119 3,710 69,368 83,850 1,656 1,321 174 1,552 223 707 (964) 3,964 17,617 4,466 1,695 89 39,623 1,659 27,310 1,349 42,043 2,141 361 684 164 52 152 (286) 164 5,675 9,628 3,695 215 905 376 (1,492) 346 200 1,138 1,058 5,185 40,304 4,158 2,906 985 2,131 882 4,477 690 1,817 290 367 9,048 4,096 452 123 2,714 1,881 665 388 1,048 5,092 1,957 777 767 2,414 2,274 190 8 49 403 211 603 286 1,790 859 77 600 661 1,031 222 1,021 258 366 404 7,352 269 1,112 4,938 594 (259) (426) 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,030 12,840 517 180,329 27,479 617 413,581 708 147,071 10,779 3,993 1,353 4,998 6,312 3,456 3,205 4,378 1,237 3,538 6,520 4,126 240 1,517 11,475 4,576 9,373 6,277 1,055 (1,403) 512 (506) 18,137 7,147 23,109 1,403 69,477 946 1,549 32,631 907 222 1,155 1,723 12,830 14,828 6,340 2,438 4,687 5,958 7,562 5,273 6,845 383,411 337,633 1,380 66,128 9,441 88,876 99,521 17,636 4,841 2,115 6,302 584 2,264 (1,474) 11,923 10,670 27,575 20,759 12,168 1,062 43,247 4,169 7,469 5,524 6,314 2,393 8,261 10,294 1,410 12,572 3,272 1,652 14,235 8,413 4,469 4,995 12,639 3,381 6,238 2,780 10,771 5,840 9,835 3,794 15,771 19,328 7,953 1,060 8,974 3,672 (2,994) 3,429 5,719
  2. Page 16 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 16 of 104 Work Order Number Description 80191554 WRTN--JK>POLE 2758--REPL POLE WITH 80191627 TO STORES 4/28/25-MG-P#2257 & P#325 80191660 HARTFORD, LINCOLN, 17, 80191691 MG-P#528 - BROOKLYN(289) RD -CANTER 80191906 OLD SAYBROOK, OLD SEA LN//REPLACE P 80191916 CRP - /11/7 [BOISCBP] - BEACH ROCK( 80191934 FCOMP RSO? 11/5 TROUT BROOK( 1296) 80191940 CD02485, P2494, Walnut St, Naugatuc 80191943 KTI MPB; 144 BACON POND RD, WOODBUR 80191962 OLD SAYBROOK, PETTIPAUG, 15/INSTALL 80191969 POLE IS SET - SC: EM: 53 HILLCREST 80191978 VERIZON POLE IS SET RL: ZACCHEUS ME 80192043 CD02417, SEGMENT 1, JWM OVLD STEPS 80192091 FRONTIER POLE IS SET AE/DL; 08.28.2 80192118 Middlesex Dr 11, Enfield 9A P-18063 80192128 CD02417, SEGMENT 3, JWM OVLD STEPS 80192324 *D&D*Conv. 1646947 - Make Ready Non 80193027 *****ALL WORK COMPLETE*****11/09/24 80193028 9A - CAR VS POLE - APPROVED 6/12/20 80193032 AE/JLB 86 SAINT CHARLES AVE STMFD R 80193043 CAR VS POLE - APPROVED 2/3/26 80193047 ALL WORK COMPLETE. Storrs Rd 940, M 80193049 Print WQ/LITCHFIELD, NORFOLK, 112, 80193051 (em) ZK - WIN (9a) - 740 PALISADO A 80193062 RC REPLACE POLE 2114 & UPGRADE OH S 80193091 JDB 153 REDDING RD REDDING POLE 104 80193099 JDB 11/19/24 PD REPORT ENTERED 11/8 80193136 CAR VS POLE - NO PR FOUND: NON-BILL 80193222 PM-534 KENSINGTON RD BERLIN-POST CO 80193239 11/11- TURNOVER- VELGOUSE RD. MONTV 80193241 JFM-3P EXTENSION -239 WOLCOTT RD WO 80193284 RM, 10 HARBOR VIEW AVENUE - NORWALK 80193303 HADDAM - ALL WORK COMP - REM TREE/ 80193340 11/7/24 COMMUNITY HOUSE (141) RD -80193346 *ASP* CD02444 Pole Integrity Replac 80193383 DJM. AWC COMPLETED 4 SIDE HILL RD, 80193392 MPB; 110 LOWER FISH ROCK RD, SOUTHB 80193395 *D&D*Conv. 1646117 - Make Ready Rei 80193400 RM- CP - 9 COVEWOOD DR -, NORWALK! 80193410 11/09/2024 E# 5531649 55 SPRING LA 80193422 *ASP* CD02444 Pole Integrity Replac 80193447 BJQ - 11/09/2024 E # 5532548 TORR 80193457 *ASP* CD02444 Pole Integrity Replac 80193470 JRP - Rosemont Ave SOG Repl P#47 an 80194915 PRINT BJQ - WEST CORNWALL, COLLEGE, 80194967 JOB IS DONE VJT - 9A - CHERRY ( 445 80195059 ***DATTCO*** MR***LONG LED PAD FOR 80195146 *D&D* 3PA Non-Billable Convo# 17033 80195147 *ASP* CD02444 Pole Integrity Replac 80195243 *ASP* CD02444 Pole Integrity Replac 80195259 MM 12 Moosup Pond Rd Plainfield P#1 80195274 pre 80195280 *ASP* CD02444 Pole Integrity Replac 80195285 MM 9A 145 Mell Rd Lisbon Frontier p 80195315 *ASP* BD - Conv. 1709034 - Make Rea 80195317 work completed in field - TUROVER 9 80195324 *ASP* CD02444 Pole Integrity Replac 80195363 *ASP* CD02444 Pole Integrity Replac 80195409 *ASP* CD02444 Pole Integrity Replac 80195448 CAR VS POLE - APPROVED 2/6/2026 80195460 *ASP* CD02444 Pole Integrity Replac 80195484 11/13/24, 9A, JK>POLE 444S--REPLCD 80195651 JDB 170 PICKETTS RIDGE REDDING, REP 80195684 11/13/24 Miller Rd Preston Pole 183 80195698 CAR VS POLE - APPROVED 12/17/25 80195727 BOLTON, BOLTON CENTER, 180, New OH 80195744 JTR, 67 Day Hill Rd, Windsor, Repla 80195762 EM TM RE ASBUILT 5/23/25 (TH) 9A 80195776 JTR, 715 Day Hill Rd, Windsor, Repl 80195858 *ASP* CD02444 Pole Integrity Replac 80195909 *HARTFORD AWC* CD02444 Pole Integri 80195915 apprentice 1.7.2025 kti RC REPLACE 80195927 WM; WASHINGTON, ROSSITER, 7, BRANDO 80195936 *ASP* CD02444 Pole Integrity Replac 80195956 *ASP* CD02444 Pole Integrity Replac 80195968 *D&D*Conv. 1646125 - Make Ready Non 80195972 *ASP* CD02444 Pole Integrity Replac 80195991 *ASP* CD02444 Pole Integrity Replac 80196015 *ASP* CD02444 Pole Integrity Replac 80196029 *HARTFORD AWC* CD02444 Pole Integri 80196055 Raffia Rd 199, Enfield RSO. 11/12 P 80196131 *ASP* CD02444 Pole Integrity Replac 80196362 DONE? PR6/8 POLE IS SET MDB- WAMOGO 80196373 7 80196463 MR; ***WRITTEN***Middletown_Freeman 80196475 DONE ASPLUNDH VJT - WATERTOWN, ECHO 80196701 AWC - JRP - Greenlawn Ave NEWINGTON 80196711 AWC - PM-652 WILLARD AVE NEWINGTON80196716 15DD 12/19 JFM-NEW OH SVC- 91 ALLEN 80196731 CD02463 Overload Step Xfmr P4078 Wi 80196734 PRINT CRP-230 Spencer Hill rd WIN, 80196737 WTG FOR 9A TO CLOSE 9/17/25 (TH) 9A 80196760 MPB; 84 Quanopaug Trail Woodbury, R 80196776 CD01429-01 254 PUTNAM RD POMFRET FR 80196884 PRINT JFC - INT-99092 WO# 19378962 80196939 PM-MAIN ST BERLIN-P#47744 WAS REPLA 80196978 AWC-AP- 48 High Ridge Dr, Newington 80196979 AWC- AP- 274 Main St Newington - Sh 80197024 JMS- SIMSBURY SAND HILL RD 80197059 *WTBY AWC*SD- 80 TURNPIKE DR BLDG 2 80197066 *D&D*Conv. 1646930 - Make Ready Non 80197080 Print BJQ, LTCH, P #1557 (49) MILTO 80197099 PD-43 WEST HIGH ST N. LONDON/DG UPG 80197111 JFM-DG UPGRADE- 5 LYNN AVE (P#2631) 80197128 *ASP* CD02444 Pole Integrity Replac in-service date work order type 8/14/2025 11 Dist Capital or Expense 3/13/2025 11 Elect Annual Proj - DESG CT 4/3/2025 11 Private Work - No Co Asset 11/13/2024 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 1/24/2025 11 Dist Capital or Expense 4/4/2025 11 Dist Capital or Expense 5/28/2025 11 Asset Mgmt - Specific DESG CT 2/26/2025 11 Corrective Maint OH Svc 3/26/2025 11 Elect Annual Proj - DESG CT 1/6/2025 11 Dist Capital or Expense 1/6/2025 11 Dist Capital or Expense 2/20/2025 11 Asset Mgmt - Specific DESG CT 7/15/2025 11 Dist Capital or Expense 12/4/2024 11 Damage Claims OH 5/29/2025 11 Asset Mgmt - Specific DESG CT 4/7/2025 11 Dist Capital or Expense 12/29/2024 11 Elect Annual Proj - DESG CT 11/15/2024 11 Damage Claims OH 8/19/2025 11 Corrective Maint OH Svc 11/15/2024 11 Damage Claims OH 2/8/2025 11 Damage Claims OH 11/25/2024 11 Temporary Work DESG CT 12/19/2024 11 Dist Capital or Expense 6/20/2025 11 Corrective Maint OH Svc 5/8/2025 11 Dist Capital or Expense 12/11/2024 11 Damage Claims OH 2/25/2025 11 Damage Claims OH 11/18/2024 11 Dist Capital or Expense 3/13/2025 11 Elect Annual Proj - DESG CT 11/14/2024 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 12/3/2024 11 Elect Annual Proj - DESG CT 4/24/2025 11 Dist Capital or Expense 1/15/2025 11 Elect Annual Proj - DESG CT 1/29/2025 11 Dist Capital or Expense 5/16/2025 11 Dist Capital or Expense 3/24/2025 11 Dist Capital or Expense 11/13/2024 11 Elect Annual Proj - DESG CT 4/24/2025 11 Dist Capital or Expense 11/14/2024 11 Elect Annual Proj - DESG CT 4/24/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 4/20/2022 11 Damage Claims OH 3/20/2024 11 Elect Annual Proj - DESG CT 1/16/2025 11 Dist Capital or Expense 6/6/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 11/19/2024 11 Elect Annual Proj - DESG CT 4/8/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 11/21/2024 11 Dist Capital or Expense 3/21/2025 11 Dist Capital or Expense 2/10/2025 11 Damage Claims OH 4/3/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense 12/11/2024 11 Damage Claims OH 4/24/2025 11 Dist Capital or Expense 1/23/2025 11 Damage Claims OH 4/2/2025 11 Dist Capital or Expense 2/18/2025 11 Dist Capital or Expense 11/15/2024 11 Damage Claims OH 2/17/2025 11 Dist Capital or Expense 2/7/2025 11 Dist Capital or Expense 2/20/2025 11 Damage Claims OH 2/4/2025 11 Elect Annual Proj - DESG CT 5/13/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 4/1/2025 11 Elect Annual Proj - DESG CT 5/15/2025 11 Corrective Maint UG Svc 6/9/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 8/26/2025 11 Dist Capital or Expense 11/18/2024 11 Elect Annual Proj - DESG CT 6/9/2025 11 Dist Capital or Expense 6/9/2022 11 Elect Annual Proj - DESG CT 5/16/2022 11 Elect Annual Proj - DESG CT 7/14/2022 11 Elect Annual Proj - DESG CT 7/5/2022 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 12/4/2024 11 Elect Annual Proj - DESG CT 10/27/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 9/25/2025 11 Damage Claims OH 1/4/2025 11 Dist Capital or Expense 8/1/2025 11 Elect Annual Proj - DESG CT 9/5/2025 11 Dist Capital or Expense 11/26/2024 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 11/26/2024 11 Elect Annual Proj - DESG CT 7/15/2025 11 Dist Capital or Expense 7/22/2025 11 Dist Capital or Expense 12/4/2024 11 Elect Annual Proj - DESG CT 1/29/2025 11 Elect Annual Proj - DESG CT 3/4/2025 11 Elect Annual Proj - DESG CT 6/9/2025 11 Dist Capital or Expense Subsequent Close Date 2/13/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 9/16/2026 5/15/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/14/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 9/16/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 2/14/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 2/14/2026 2/13/2026 1/22/2026 5/15/2026 1/22/2026 2/13/2026 364310 Poles and Appurtenance 7,363 55 3,136 3,244 5,484 323 733 544 1,171 2,802 5,963 4,991 210 1,907 2,927 483 5,033 1,819 10,268 155 4,838 4,518 255 9,430 2,045 1,573 2,803 8,009 4,244 4,696 3,862 546 22 6,269 11,038 9,835 14,168 849 6,203 6,773 5,360 32,627 4,049 3,208 130 9,243 6,381 7,529 6,702 5,438 2,491 157 5,333 1,289 240 9,251 4,097 6,167 7,246 2,449 4,974 2,145 7,813 242 810 178 22 6,519 287 4,908 9,217 8,820 4,038 7,514 6,644 5,440 7,608 4,846 12,356 9,930 7,224 5,867 1,514 (83) 33 3,640 52 1,071 242 13,407 1,873 15,999 4,006 3,946 7,370 748 57 827 24,470 8,441 39 186 4,161 1,352 3,353 365000 Overhead Conductors, Device 2,746 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 500 418 101 513 84 4,827 810 2,125 12,409 48 783 14,733 748 6,048 1,877 4,900 5,273 1,537 1,492 4,799 17,573 1,762 368330 Equipment Overhead 161 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 1,598 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 9 490 1,087 3,707 5 8 50 2,801 2,021 105 359 154 2,357 179 1,877 2,432 151 2,060 6,112 11,750 1,476 184 987 1,281 3,905 3,612 629 1,419 847 2,821 1,186 563 823 55,243 5,196 1,074 4,972 733 2,720 350 843 1,125 224 1,411 558 7,028 4,983 2,513 1,120 6,715 26 94 226 88 754 479 646 2,414 3,200 1,804 2,556 610 6,310 1,007 4,858 1,553 3,688 2,543 1,692 846 11,776 5,876 24 1,320 1,028 53,596 2,397 1,239 1,624 61,221 4,776 9 158 322 3,551 9,267 (883) 1,203 1,426 1,081 216 5,799 639 963 89 93 1,095 183 2,669 (3) 917 14,567 2,318 1,299 2,822 2,912 254 1,604 3,332 43,327 260 381 112 1,064 2,384 70 451 1,765 29,371 (20) (231) 432 6,456 98 396 43 112 20,915 532 19,584 338 107 387 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 11,868 55 22,970 3,662 5,584 836 817 5,379 2,471 9,721 18,372 5,039 998 16,640 3,675 6,588 6,909 6,719 18,343 3,713 6,435 9,676 409 11,788 2,439 3,450 5,235 8,160 6,304 10,808 22,050 3,075 206 7,256 12,320 14,927 17,963 849 6,832 8,192 6,207 35,448 5,236 3,771 3,619 65,403 27,443 8,604 16,814 6,171 5,212 507 6,176 2,414 464 10,662 4,654 13,195 15,141 5,217 6,094 2,145 14,529 268 904 2,008 3,442 7,273 44,092 5,554 11,891 12,401 7,018 12,455 7,254 11,819 9,066 9,704 13,909 15,383 9,766 7,559 1,514 30,114 11,809 9,286 76 2,391 2,098 67,003 10,868 17,238 5,742 86,082 12,678 757 215 1,149 28,021 37,292 (845) 1,728 5,694 2,820 3,353
  3. Page 17 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 17 of 104 Work Order Number Description 80197153 WO 19264103-INT-100641-DG UPGRADE F 80197201 *ASP* CD02444 Pole Integrity Replac 80197221 *ASP* CD02444 Pole Integrity Replac 80197222 *ASP* CD02444 Pole Integrity Replac 80197305 15d 4/16JRP - 111 Atwater St SOG In 80197485 *ASP* CD02444 Pole Integrity Replac 80197511 SD; M/L/C DANBURY, VIRGINIA, 0, 80197512 9A CAR VS FRONTIER P 3683 - APPROVE 80197519 AP- 712 E Main St, New Britain- P#1 80197528 (RN) 1/21/25 WTG PD RPT // CRP - 9 80197536 CAR VS POLE- APPROVED 12/21/25 80197540 9.03.25 CT HP REQ AB- 9A CAR VS FR 80197560 PROPERTY DAMAGE (KEEP COST)-OH-ANNU 80197562 11/16/24 5 GREENBRIAR RD OXFORD 80197611 MPB; 190 CLAPBOARD RD, BRIDGEWATER 80197619 Appr Grp Crystal Lake Rd 303, Tolla 80197629 *HARTFORD AWC* CD02444 Pole Integri 80197634 15 DD BY 1/24/25 RC POLE 1633 INSTA 80197699 POST CONSTRUCTION 9A CAR VS ES POL 80197703 comp by AWC 11/15/24 9A TURNOVER 20 80197708 *ASP* CD02444 Pole Integrity Replac 80197734 *ASP* CD02444 Pole Integrity Replac 80197746 Hope Valley Road, Amston, CT - assi 80197764 *ASP* CD02444 Pole Integrity Replac 80197805 PRINT JFC - INT-94995 WO# 18084261 80197832 *ASP* CD02444 Pole Integrity Replac 80197985 *ASP* CD02444 Pole Integrity Replac 80197996 *ASP* CD02444 Pole Integrity Replac 80198180 MPB; 94 BRUSHY HILL RD, WOODBURY 80198190 SIMSBURY, OLD FARMS, 166, PRI RISER 80198238 MAIN ST 919, SOMERS - NEW OH SVC W/ 80198280 WRTN - DM - 126 SUNSET DR -- GLASTO 80198302 (BCW MATERIAL) *D&D*CD02444 Pole In 80198315 11/18/24 TERRACE DR SHERMAN 80198321 509 Jonathan Trumbull Hwy, Columbia 80198359 Appr Grp 167 SCANTIC RD., EAST WIN 80198362 *ASP* CD02444 Pole Integrity Replac 80198377 WRTN - DM - 12 KEIRSTEAD CIR MARLBO 80198393 WRTN - DM - 215 OLD MAIDS LN SOUTH 80198395 *D&D*CD02444 Pole Integrity Replace 80198423 ESSEX, N MAIN, 69//NEW ES POLE, SEC 80198430 PRIORITY REJECT P.10927 DANBURY (22 80198437 AE/JD; 300 W MAIN ST STAMFORD; NSVC 80198557 *ASP* CD02444 Pole Integrity Replac 80198982 DJM. 128 BAYBERRY LN WESTPORT. LINE 80199001 9A - CAR VS POLE - SENT TO YADIRA 9 80199014 GC - UNCASVILLE, HARTFORD NEW LONDO 80199100 YA; 189 DAVIS AVE; REPLACE POLES AN 80199173 LD 300 WILSON AVE NORWALK INS PRI P 80199271 AP 563R SOUTH ST, NEW BRITAIN- PAD# 80199283 CD01261-(2023 AIMS Seg 08, Part 02 80200139 P 11/19 TURNOVER W MAIN( 1561) 80200196 TURNOVER E# 5538443 11/20/24 182 80200240 *D&D*CD02444 Pole Integrity Replace 80200267 MATERIAL - 9A CAR VS POLE - NO PR F 80200277 PLANNED 10/08 9A CAR VS POLE - STOL 80200291 *D&D*CD02444 Pole Integrity Replace 80200314 (BCW MATERIAL) *D&D*CD02444 Pole In 80200331 *D&D*CD02444 Pole Integrity Replace 80200349 *ASP* CD02444 Pole Integrity Replac 80200357 WRTN NEEDS LINE East Hampton Rd / F 80200377 MPB; 289 COWLES RD, WOODBURY - RPLC 80200380 MG-P#1936, P#1936S, P#2016- AREA OF 80200393 9A CAR VS POLE -APPROVED 10/24 80200432 *D&D*TW - Conv. 1646909 - Make Read 80200507 *ASP* CD02444 Pole Integrity Replac 80200526 450 CAPTAIN NEVILLE DR WTB Shift 80200628 9A: JRP - DeFashion St SOG Repl P#9 80200629 IN PROGRESS 11/20/24 - 9A TURNOVER 80200638 ISSUES 15D 7/15 Jpt-0 Chamberlain H 80200642 9A - CAR VS POLE 8665 - APPROVED 1 80200661 JMS- 11/17/24 OLD OAK:RD:WEST HARTF 80200750 *ASP* Convo# 1681694 3rd Party Proj 80200755 DJM. 8 FRANKLIN AVE WESTPORT. NEW 4 80200766 Alden One - NORTH RD., EAST WINDSOR 80200801 WRTN--JK>POLE 1859--INSTALL 35/2 PO 80200806 *D&D*CD02444 Pole Integrity Replace 80200808 MM 98 Ekonk Hill Rd Voluntown Repla 80200820 EVW - 42 Briscoe Rd, Salisbury P#32 80200891 MM - 19 SUGAR HOLLOW RD, WILTON, CT 80200940 (BCW MATERIAL) *D&D*CD02444 Pole In 80200982 *D&D*JS - Conv. 1645962 - Make Read 80200992 *ASP* 3PA MR#1655830 (3 poles) NP, 80200993 *ASP* 3PA MR#1655830 (2 Poles) NP, 80201093 11/21/24-- 71 RATTLESNAKE LEDGE SAL 80201129 MCB - 11/22/24 TURNOVER THOMASTON 80201145 DG P#265 PILFERSHIRE RD EASTFORD CL 80201159 MM 212 Lester Rd Griswold P#2780 Fr 80201171 BC - CD02567 Town of Union Reliabil 80201249 *D&D*KL - Conv. 1645954 - Make Read 80201280 SD; SEYMOUR, STEEP HILL, 52, Deb Ar 80201325 1/4/22 PL: RMV MID-SPAN'D SEC TPLX 80201330 *D&D*KG Conv#1670085-RegularMakeRea 80201365 DONE PRINT BJQ - 11/22 - TREE ON WI 80201372 9101:MIDDLE:ST:MIDDLETOWN:CT 80201411 (BCW MATERIAL) *D&D*CD02444 Pole In 80201432 CRP - 11/22 - TREE DOWN - POLE #293 80201565 STORRS, GRANDVIEW CIR, 47, oh to db 80201586 *D&D*JS - Conv. 1646123 - Make Read 80201590 *D&D*KA- Conv. 1645938- Make Ready 80201659 DG P#1322 125 SABIN ST PUTNAM FRNTR 80201665 APPT 7/28 traffic issue CRP - HARW 80201838 *D&D*ML - Conv. 1646035 - Make Read 80201848 9A - CAR VS POLE 501 - APPROVED 11/ 80201849 WRTN- COMPLETE A P GATES( 65) in-service date work order type 9/11/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense 4/11/2025 11 Elect Annual Proj - DESG CT 4/3/2025 11 Dist Capital or Expense 7/25/2025 11 Elect Annual Proj - DESG CT 4/21/2025 11 Damage Claims OH 12/11/2024 11 Elect Annual Proj - DESG CT 2/11/2025 11 Dist Capital or Expense 12/6/2024 11 Damage Claims OH 2/11/2025 11 Damage Claims OH 2/27/2025 11 Dist Capital or Expense 11/20/2024 11 Elect Annual Proj - DESG CT 2/3/2025 11 Dist Capital or Expense 5/2/2025 11 Dist Capital or Expense 7/31/2025 11 Dist Capital or Expense 1/23/2025 11 Elect Annual Proj - DESG CT 2/12/2025 11 Damage Claims OH 12/24/2024 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 2/7/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 1/16/2025 11 Elect Annual Proj - DESG CT 3/28/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 1/7/2025 11 Elect Annual Proj - DESG CT 1/2/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 11/19/2024 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 2/24/2025 11 Elect Annual Proj - DESG CT 4/24/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 1/3/2025 11 Dist Capital or Expense 4/7/2025 11 Elect Annual Proj - DESG CT 4/28/2025 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 7/17/2025 11 Elect Annual Proj - DESG CT 4/24/2025 11 Dist Capital or Expense 1/30/2025 11 Elect Annual Proj - DESG CT 4/3/2022 11 Damage Claims OH 12/30/2022 11 Elect Annual Proj - DESG CT 1/4/2023 11 Dist Capital or Expense 6/6/2022 11 Elect Annual Proj - DESG CT 11/19/2024 11 Elect Annual Proj - DESG CT 6/27/2025 11 Asset Mgmt - Specific DESG CT 1/28/2025 11 Dist Capital or Expense 1/8/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 4/21/2025 11 Damage Claims OH 10/29/2025 11 Damage Claims OH 11/10/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 2/3/2025 11 Dist Capital or Expense 1/31/2025 11 Dist Capital or Expense 3/27/2025 11 Damage Claims OH 4/25/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 12/11/2024 11 Elect Annual Proj - DESG CT 1/2/2025 11 Dist Capital or Expense 11/26/2024 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 8/21/2025 11 Damage Claims OH 4/4/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 4/15/2025 11 Elect Annual Proj - DESG CT 4/21/2025 11 Corrective Maint OH Lines 12/4/2024 11 Street Light - DESG CT 6/13/2025 11 Dist Capital or Expense 2/13/2025 11 Dist Capital or Expense 10/17/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 6/20/2025 11 Dist Capital or Expense 6/20/2025 11 Elect Project - DESG CT 1/28/2025 11 Dist Capital or Expense 12/10/2024 11 Elect Annual Proj - DESG CT 1/27/2025 11 Corrective Maint OH Lines 11/22/2024 11 Elect Annual Proj - DESG CT 5/21/2025 11 Asset Mgmt - Specific DESG CT 8/18/2025 11 Elect Project - DESG CT 12/4/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 4/25/2025 11 Elect Project - DESG CT 1/10/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 2/4/2025 11 Elect Annual Proj - DESG CT 5/10/2025 11 Corrective Maint UG Svc 8/21/2025 11 Dist Capital or Expense 8/1/2025 11 Dist Capital or Expense 5/6/2022 11 Elect Annual Proj - DESG CT 7/29/2022 11 Asset Mgmt - Specific DESG CT 8/27/2025 11 Dist Capital or Expense 11/5/2025 11 Damage Claims OH 12/10/2024 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 2/13/2026 2/13/2026 3/21/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 7/24/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 8/26/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 2/14/2026 2/13/2026 1/22/2026 364310 Poles and Appurtenance 1,658 4,425 6,003 5,610 2,702 6,526 5,112 2,561 2,980 1,261 699 900 999 3,036 7,211 1,421 5,621 3,114 1,783 598 8,223 6,461 1,960 4,613 237 5,040 5,655 5,431 906 2,162 3,582 4,474 7,710 2,642 2,013 367 2,365 6,592 2,654 19,245 6,188 6,100 9,076 4,544 6,980 3,199 337 6,244 1,031 11,421 94,711 2,077 7,945 10,300 171 5,775 903 6,092 2,616 6,200 1,395 4,070 8,562 2,903 621 6,758 2,717 5,814 17,829 17,770 9,695 175 2,157 4,632 195 2,126 2,903 4,021 287 2,997 7,404 278 7,971 1,244 346 7,839 3,850 885 21,226 4,079 1,189 5,789 3,203 3,792 1,345 4,331 4,844 5,285 2,212 573 694 (782) 6,880 5,806 1,791 365000 Overhead Conductors, Device 2,954 647 1,204 4,964 2,694 1,217 4,321 3,529 1,165 667 2,160 338 1,099 1,177 1,894 944 7,271 902 38 88 1,575 606 5,452 933 1,629 1,135 402 676 1,340 177 865 1,353 895 217 653 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 568 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 99 2,415 314 5,741 343 726 343 3,748 2,043 203 1,040 148 385 1,032 406 281 6,049 152 750 367 246 51 1,092 2,122 1,783 301 865 2,236 4,481 6,401 2,455 5,588 1,701 9,772 267,361 369720 DB/UG Conductors and Devices 2,743 885 56,316 7,002 9,859 6,777 11,584 341 126 1,458 4,303 3,036 12 3,148 134 51 312 150 1,140 1,812 682 154 1,679 4,024 106,048 3,355 3,146 2,432 1,699 1,692 377 7,412 2,612 (272) 8,426 1,445 682 10,718 1,819 762 146,650 2,388 1,414 1,339 506 145 1,712 1,113 469 1,296 173 4,281 (329) 4,979 895 300 78 12 320 4,010 21,766 526 1,259 262 1,544 2,335 3,414 79 369 27 (51) 1,959 137 1,630 126 142 (35) (26) 24 58 597 824 45 (210) 112 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 5,180 5,386 7,206 16,315 6,465 7,743 11,820 9,839 4,145 1,928 3,062 1,239 2,097 5,253 9,253 2,365 12,892 5,433 1,821 686 9,798 7,473 7,412 4,613 1,169 6,669 6,790 6,114 1,582 9,703 4,509 5,340 9,430 3,784 2,229 1,071 2,365 7,684 4,776 21,028 9,232 6,100 10,825 6,780 67,776 9,600 10,134 21,691 9,636 38,538 362,072 2,077 10,982 10,300 182 9,057 954 6,092 2,616 6,513 1,545 5,288 10,374 2,903 633 7,760 2,871 7,493 25,863 145,584 13,050 3,321 4,588 8,115 195 4,640 2,903 5,713 926 11,953 12,350 6 16,397 2,689 1,028 21,971 5,748 1,646 168,245 6,444 4,700 8,758 3,709 3,792 1,490 6,043 6,680 6,579 3,694 746 4,940 (1,346) 11,994 6,758 2,091
  4. Page 18 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 18 of 104 Work Order Number Description 80201852 9A - CAR VS FRONTIER POLE 2267 - A 80201854 CRP - 11/22 - FARMINGTON RIVER(24) 80201860 MM Thompson Rd Griswold P#981 ES ch 80201873 WTG FOR 9A TO CLOSE 2/7/25 (TH) CRP 80201878 print 11/25 JFC/POLE 21126 BASSETT 80201911 43 Fox Den Rd 80201915 work completed in field - 11/24-RSO 80201919 DM -9A - 11/25 - RSO - [CRUZJAX] 80201967 HOLD FOR CUST PRINT BJQ - LITCHFIEL 80202068 **11 W WARF AVE MADISON P291 REPLAC 80202127 P HEBRON, MAIN, 44, State of Conn 80202133 **all work complete- 9A - BARTMAN ( 80202174 60 Roxbury Rd, Eat Lyme, P2844 Repl 80202180 MCB- 3060 N MAIN ST WTBY - DG - P1 80202222 45 Derry Hill Rd, Montville, 5 Pole 80202303 XL, CD02504 seg 5, pole 604 install 80202312 XL, CD02504 seg 5, install new SR,1 80202521 SD; 7 RIMMON HILL ROAD BEACON FALLS 80202538 MCB - 48 NORTHWOOD DR WTBY - RPLC F 80202549 WM; 9/5/22 105 WEST MOUNTAIN RD WAS 80202552 INT-101259 WO# 19460209 PLAINFIELD, 80202557 MG- P#4000- COMMERCE AVE KILLINLGY80202567 written 11/12(RSO-PLOURDE) GORDON(3 80202570 CHESHIRE 139 DELAWARE AVE WTBY - P 80202580 MCB - 313 MERIDEN RD WTBY - P8356, 80202610 **NJB 75 BRAINARD RD HTFD INSTL NE 80202613 MADISON - ALL WORK COMP - P.798 RE 80202628 **all work complete p798 BUNNELL BR 80202667 RM, 436 NEWTOWN TPKE - WESTON !! PO 80202675 MCB - 72 BLUEBERRY HILL RD WTBY 80202702 3155:REVERKNOLLS:RD:AVON:CT 80202730 PRINT JFC 298 DAVIS ST WATERTOWN 80202734 DONE PRINT JFC/29 CRESTWOOD AVE POL 80202755 WRTN COMPLETE 9A - OLD WEST HIGH( 80202770 4/2/24 BURNSIDE( 1267) AVE , EAST H 80202858 CP TC 39 PIERSON DR, GRN: P#92 & P# 80202891 line work comp-15DD 4/4 JRP - 74 Ma 80202925 DONE-BJQ - TURNOVER E# 5543967 11/ 80202927 15D 12/31 AP- 1 Veterans Dr, New Br 80202944 KTI RR; SOUTHBURY, BULLET HILL, #93 80203034 oh WORK comp - OAC- 219 CLARK ST HT 80203035 LA 6/28 WARREN( 40) TER -- 60 80203065 MJ-MCB - 12 TIMBER HILL ROAD, PROSP 80204212 CAR VS POLE - APPROVED 4/4/25 80204242 Done EVW - 297 Litchfield Rd, Norfo 80204243 MEETING HOUSE (24) RD -- #2485, HAD 80204249 Low Cables - RT 66, Columbia 80204299 WRTN - DM - 456 THOMPSON ST GLASTON 80204366 9A - CAR VS POLE 14545 - APPROVED 2 80204462 TURNOVER** 9A** S WATER( 251) 80204542 9A -CAR VS POLE-NO RESPONSE TO FOIA 80204739 NEW JD 3/25/24 (RSO- MARA) CLARKS F 80204766 12.03.24 DSINPRG STATUS AB- 11/28/2 80204769 WTG FOR PD RPT 3/19/25 (TH) CRP - 1 80204792 EVW - 9A CUSTOMER VS POLE 11/27 [WI 80204824 **replace cross arm Comstock Ave, I 80204834 9A: JRP - Mount Vernon Rd Replace P 80204855 COLCHESTER, NORWICH AVE, 487, 80204862 9A CAR VS POLE - APPROVED 2/17 80204864 MPB; 485 WASHINGTON RD, WOODBURY 80204903 Replace Xarm - Inspiration Ln/WEST 80204937 RM, 32 KETTLE CREEK RD - WESTON, !! 80205151 MG-P#3058 NORTH( 1298) RD -KILLINGL 80205155 WRTN COMPLETE 9A*: OLD HARTFORD( 80205159 CAR VS POLE - APPROVED 6/4/26 80205169 9A* - 12/1 - RSO - [FONTAKA]: UNION 80205172 12/1/24 SAW MILL RD NEWTOWN 80205220 Jpt-5 Park Ave Wolcott - Completion 80205247 9A- NORTH( 1071) RD -- 1155, KILLIN 80205268 JFM- *POST CNSTR* - 9A CAR VS POLE 80205300 POST CONSTRUCTION - 9A CAR VS POLE 80205432 RM, 11 KERMIT ST - NORWALK !! REPL 80205461 JRP - 18 Hilltop Dr SOG Inst 35' Cl 80205885 SL - 9A - 335 New Haven Rd, Durham 80205919 DG UPGRADE , MANCHESTER,10 DEEPWOOD 80205952 JES; 3 MANRECA ISLAND; OLD POWER PL 80205961 ALL WORK COMPLETE - GP* 9A - Boston 80206056 PRINT BJQ, MORRIS, (27) HICKORY HIL 80206107 JTR,16 S MAIN STREET, EAST GRANBY, 80206109 MPB; 2A FIDDLEHEAD RD, OXFORD 80206139 JLB 13 HACKETT CIR STAMFORD FRNTR P 80206151 JRP/BN - W Queen St SOG12A6 Change 80206208 *Hawkeye* MCB - 972 S MAIN ST SOUTH 80206209 SL - 1331 Highland Ave, Cheshire 80206798 9A CAR VS FRONTIER P 2502 - APPROVE 80206816 9A - CAR VS POLE #302S - APPROVED 2 80206840 MV - SALEM, WITCH MEADOW, 139, I/R 80206921 9A EVENT 5548142 FOXWOODS BOULEVARD 80206991 MR; ***WRITTEN***SHIFT TO NEW FTR P 80207088 DG P#2113 344 RIVER RD PUTNAM INST 80207151 8/1/22 9A 80 FULKERSON DR -WATERBUR 80207190 CEMETERY RD., EAST WINDSOR - SHIFT 80207211 MCB - (9A) 04.15.22 - 444 N MAIN ST 80207243 7/3/22 49 PHOENIX AVE NAUGATUCK 80207327 (BCW MATERIAL) *D&D*CD02444 Pole In 80207328 GILBRONSON RD 2, UNION - 400A OH/DB 80207343 *D&D* 3PA Convo#1691623 (2 poles) ( 80207487 WTG FOR PD RPT 12/5/24 (TH) 12/4/24 80207489 RL:9A - 904 LAKE AVE, GRN: VERIZON 80207500 9A CAR VS FRONTER POLE - APPROVED 1 80207510 rm, 45 MOHAWK DR, NORWALK CT - !!WO 80207512 pr JSG - FALLS VILLAGE, WARREN, 246 80207519 MG-P#1067-TRIPP HOLLOW( 35) RD-CANT 80207531 15DD 3/14 JFM-OH/UG RISER SVC- 270 80207596 *D&D*TW - Conv. 1646894 - Make Read in-service date work order type 4/2/2025 11 Damage Claims OH 1/24/2025 11 Dist Capital or Expense 2/26/2025 11 Elect Annual Proj - DESG CT 2/26/2025 11 Damage Claims OH 12/10/2024 11 Elect Annual Proj - DESG CT 12/15/2024 11 Elect Annual Proj - DESG CT 11/30/2024 11 Elect Annual Proj - DESG CT 12/24/2024 11 Damage Claims OH 10/27/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 2/13/2025 11 Elect Annual Proj - DESG CT 2/3/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 10/15/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/30/2025 11 Dist Capital or Expense 10/24/2025 11 Dist Capital or Expense 3/4/2025 11 Elect Annual Proj - DESG CT 12/26/2024 11 Elect Annual Proj - DESG CT 3/12/2025 11 Elect Annual Proj - DESG CT 5/23/2025 11 Elect Annual Proj - DESG CT 12/12/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 8/28/2025 11 Dist Capital or Expense 3/26/2025 11 Damage Claims OH 7/29/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Elect Annual Proj - DESG CT 2/10/2025 11 Elect Annual Proj - DESG CT 5/29/2025 11 Asset Mgmt - Specific DESG CT 8/26/2025 11 Dist Capital or Expense 1/5/2025 11 Elect Annual Proj - DESG CT 12/18/2024 11 Elect Annual Proj - DESG CT 1/27/2025 11 Dist Capital or Expense 12/9/2024 11 Dist Capital or Expense 6/16/2025 11 Dist Capital or Expense 1/14/2025 11 Elect Annual Proj - DESG CT 3/25/2025 11 Corrective Maint OH Svc 11/27/2024 11 Elect Annual Proj - DESG CT 12/17/2025 11 Corrective Maint UG Svc 10/11/2022 11 Elect Annual Proj - DESG CT 9/25/2025 11 Dist Capital or Expense 7/25/2025 11 Dist Capital or Expense 5/26/2023 11 Elect Annual Proj - DESG CT 3/19/2025 11 Damage Claims OH 1/2/2025 11 Elect Annual Proj - DESG CT 2/3/2025 11 Dist Capital or Expense 1/24/2025 11 Elect Annual Proj - DESG CT 5/14/2025 11 Corrective Maint UG Lines 10/2/2025 11 Damage Claims OH 11/29/2024 11 Damage Claims OH 1/24/2025 11 Damage Claims OH 1/16/2025 11 Dist Capital or Expense 12/3/2024 11 Damage Claims OH 3/19/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 4/30/2025 11 Dist Capital or Expense 12/26/2024 11 Dist Capital or Expense 1/24/2025 11 Elect Annual Proj - DESG CT 10/8/2025 11 Damage Claims OH 9/24/2025 11 Corrective Maint UG Svc 2/3/2025 11 Dist Capital or Expense 5/13/2025 11 Elect Annual Proj - DESG CT 12/11/2024 11 Damage Claims OH 12/17/2024 11 Dist Capital or Expense 1/29/2025 11 Damage Claims OH 3/6/2025 11 Damage Claims OH 12/2/2024 11 Elect Annual Proj - DESG CT 11/14/2025 11 Dist Capital or Expense 12/11/2024 11 Dist Capital or Expense 12/16/2024 11 Dist Capital or Expense 2/10/2025 11 Damage Claims OH 2/14/2025 11 Elect Annual Proj - DESG CT 6/11/2025 11 Dist Capital or Expense 12/9/2024 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 4/22/2025 11 Corrective Maint UG Svc 3/3/2025 11 Damage Claims OH 3/17/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 2/21/2025 11 Elect Annual Proj - DESG CT 2/5/2025 11 Elect Annual Proj - DESG CT 7/23/2025 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 10/24/2025 11 Damage Claims OH 1/27/2025 11 Damage Claims OH 4/25/2023 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 5/4/2023 11 Elect Annual Proj - DESG CT 11/15/2022 11 Elect Annual Proj - DESG CT 10/20/2025 11 Damage Claims OH 3/24/2025 11 Dist Capital or Expense 5/14/2025 11 Damage Claims OH 4/23/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 12/22/2025 11 Dist Capital or Expense 12/12/2024 11 Damage Claims OH 12/5/2024 11 Damage Claims OH 12/26/2024 11 Damage Claims OH 12/31/2024 11 Elect Annual Proj - DESG CT 10/28/2025 11 Corrective Maint OH Svc 12/10/2024 11 Corrective Maint OH Lines 2/26/2025 11 Corrective Maint OH Svc 8/21/2025 11 Elect Project - DESG CT Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 6/26/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 8/26/2026 5/15/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 2/13/2026 2/13/2026 1/22/2026 6/26/2026 4/20/2026 4/20/2026 364310 Poles and Appurtenance 401 475 731 2,231 2,987 13,875 4,128 16,287 10,419 764 4,397 1,069 1,183 22,909 986 4,560 3,402 6,401 9,279 7,774 3,890 4,688 1,977 6,500 1,938 9,414 104 9,329 4,594 4,652 700 3,400 2,889 753 4,293 1,006 4,386 4,444 487 13,108 4,493 3,174 6,735 1,007 19,003 2,267 731 (44) 3,401 4,194 3,815 2,666 2,919 3,281 1,629 729 2,168 10,260 818 65 3,229 5,146 2,786 7,058 1,875 7,545 6,233 5,341 138 557 8,367 6,964 683 2,636 2,217 5,568 5,413 1,354 6,172 6,947 235 866 (13,251) 2,491 1,599 3,198 2,707 2,502 177 (755) 7,025 2,806 715 12,700 5,035 6,013 8,579 1,416 6,166 3,863 5,805 158 2,150 385 1,801 365000 Overhead Conductors, Device 2,064 53 239 2,090 779 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 208 753 8,307 6,048 37 553 204 326 127 3,194 300 12,646 110,856 792 3,395 159 1,205 168,700 701 1,744 324 119,416 2,586 3,857 1,661 1,752 290 393 351 228 80 2,799 2,726 741 2,495 1,060 1,622 84 951 33,229 854 17 17 630 2,090 2,653 17,450 902 311 711 245 986 1,648 3,818 3,792 1,541 (15) 4,091 1,026 2,039 5,144 2,612 3,569 263 85 813 4,396 1,309 (38) 408 1,312 3,336 6,048 1,886 3,117 1,762 6,036 15 798 2,117 692 32 19,455 928 3,888 6,211 521 2,046 305 1,127 15,365 (1,718) 6,665 3,112 949 77 0 11,758 (492) 670 (7) 734 413 245 132 22 36,628 119 23 258 363 279 1,749 469 539 289 1,144 3,793 925 4,495 16,935 106 6,778 450 1,856 132 1,011 64 535 528 1,131 5,319 8,783 646 453 5,905 1,125 2,873 6,465 1,272 422 4,135 959 313 826 579 993 99 765 2,283 150 924 679 1,224 125 1,602 92 333 40 282 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 2,464 528 970 4,530 3,766 13,875 4,917 24,594 19,747 764 5,342 1,395 1,310 28,598 1,286 17,205 114,258 8,253 14,296 7,933 5,178 173,389 2,679 9,196 2,261 162,059 2,690 13,186 6,256 7,257 1,007 3,793 3,240 998 4,374 3,806 5,015 6,534 5,302 31,515 4,493 4,237 9,117 1,007 23,234 6,304 14,856 (558) 44,120 5,339 5,854 7,832 5,789 7,212 1,892 814 2,981 16,684 2,127 496 3,636 7,923 6,411 18,746 3,761 10,663 7,994 32,105 153 1,355 10,483 7,656 821 22,091 3,144 16,684 11,624 1,875 8,219 9,107 1,494 16,231 (14,969) 9,156 4,711 3,198 4,317 3,031 1,407 7,612 15,808 3,452 1,317 18,605 7,083 10,789 15,044 2,813 6,588 9,600 6,856 803 2,976 1,287 2,794
  5. Page 19 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 19 of 104 Work Order Number Description in-service date work order type 80207622 MPB; 218 QUAKER FARMS RD, OXFORD 8/7/2025 11 Elect Annual Proj - DESG CT 80207655 CRP - 12/4/24 -- TREE VS. PRIMARY 2/7/2025 11 Elect Annual Proj - DESG CT 80207721 12/5/24, JK>POLE 680--TREE V ESE PO 2/7/2025 11 Elect Annual Proj - DESG CT 80207753 RM, 15 RIDGE LN - WESTON,!! 2ND TIM 3/6/2025 11 Elect Annual Proj - DESG CT 80207757 *ASP* 3PA Convo#1691623(8 poles) NP 9/8/2025 11 Dist Capital or Expense 80207777 DG P#1829 RT 197/RT 198 WOODSTOCK F 12/10/2024 11 Elect Annual Proj - DESG CT 80207809 **MM - 130 OLD HWY -- 14683, WILTON 2/6/2025 11 Dist Capital or Expense 80208073 CAR VS POLE-APPROVED 1/29 10/16/2025 11 Damage Claims OH 80208076 9A CAR VS FRONTIER POLE #751 - APPR 1/16/2025 11 Damage Claims OH 80208080 9A- CAR VS POLE- APPROVED 3/26/26 2/3/2025 11 Damage Claims OH 80208082 PM-HIGGANUM RD DURHAM-POST CONSTRUC 12/12/2024 11 Dist Capital or Expense 80208083 9A OK TO CLOSE- 12/5 - AWC - STAFF 1/10/2025 11 Dist Capital or Expense 80208132 Appr Grp -OLD TOWN RD 28, ASHFORD 3/20/2025 11 Dist Capital or Expense 80208146 CAR VS POLE- APRPOVED 12/9/25 4/11/2025 11 Damage Claims OH 80208158 DG P#175 WESTFORD RD EASTFORD HBV 9 12/13/2024 11 Dist Capital or Expense 80208168 CP TC 64 LONDONDERRY DR, GRN: P#793 1/24/2025 11 Dist Capital or Expense 80208175 JDB 116 NOD RD RIDGEFIELD, SHIFT PO 3/24/2025 11 Dist Capital or Expense 80208205 *D&D*Conv. 1646935 - Make Ready Non 5/29/2025 11 Dist Capital or Expense 80208210 *D&D*Conv. 1646935 - Make Ready Non 7/22/2025 11 Dist Capital or Expense 80208289 DG P#51 RIVERSIDE DR THOMPSON FRNTR 12/10/2024 11 Dist Capital or Expense 80208303 DG P#2143 QUADDICK RD THOMPSON FRNT 2/11/2025 11 Dist Capital or Expense 80208342 CB CD02446 Tree trim & Reconductor 12/31/2025 11 Dist Capital or Expense 80208345 MM 8 School House Rd Lisbon P#622 E 4/8/2025 11 Dist Capital or Expense 80208360 *D&D*KG Conv#1653037-RegularMakeRea 8/29/2025 11 Dist Capital or Expense 80208461 *D&D* Conv. 1646905- Make Ready Non 11/28/2025 11 Dist Capital or Expense 80208538 VALID PER FLOTAT 12/9/24 - GCC / SI 5/16/2025 11 Dist Capital or Expense 80208540 South Grand St 260, Suffield 9A-12/ 12/23/2024 11 Dist Capital or Expense 80208550 CAR VS POLE - APPROVED 3/4/26 3/25/2025 11 Damage Claims OH 80208566 9A PD REPORT ATTACHED CAR VS POLE 1 3/18/2025 11 Dist Capital or Expense 80208578 HADDAM - ALL WORK COMPL. - REPL XAR 3/14/2025 11 Dist Capital or Expense 80208581 12-10-24 PR ORDERED**SL - 9A - 333 12/16/2024 11 Dist Capital or Expense 80208583 WRTN - DM - TD 941 Balance load 22R 1/31/2025 11 Elect Annual Proj - DESG CT 80208590 MRP - (9A) -NONBILLABLE EXIT 29 N R 10/2/2025 11 Damage Claims OH 80208698 9A- CAR VS POLE- NO PR FOUND - NON2/28/2025 11 Damage Claims OH 80208700 12/10/24-WTG FOR PR (RR)JFC - 12/5 12/12/2024 11 Damage Claims OH 80208715 *D&D*CD02444 Pole Integrity Replace 11/10/2025 11 Dist Capital or Expense 80208831 mcb - WTG FOR PD RPT 12/10/24 (TH) 12/11/2024 11 Damage Claims OH 80208888 580 Coleman Road, Middletown - Pole 2/28/2025 11 Elect Annual Proj - DESG CT 80208927 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80208947 NEEDS REWRITE --DMD - 584 MAIN ST / 1/30/2025 11 Dist Capital or Expense 80208955 *ASP* CD02444 Pole Integrity Replac 4/22/2025 11 Dist Capital or Expense 80208985 *ASP* CD02444 Pole Integrity Replac 4/24/2025 11 Dist Capital or Expense 80209012 *ASP* CD02444 Pole Integrity Replac 4/22/2025 11 Dist Capital or Expense 80209182 Tolland Tpke 379, Willington. Repla 8/6/2025 11 Dist Capital or Expense 80209194 9A - 80 Race Track Rd, Salisbury P# 9/17/2025 11 Damage Claims OH 80209212 JLB 28 MILLS RD STAMFORD P11037 SEC 6/17/2025 11 Dist Capital or Expense 80209214 CAR VS POLE - APPROVED 1/23/25 1/9/2025 11 Damage Claims OH 80209250 JDB 19 OLD BRANCHVILLE RD, RIDGEFIE 2/20/2025 11 Corrective Maint UG Svc 80209259 *ASP* CD02444 Pole Integrity Replac 4/3/2025 11 Dist Capital or Expense 80209276 12/10/24 (RSO KNAPP) 6TH(11) AVE -1/3/2025 11 Dist Capital or Expense 80209288 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80209293 *ASP* CD02444 Pole Integrity Replac 4/3/2025 11 Dist Capital or Expense 80209319 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80209320 *ASP* CD02444 Pole Integrity Replac 4/22/2025 11 Dist Capital or Expense 80209332 *ASP* CD02444 Pole Integrity Replac 4/14/2025 11 Dist Capital or Expense 80209343 *ASP* CD02444 Pole Integrity Replac 4/14/2025 11 Dist Capital or Expense 80209358 DONE PRINT BJQ - 11/9 [GIANNP] - DA 2/28/2025 11 Dist Capital or Expense 80209363 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80209366 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80209390 *ASP* CD02444 Pole Integrity Replac 4/3/2025 11 Dist Capital or Expense 80209397 *ASP* CD02444 Pole Integrity Replac 4/22/2025 11 Dist Capital or Expense 80209444 *ASP* CD02444 Pole Integrity Replac 4/14/2025 11 Dist Capital or Expense 80209642 Bradley Park Rd 51, East Granby. Up 8/21/2025 11 Corrective Maint UG Svc 80209676 *ASP* CD02444 Pole Integrity Replac 4/22/2025 11 Dist Capital or Expense 80210871 5/2 CP-173A Main St, NH. new CV 40 5/20/2022 11 Elect Annual Proj - DESG CT 80210926 MM 85 Blissville Rd Lisbon going OH 9/29/2022 11 Elect Annual Proj - DESG CT 80211043 CAR VS POLE- APPROVED 4/17/26 1/23/2025 11 Damage Claims OH 80211067 CP AE/TC 270 OLD CHURCH RD, GRN: P# 7/3/2025 11 Dist Capital or Expense 80211110 *ASP* CD02444 Pole Integrity Replac 4/24/2025 11 Dist Capital or Expense 80211121 9A- CAR VS POLE- APPROVED 5/4 12/3/2025 11 Damage Claims OH 80211123 10/2/25 - NON BILLABLE - NO REPORT 2/6/2025 11 Damage Claims OH 80211127 9A CAR VS POLE -APPROVED 12/9/25 2/12/2025 11 Damage Claims OH 80211133 9a car vs pole - NRFN 12/16/2024 11 Damage Claims OH 80211144 9A CAR VS FRONTIER POLE 1268 - APPR 12/11/2024 11 Damage Claims OH 80211155 *ASP* CD02444 Pole Integrity Replac 3/28/2025 11 Dist Capital or Expense 80211164 DG P#55 COUNTY HOME RD THOMPSON FRN 1/6/2025 11 Dist Capital or Expense 80211193 9A CAR VS POLE - APPROVED 12/9/25 9/10/2025 11 Damage Claims OH 80211195 *D&D*TW - Conv. 1646875 - Make Read 8/1/2025 11 Dist Capital or Expense 80211200 *HARTFORD AWC* CD02444 Pole Integri 8/7/2025 11 Elect Annual Proj - DESG CT 80211233 *AWC* CD02444 Pole Integrity Replac 11/28/2025 11 Dist Capital or Expense 80211239 *AWC* CD02444 Pole Integrity Replac 10/27/2025 11 Dist Capital or Expense 80211303 *ASP* CD02444 Pole Integrity Replac 4/3/2025 11 Dist Capital or Expense 80211340 *AWC* CD02444 Pole Integrity Replac 9/17/2025 11 Dist Capital or Expense 80211365 *AWC* CD02444 Pole Integrity Replac 10/14/2025 11 Dist Capital or Expense 80211376 *ASP* CD02444 Pole Integrity Replac 3/28/2025 11 Dist Capital or Expense 80211382 *AWC* CD02444 Pole Integrity Replac 11/20/2025 11 Dist Capital or Expense 80211393 *ASP* CD02444 Pole Integrity Replac 4/14/2025 11 Dist Capital or Expense 80211394 RL:10 MEADOW LN:GRN:VERIZON TO REPL 5/13/2025 11 Dist Capital or Expense 80211398 *AWC* CD02444 Pole Integrity Replac 10/17/2025 11 Dist Capital or Expense 80211403 *HARTFORD AWC* CD02444 Pole Integri 8/8/2025 11 Elect Annual Proj - DESG CT 80211419 PRINT CRP-206 Wallens ST WIN, new O 2/28/2025 11 Elect Annual Proj - DESG CT 80211441 *ASP* CD02444 Pole Integrity Replac 5/12/2025 11 Dist Capital or Expense 80211499 Done EVW - Laurel Way, Norfolk SHI 4/3/2025 11 Dist Capital or Expense 80211580 MPB; 175 PURDY HILL RD, MONROE 3/27/2025 11 Dist Capital or Expense 80211646 STORRS, BROWNS RD, 140, new pole, d 6/9/2025 11 Dist Capital or Expense 80211745 *AWC* CD02444 Pole Integrity Replac 10/27/2025 11 Dist Capital or Expense 80211752 FCOMP HAR OH (Contractors) 12/12 1/24/2025 11 Elect Annual Proj - DESG CT 80211795 *ASP* CD02444 Pole Integrity Replac 4/3/2025 11 Dist Capital or Expense 80211796 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80211813 *AWC* CD02444 Pole Integrity Replac 9/18/2025 11 Dist Capital or Expense 80211832 *ASP* CD02444 Pole Integrity Replac 4/18/2025 11 Dist Capital or Expense 80211833 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80211852 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80211854 *ASP* CD02444 Pole Integrity Replac 6/6/2025 11 Dist Capital or Expense 80211878 DONE-JFC - 9A - 12/11 437:CARTER:RD 12/17/2024 11 Damage Claims OH Subsequent Close Date 2/13/2026 1/22/2026 5/15/2026 8/26/2026 7/17/2026 2/13/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 2/13/2026 1/22/2026 6/26/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 2/13/2026 7/17/2026 2/13/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/9/2026 2/13/2026 2/13/2026 8/26/2026 4/20/2026 2/13/2026 8/26/2026 2/9/2026 4/20/2026 5/15/2026 7/17/2026 2/13/2026 1/22/2026 1/22/2026 8/26/2026 2/13/2026 2/13/2026 5/15/2026 2/13/2026 5/15/2026 2/13/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 2/13/2026 2/13/2026 6/26/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 364310 Poles and Appurtenance 1,682 2,888 1,204 9,009 3,785 55 1,188 11,826 226 361 216 12 145 7,181 2,515 146 177 6,537 5,650 2,501 231 88,785 3,731 12,284 3,717 519 818 660 1,331 245 15,184 8,681 7,719 598 2,649 5,524 7,293 1,124 4,428 55,675 4,264 10,536 4,827 7,639 819 1,069 2,327 2,278 4,415 241 5,282 5,788 6,214 5,165 5,852 3,606 5,964 14,039 5,753 5,778 8,637 5,557 3,052 8,008 2,938 2,733 7,496 15,015 4,113 2,550 13,663 41 2,469 351 4,369 864 811 7,422 31,613 181,552 58,838 3,957 3,155 21,196 1,755 22,628 4,673 11,337 11,627 3,312 1,296 5,130 546 1,442 5,737 20,109 3,572 4,161 6,389 4,828 6,841 7,786 7,846 3,956 2,021 365000 Overhead Conductors, Device 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 420 1,651 1,543 78 873 8,293 271 216 1,131 287 910 205 75 1,507 1,137 6,711 1,526 857 56 379,262 1,140 1,710 5,762 624 113 91 368330 Equipment Overhead 800 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 1,820 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 25 11 83 394 103 1,242 345 67 42 23 9,827 13,015 6,215 78 1,480 756 1,593 1,698 21,491 806 1,410 724 825 916 205 4,051 5,352 978 863 26 691 1,017 687 1,628 2,381 613 225 422 1,111 1,933 5,158 2,372 3,511 903 3,146 855 5,226 3,136 349 920 1,814 8,104 2,706 915 176 426 485 215 144 127 806 750 114 2,937 7,146 1,421 2,813 407 6,883 317 6,001 1,803 1,496 2,143 1,968 2,705 1,932 792 1,462 961 3,538 1,772 764 568 1,216 774 1,645 1,251 207 61 715 185 1,310 106 4,249 3,078 1,894 119 81 378 1,179 729 2,747 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 4,303 2,888 1,649 10,660 5,328 133 2,061 20,119 497 576 1,347 310 1,138 7,386 2,590 1,653 2,950 13,351 7,176 3,358 287 468,392 4,938 13,994 9,479 1,186 931 751 1,331 267 25,011 21,695 13,935 598 2,727 7,208 8,049 2,717 6,127 81,217 5,070 11,946 5,552 8,464 1,736 1,069 7,679 3,903 5,278 267 5,972 6,805 6,900 6,794 8,233 4,219 5,964 15,151 7,686 10,937 8,637 7,930 18,287 8,911 6,686 4,073 12,722 18,151 4,676 3,469 15,477 185 2,596 1,218 5,120 978 811 10,359 39,659 182,973 61,650 3,957 3,562 29,389 2,178 32,878 6,475 11,337 13,122 5,454 6,341 9,728 2,597 2,693 8,378 21,071 7,838 5,932 7,153 5,396 8,057 8,560 12,238 5,206 2,228
  6. Page 20 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 20 of 104 Work Order Number Description 80211888 *ASP* CD02444 Pole Integrity Replac 80211889 TL - TANTUMORANTUM RD, #58 LYME // 80211895 *ASP* CD02444 Pole Integrity Replac 80211915 *ASP* CD02444 Pole Integrity Replac 80211969 *ASP* CD02444 Pole Integrity Replac 80211985 *ASP* CD02444 Pole Integrity Replac 80211987 DONE PRINT CRP-120 Wallens St WIN, 80212025 *ASP* CD02444 Pole Integrity Replac 80212042 *AWC* CD02444 Pole Integrity Replac 80212075 *ASP* CD02444 Pole Integrity Replac 80212094 *ASP* CD02444 Pole Integrity Replac 80212102 *ASP* CD02444 Pole Integrity Replac 80212184 MCB - Interstate Ln Wtby Repl Insul 80212205 *ASP* CD02444 Pole Integrity Replac 80212210 MATERIAL RM, !!EMERGENT WORK - 6 80212212 9A - CAR VS POLE 4516 - APPROVED 10 80212217 MPB; 233 SOUTHBURY RD, ROXBURY - BR 80212235 *ASP* CD02444 Pole Integrity Replac 80212260 *ASP* CD02444 Pole Integrity Replac 80212276 PM-868 SPRUCE BROOK RD MIDDLETOWN-P 80212302 MAR - 234 Longview Terrace, Naugatu 80212324 *ASP* CD02444 Pole Integrity Replac 80212338 *ASP* CD02444 Pole Integrity Replac 80212342 *ASP* CD02444 Pole Integrity Replac 80212349 *AWC* CD02444 Pole Integrity Replac 80212351 *ASP* CD02444 Pole Integrity Replac 80212353 *ASP* CD02444 Pole Integrity Replac 80212354 *ASP* CD02444 Pole Integrity Replac 80212657 9A-OK TO CLOSE-12/15-RSO-STAFFORD(1 80212660 9A- CAR VS POLE- APPROVED 2/24/26 80212662 DG P#568 KILLINGLY RD POMFRET FRNTR 80212668 PR ORDERED 12/18/24 SL - 9A - 779 C 80212669 JTR, 464 Tolland St, EAST HARTFORD 80212670 9A-Car vs Pole - waiting on updated 80212674 9A, 12/15/24, RSO, JK>POLE 1428--CA 80212682 WTG FOR 9A TO CLOSE 2/7/25 (TH) 12/ 80212705 9A - CAR VS FRONTIER POLE - APPROVE 80212734 *ASP* CD02444 Pole Integrity Replac 80212748 DG P#893 1250 THOMPSO RD THOMPSON C 80212829 DJM. 254 HILLSPOINT RD WESTPORT. NE 80212836 12/14/24 - 9A - 990 WASHINGTON RD, 80212852 *AWC* CD02444 Pole Integrity Replac 80212860 *ASP* CD02444 Pole Integrity Replac 80212862 MCB - WTG FOR PD RPT 12/16/24 (TH) 80212868 MCB - WTG FOR PD RPT 12/16/24 (TH) 80212881 Thrall Rd 31, EW. Primary tap for n 80212882 *ASP* CD02444 Pole Integrity Replac 80212894 *AWC* CD02444 Pole Integrity Replac 80212896 *ASP* CD02444 Pole Integrity Replac 80212900 OLD SAYBROOK, 40 MILL ROCK RD E//SH 80212902 *AWC* CD02444 Pole Integrity Replac 80212922 *ASP* CD02444 Pole Integrity Replac 80212929 *ASP* CD02444 Pole Integrity Replac 80212934 *ASP* CD02444 Pole Integrity Replac 80212955 *ASP* CD02444 Pole Integrity Replac 80212991 *ASP* CD02444 Pole Integrity Replac 80213006 *ASP* CD02444 Pole Integrity Replac 80213047 *ASP* CD02444 Pole Integrity Replac 80213092 *ASP* CD02444 Pole Integrity Replac 80213111 *HARTFORD AWC* CD02444 Pole Integri 80213113 *ASP* CD02444 Pole Integrity Replac 80213118 JTR, CD01834, Spencer St, Suffield, 80213125 *ASP* CD02444 Pole Integrity Replac 80213167 *ASP* CD02444 Pole Integrity Replac 80213363 JTR, 41 GREENFIELD ST , HARTFORD, 80213394 9A CAR VS POLE - APPROVED 7/25/25 80213438 *D&D*Conv. 1633617 - Make Ready Non 80213547 80 HOFFMAN RD., ELLINGTON - OH PRIM 80213553 12/15(RSO-DOWLING) COVE VIEW DR, QU 80213699 *ASP* CD02444 Pole Integrity Replac 80213739 432 Town Street, East Haddam. New C 80213811 *D&D*Conv. 1633638 - Make Ready Rei 80213812 *ASP* CD02444 Pole Integrity Replac 80213928 MG-P#199- EVENT 5559053 P#199 CHURC 80213931 9A - CAR VS POLE -APPROVED 1/29 80213947 RM, 9A CODFISH (14) LN -- UG, WESTO 80213961 CAR V POLE - APPROVED 5/19/26 80213981 DMD - 55 BROWN ST - MIDDLETOWN - NE 80214020 *GP - Replace Crossarm and re-span 80214045 WM; NEW MILFORD, LAKE, 48, GARTH HE 80214082 *ASP* CD02444 Pole Integrity Replac 80214115 *D&D*CD02444 Pole Integrity Replace 80214132 *ASP* CD02444 Pole Integrity Replac 80214152 (BCW MATERIAL) *D&D*CD02444 Pole In 80214194 *D&D*CD02444 Pole Integrity Replace 80214207 12/18 - RSO - [GNESDJE] - MAIN( 80214230 (BCW MATERIAL) *D&D*CD02444 Pole In 80214305 (BCW MATERIAL) *D&D*CD02444 Pole In 80214333 *D&D* Frontier Inspection Pole Shif 80214335 *AWC* CD02444 Pole Integrity Replac 80214353 TL - MILE CREEK RD, #149 OLD LYME / 80214358 *D&D* Frontier Inspection Pole Shif 80214372 *D&D* Frontier Inspection Pole Shif 80214375 (BCW MATERIAL) *D&D*CD02444 Pole In 80214492 DON12/19/24 WTG FOR PD RPT (RR FOR 80214507 DG P#2378 FABYAN RD THOMPSON CLP PO 80214510 all work complete - 12/18/24 - 9A 80214579 *D&D*CD02444 Pole Integrity Replace 80214591 MCB - 121 Country Club Rd Wtby Pole 80214603 *D&D*CD02444 Pole Integrity Replace 80214605 AE/DL; MYRTLE AVE; 1K18-90T Myrtle 80214612 *D&D*CD02444 Pole Integrity Replace 80214635 WRTN - DM - 62 FINLEY HILL RD MARLB 80214656 MCB - 35 Glen St Wtby Install Reclo 80214664 DJM. 1 TWIN OAKS LN WESTPORT. NEW 4 in-service date work order type 4/18/2025 11 Dist Capital or Expense 1/30/2025 11 Elect Annual Proj - DESG CT 3/28/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 1/15/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 10/27/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 3/5/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 9/24/2025 11 Damage Claims OH 1/13/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 4/16/2025 11 Elect Annual Proj - DESG CT 4/24/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 9/11/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/10/2025 11 Damage Claims OH 1/28/2025 11 Damage Claims OH 12/19/2024 11 Dist Capital or Expense 12/23/2024 11 Dist Capital or Expense 12/3/2025 11 Damage Claims OH 3/5/2025 11 Dist Capital or Expense 1/27/2025 11 Damage Claims OH 2/12/2025 11 Damage Claims OH 4/10/2025 11 Damage Claims OH 4/22/2025 11 Dist Capital or Expense 1/21/2025 11 Dist Capital or Expense 6/19/2025 11 Dist Capital or Expense 1/10/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 12/18/2024 11 Damage Claims OH 12/18/2024 11 Damage Claims OH 10/29/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 10/27/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 5/23/2025 11 Corrective Maint OH Lines 11/25/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 7/29/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 8/12/2025 11 Asset Mgmt - Specific DESG CT 7/7/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 1/10/2025 11 Damage Claims OH 4/21/2025 11 Damage Claims OH 3/21/2025 11 Dist Capital or Expense 7/11/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 3/12/2025 11 Elect Annual Proj - DESG CT 5/16/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 12/20/2024 11 Dist Capital or Expense 10/1/2025 11 Damage Claims OH 1/13/2025 11 Dist Capital or Expense 12/23/2024 11 Damage Claims OH 3/13/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 3/26/2025 11 Private Work - No Co Asset 4/14/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 11/10/2025 11 Dist Capital or Expense 12/30/2024 11 Elect Annual Proj - DESG CT 4/14/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 12/27/2024 11 Dist Capital or Expense 1/22/2025 11 Damage Claims OH 2/4/2025 11 Damage Claims OH 9/15/2025 11 Dist Capital or Expense 4/28/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 4/30/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Dist Capital or Expense 1/7/2025 11 Dist Capital or Expense 4/24/2025 11 Elect Annual Proj - DESG CT 3/19/2025 11 Dist Capital or Expense Subsequent Close Date 2/13/2026 2/13/2026 1/22/2026 4/20/2026 3/16/2026 5/15/2026 2/13/2026 6/26/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 2/13/2026 6/26/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/14/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/14/2026 2/13/2026 5/15/2026 9/16/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 364310 Poles and Appurtenance 1,860 377 1,817 9,236 5,940 4,073 1,330 4,316 8,363 5,083 4,185 4,513 17,372 5,289 8,709 458 805 4,191 2,129 3,555 4,546 5,711 7,365 3,740 1,275 3,541 6,284 2,039 6,718 356 8,461 3,037 4,837 306 237 3,975 1,063 4,622 16,657 7,519 773 34,535 7,640 3,382 8,852 9,947 6,474 81,328 5,588 2,500 7,367 2,249 7,522 6,016 9,256 5,882 7,175 4,013 4,645 20,644 2,605 46,837 6,945 4,159 372 3,405 4,339 84 215 5,579 6,346 5,200 4,238 2,941 472 416 2,342 1,447 265 6,761 5,812 7,135 3,487 4,915 5,002 200 4,519 3,494 1,609 4,084 (52) 227 993 5,523 3,213 7,965 17,086 1,882 3,410 1,252 2,571 2,676 1,831 4,517 9,572 365000 Overhead Conductors, Device 366700 DB/UG Conduits and Vaults 1,256 829 1,462 367720 DB/UG Conductors and devices 886 1,797 3,795 3,268 959 966 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 88 369720 DB/UG Conductors and Devices 370470 Meter Equipment 701 176 451 3,398 1,445 870 1,106 3,515 260 1,679 82 282 613 1,504 764 1,849 643 271 599 1,464 929 2,676 5,029 1,952 200 99 5,047 178 2,232 3,794 2,052 2,149 253 1,269 521 3,428 106,289 1,419 682 738 2,741 4,296 1,396 43,513 303 1,597 1,663 1,223 998 850 351 306 503 1,540 238 212,569 5,535 2,354 222 4,049 2,145 1,604 158 271 79 4,962 289 555 924 2,258 (616) 800 8,815 1,675 472 333 9,141 157 908 1,313 3,143 146 524 864 484 160 676 1,622 29 1,684 1,305 1,158 1,927 (187) (547) 1,796 284 552 1,658 6,482 180 111,491 163,495 148 137,583 1,639 418 1,012 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,860 3,307 2,646 10,698 5,940 5,870 5,300 7,584 9,773 6,049 4,185 7,911 18,817 6,159 9,897 4,254 1,065 5,869 2,129 4,169 6,321 6,475 9,215 4,383 1,275 4,140 7,748 2,039 7,647 3,232 13,489 4,988 4,837 406 237 9,022 1,241 6,854 20,451 11,487 2,922 34,788 8,910 3,382 12,280 159,749 8,196 82,009 6,326 5,242 11,663 2,249 9,470 7,985 10,982 6,880 8,026 4,013 6,185 20,881 2,605 259,834 12,480 6,513 594 7,533 6,484 6,940 770 6,503 9,745 4,584 5,038 11,756 2,147 416 2,675 11,609 265 8,153 7,125 10,278 3,647 5,591 6,624 229 6,203 4,799 2,767 6,011 (787) 227 2,789 5,807 3,765 9,622 23,568 2,062 114,902 1,252 166,066 2,823 1,831 142,099 12,640
  7. Page 21 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 21 of 104 Work Order Number Description 80214666 DONE PRINT BJQ - WARREN, CORNWALL, 80214676 (BCW MATERIAL) *D&D*CD02444 Pole In 80214722 (BCW MATERIAL) *D&D*CD02444 Pole In 80214781 (BCW MATERIAL) *D&D*CD02444 Pole In 80214809 (BCW MATERIAL) *D&D*CD02444 Pole In 80214856 (BCW MATERIAL) *D&D*CD02444 Pole In 80214871 (BCW MATERIAL) *D&D*CD02444 Pole In 80215011 JFM-1P LINE EXTENSION - 40 BARCLARE 80215014 * PM-INT- 102024 - 85 TULIP DR MER 80215020 JMS- AVON 333 MONTEVIDEO RD NEW POL 80215022 MG-P#883 LISBON RD CANTERBURY-RPLCD 80215024 AC-40 ROUTE 37 SOUTH, SHERMAN-9A PO 80215029 OK TO CLOSE 12/19 - RSO - [LEFEBVRE 80215050 JMS-WEST HARTFORD POLE 102 REPLACE 80215062 DJM. 72 LUDLOW RD WESTPORT. OH 200A 80215076 WRTN NEEDS WORK LINWOOD( 60) 80215094 Talcottville Rd 548, Vernon. Replac 80215158 JFM-*POST CNSTR*-12/20/24 9A CAR VS 80215240 (BCW MATERIAL) *D&D*CD02444 Pole In 80215281 *D&D* Frontier Pole Inspection Pole 80215292 *D&D*CD02444 Pole Integrity Replace 80215315 *D&D* Frontier Pole Inspection Pole 80217289 JTR, 36 S MAIN ST, EAST GRANBY, 9A 80217304 9A -Car vs Pole - waiting on status 80217310 9A 10 Jackson Rd Plainfield P#3226 80217315 9A - CAR VS POLE 2008-S - APPROVED 80217325 GDK 9A 12.20.24 RSO LEMIEUX HOPMEAD 80217326 UNCASVILLE, MARIE, 9, KEVIN O'CONNO 80217337 GP - REPLACE POLE 277 - CLINTON WTB 80217348 9A - CAR VS POLE 5808s - APPROVED 3 80217369 (BCW MATERIAL) *D&D*CD02444 Pole In 80217414 MCB - WTG FOR PD RPT 12/31/24 (TH) 80217419 *D&D*CD02444 Pole Integrity Replace 80217448 *D&D* Frontier Pole Inspection Pole 80217603 WRTN - DM - GLASTONBURY, NAUBUC, 0, 80217658 PM-MOUNT PLEASANT ST MERIDEN-POST C 80217678 Issue Pole DJM. 28 PIN OAK CT WESTP 80217691 9A- CAR VS POLE - APPROVED 10/9 80217701 PD REPORT ORDERED 1/2/25-9A CAR VS 80217704 9A - CAR VS POLE 80217716 *D&D* Frontier Inspection Pole Shif 80217718 *D&D*CD02444 Pole Integrity Replace 80217729 9A - LD- 591 W MAIN ST, NEW BRITAIN 80217735 PRINT JSG - COLEBROOK, CHURCH HILL, 80217751 9A TC 189 TACONIC RD, GRN: P#72529 80218053 PR 10/6 MDB - EAST CANAAN, NORFOLK, 80218329 12/23/24, RSO, JK>POLE 440--REPLACE 80218335 9A CAR VS POLE - APPROVED 3/20/26 80218367 NONBILLABLE - LOW WIRES (TH) 12/23 80218390 9A - CAR VS POLE - APPROVED 2/21/20 80218918 *D&D* 609 N MAIN ST, SOUTHINGTON 80218960 KTI CDOT 34-351 - Install new pole 80219235 WRTN--JK>POLE 4790--FTR TO SET STUB 80219247 WRTN--JK>P-4100--REPL 3PH POLE TOP, 80219286 P6794 REPLACE CAN WITH 50KVA 275 MI 80219944 *D&D* Frontier Pole Inspection Pole 80219945 *D&D* Frontier Pole Inspection Pole 80219951 SD 49 DAY ST /WASHIGTON ST SEYMOUR 80219955 Jpt-94 Candy Ln Bristol P11670 - Rp 80219961 Jpt-491 James P. Casey Rd Bristol P 80219963 9A* EVENT 5561879 12/25(TURNOVER80219965 all work complete - 9A* (TURNOVER80219973 fcomp on 12/26 9A - 12/25 - RSO - [ 80219987 9A 12/24 ROUTE 202(289) -- 2952, 80219989 South Grand St 426, Suffield. Front 80220008 WRTN - DM - PORTLAND RD MARLBOROUGH 80220048 TL - WOODBRIDGE RD, #45 NIANTIC // 80220098 HEL WQ 4/6/22 MAIN ( 218) ST S -80220109 P#1571 WILSONVILLE RD THOMPSON HBV 80220239 MATERIAL RM, (CP) 5 GOOD HILL RD 80220296 (BCW MATERIAL) *D&D*CD02444 Pole In 80220376 1.09.25 PD REQ AB -EVW - 9A - 12/24 80220403 MATERIAL DJM. EASTON( 127) RD 80220414 BC - CD02537-01 - Madison SS - 30R1 80220415 9A CAR VS POLE - APPROVED 3/20/2026 80220448 *D&D*CD02444 Pole Integrity Replace 80220588 203 DONE--GRISWOLD, BURTON, 41, Jam 80220852 1.13.25 DSINPRG (AB) 12/28/24 9A TU 80220854 9A - CAR VS FRONTIER POLE 809 - APP 80220860 9A - CAR VS POLE 923-S - APPROVED 2 80220867 MCB - W F PD RPT 12/31/24 (TH) 12/ 80220871 *ALL WORK COMPLETE - GP P#1375 19 L 80220876 *POST CONSTRT* 12/28 9A CAR VS POLE 80220878 *****ALL WORK COMPLETE*****9A* TURN 80220880 JD; 9A - 983 E MAIN ST, STAMFORD 80220890 12-31-24 PR -SL - 9A - 670 Yalesvil 80220904 **POST CONSTRUCTION** 1095 MAIN S 80220925 JTR, 701 MARSHALL PHELPS, WINDSOR, 80220936 DG P#864 WILSONVILLE RD THOMPSON RP 80220944 *material*MM - 14 STURGES RDG RD, W 80220991 *D&D*CD02444 Pole Integrity Replace 80221007 WO 19652387, INT-102521, DG UPGRADE 80221044 12/30/24 TURNOVER 141 PAPER MILL R 80221046 (BCW MATERIAL) *D&D*CD02444 Pole In 80221047 PRINT EVW - 84 Sugar Hill Rd, Salis 80221073 JFM- POST CNSTR***TURNOVER*** 115 G 80221092 MM 21 Sam CHikan Rd Griswold P#456 80221096 *D&D* Frontier Pole Inspection Pole 80221127 *D&D*CD02444 Pole Integrity Replace 80221133 (BCW MATERIAL) *D&D*CD02444 Pole In 80221192 *D&D* Frontier Pole Inspection Pole 80221294 APPRENTICES MPB; 12/30/24 RAILTREE 80221315 CAR VS POLE-APPROVED 4/1/2026 80221319 9A CAR VS POLE - DUPLICATE TO FWO#8 80221322 TURNOVER - 12/30 - AWC - LEWIS(41) in-service date work order type 2/21/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 2/12/2025 11 Elect Annual Proj - DESG CT 1/3/2025 11 Elect Annual Proj - DESG CT 1/15/2025 11 Dist Capital or Expense 12/23/2024 11 Damage Claims OH 1/7/2025 11 Dist Capital or Expense 1/10/2025 11 Elect Annual Proj - DESG CT 2/7/2025 11 Dist Capital or Expense 3/17/2025 11 Corrective Maint OH Svc 1/30/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 1/2/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 1/9/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/13/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 3/20/2025 11 Damage Claims OH 1/10/2025 11 Damage Claims OH 3/11/2025 11 Damage Claims OH 6/25/2025 11 Elect Annual Proj - DESG CT 2/5/2025 11 Corrective Maint OH Svc 3/18/2025 11 Damage Claims OH 3/3/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 1/6/2025 11 Damage Claims OH 4/23/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 1/4/2025 11 Damage Claims OH 1/15/2025 11 Dist Capital or Expense 3/4/2025 11 Damage Claims OH 1/28/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 3/12/2025 11 Street Light - DESG CT 3/4/2025 11 Dist Capital or Expense 5/29/2024 11 Elect Annual Proj - DESG CT 2/4/2025 11 Dist Capital or Expense 4/21/2025 11 Damage Claims OH 1/6/2025 11 Damage Claims OH 1/31/2025 11 Damage Claims OH 5/1/2023 11 Elect Annual Proj - DESG CT 9/23/2025 11 Dist Capital or Expense 4/14/2023 11 Elect Annual Proj - DESG CT 5/19/2023 11 Elect Annual Proj - DESG CT 6/28/2022 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 2/4/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 1/6/2025 11 Elect Annual Proj - DESG CT 1/21/2025 11 Damage Claims OH 1/28/2025 11 Dist Capital or Expense 1/31/2025 11 Damage Claims OH 4/15/2025 11 Damage Claims OH 4/16/2025 11 Dist Capital or Expense 1/22/2025 11 Dist Capital or Expense 6/14/2022 11 Elect Annual Proj - DESG CT 2/23/2023 11 Elect Annual Proj - DESG CT 5/17/2022 11 Damage Claims OH 2/21/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 8/26/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 6/17/2025 11 Dist Capital or Expense 7/6/2022 11 Elect Annual Proj - DESG CT 1/24/2025 11 Damage Claims OH 4/8/2025 11 Damage Claims OH 1/10/2025 11 Damage Claims OH 1/3/2025 11 Damage Claims OH 2/12/2025 11 Elect Annual Proj - DESG CT 1/8/2025 11 Damage Claims OH 1/27/2025 11 Dist Capital or Expense 2/5/2025 11 Damage Claims OH 1/7/2025 11 Damage Claims OH 3/13/2025 11 Elect Annual Proj - DESG CT 1/6/2025 11 Dist Capital or Expense 1/6/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 1/31/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 1/3/2025 11 Elect Annual Proj - DESG CT 1/10/2025 11 Dist Capital or Expense 1/14/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 2/18/2025 11 Damage Claims OH 8/29/2025 11 Damage Claims OH 3/25/2025 11 Elect Annual Proj - DESG CT Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 364310 Poles and Appurtenance 166 4,882 5,991 2,263 8,130 4,907 6,324 323 (275) 6,151 13,751 8,048 11,907 3,010 5,722 4,257 1,385 1,512 5,411 577 5,436 328 10,794 4,281 2,532 6,744 12,251 21 5,200 5,904 3,560 1,218 4,132 89 1,867 11,073 5,416 5,201 908 8,996 1,944 2,720 1,690 1,028 2,618 6,092 1,369 7,169 7,390 10,462 736 3,834 2,186 7 (164) 146 194 1,733 1,356 3,914 7,398 1,476 10,468 674 1,568 11,175 4,939 264 3,844 4,418 5,941 6,572 6,076 7,919 22,798 1,998 955 6,265 2,688 1 11,002 5,621 11,450 9,557 8,921 942 2,920 2,976 2,238 3,042 2,546 2,592 14,475 7,790 150 764 59 38 2,419 8,929 212 343 7,540 1,551 3,007 365000 Overhead Conductors, Device 1,735 3,041 1,891 1,405 675 740 18,308 (523) 118 5,484 124 16,832 1,567 1,061 203 159 7,250 2,237 71 1,920 393 11,557 120,931 4,246 415 1,628 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 150 (38) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 465 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 133 334 278 337 3,440 123 5,615 164 436 2,066 23 2,156 3,649 527 247 257 3,563 1,958 1,381 6,228 731 2,025 488 3,605 180 514 105 1,269 216 256 4,047 1,955 8,527 1,632 9,681 310 2,239 398 183 (262) 1,529 220 955 246 147 273 300 8,138 2,394 2,870 1,309 2,182 974 456 428 134 105 1,422 3,118 12,080 543 118,968 3,036 197 98 1,114 11,164 2,447 322 211 3,591 1,957 1,467 4,246 1,321 1,004 7,352 148,982 696 832 933 1,021 41 227 1,054 1,990 450 1,755 3,940 1,025 190 2,421 1,571 1,949 3,968 635 94 359 348 405 119 138 493 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 631 6,618 9,031 4,154 9,534 5,582 7,065 18,914 (836) 6,268 19,569 8,172 28,739 4,577 7,399 4,460 1,545 12,203 7,648 649 7,479 721 27,965 125,212 6,943 9,661 13,879 44 7,356 5,904 3,560 5,355 4,659 335 5,730 14,816 9,157 6,687 7,136 9,728 4,184 2,720 1,946 1,028 2,618 21,762 3,323 15,696 7,390 12,701 1,134 4,017 2,186 18 1,666 366 1,149 10,117 1,503 3,914 9,791 1,476 13,338 2,411 3,749 12,150 5,726 264 3,948 5,939 9,058 23,356 6,619 126,887 25,834 1,998 14,287 8,711 3,010 1 12,469 5,621 16,716 10,878 9,925 8,294 151,902 3,713 3,069 4,695 2,546 4,005 16,465 8,240 2,254 4,704 1,084 228 2,419 11,755 1,902 2,291 11,645 2,186 3,101
  8. Page 22 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 22 of 104 Work Order Number Description 80221327 GP - Replace Pole - 24 WALKER AVENU 80221331 9A - Car vs. Pole - APPROVED 4/3/26 80221340 APPT 2/5 PM-232 MILL ST BERLIN-MLC80221454 (BCW MATERIAL) *D&D*CD02444 Pole In 80221477 9A - Car vs Pole - APPROVED 4/16/25 80221510 (BCW MATERIAL) *D&D*CD02444 Pole In 80221524 *D&D* MA-Conv#1670175-MakeReadyNonR 80221525 DG P#2509 THOMPSON RD THOMPSON FRNT 80221557 *D&D*CD02444 Pole Integrity Replace 80221591 (BCW MATERIAL) *D&D*CD02444 Pole In 80221611 Jpt-240 Sonstrom Rd Bristol P12195 80221624 *D&D*CD02444 Pole Integrity Replace 80221626 **AVON, AYRSHIRE, 71, NEW SVC OH/UG 80221655 DONE PRINT BJQ, LTCH, P #2416 (166) 80221688 DONE-BJQ - 12/30 - TREE DOWN -- POL 80222747 MATERIAL - KD-EVENT #4733115 SET NE 80222795 1060 HUNTINGDON AVE, WATERBURY - NE 80223689 TURNOVER E#5564550 1/1/25 2 HINE H 80223693 AC-12 BRIGGS HILL RD, SHERMAN-POST 80223701 DG P#3057 THOMPSON HILL RD THOMPSON 80223703 WRTN - DM - 9A*1/1 - AWC - NEIPSIC( 80223759 PRINT BJQ - 12/30 - RSO - [GILBEJM] 80223772 !!! AE/TC 28 PUTNAM HILL, GRN: P#76 80223793 (BCW MATERIAL) *D&D*CD02444 Pole In 80223855 MG-P#-365-P#367POMFRET RD (459) BRO 80223863 *D&D*CD02444 Pole Integrity Replace 80223884 JOB COMPLETE IN FIELD VJT - TURNOVE 80223963 Pend Meters, BWG-1190 Kennedy Road, 80224074 BC - CD01576 - 47N3 Overload - Inst 80224100 WM; NEW MILFORD, STILSON HILL, 151, 80224115 on ld APPT 8/8 CHECK SCN Repl. Defe 80224173 DG P#439 RAWSON RD WOODSTOCK FRNTR 80224175 CC; WASHINGTON DEPOT, WORCHESTER, 7 80224196 *D&D* Frontier Pole Inspection Pole 80224222 *D&D* KG Conv#1667190-RegularMakeRe 80224514 (BCW MATERIAL) *D&D*CD02444 Pole In 80224533 PD PROGRESS-12-09-2025 - STATE PD 80224995 DB-CD01765-05, remove 11Y3/11Y7 row 80224998 APPRENTICES BM; Southbury, Strongto 80225011 MR; SET STUB POLE & ANC, REMOVE TRE 80225075 NEWTOWN TPKE, P 7351, WESTPORT CT 80225138 *WTBY AWC*COMP 7/20*108 Rado Dr, Na 80225198 CD01912 Segment 01, LAG, Breakneck 80225204 CD01912 Segment 02, LAG, Old Watert 80225208 TURNOVER 1/2/25 E 5568003 152 LOPU 80225281 *D&D*CD02444 Pole Integrity Replace 80225292 *D&D* Frontier Pole Inspection Pole 80225348 * MAR - Replace Damaged OH Svc& Ins 80225608 *D&D*CD02444 Pole Integrity Replace 80225652 (BCW MATERIAL) *D&D*CD02444 Pole In 80225687 MM 169 Norman Rd Griswold P#685 rep 80225697 DJM. 14 PUNCH BOWL DR WESTPORT. OH 80225789 (BCW MATERIAL) *D&D*CD02444 Pole In 80225831 (BCW MATERIAL) *D&D*CD02444 Pole In 80225850 AE/JD; 172 URSULA PL STAMFORD; 3PH 80225852 PRINT JFC - MORRIS, BANTAM LAKE, 44 80225899 GC - UNCASVILLE, RAYMOND HILL, 162 80226016 9/30 ????EARLY POLE SET; WINDHAM, p 80226059 APPT 11/29 MAR - 400amp Upgrd& repl 80226087 Appr Grp JTR, 20 Eastern Park Rd, E 80226154 *D&D* Frontier Pole Inspection Pole 80226160 *D&D*CD02444 Pole Integrity Replace 80226169 (BCW MATERIAL) *D&D*CD02444 Pole In 80226239 TURNOVER 1/5/2025 E 5569186, 55692 80226240 *****ALL WORK COMPLETE*****1/4/24-80226329 WRM -JPT-12 Powder Hill Rd Middlefi 80226350 94 Great Harbor Rd, Guilford-shift 80226364 1.06.25 PD W/# ORDRD AB-EVW - 9A CA 80226402 AE/TC 165 JOHN ST, GRN: INSTALL 100 80226406 15DD 4/4 Jpt-65 Cronin St Bristol P 80226523 LD-865 W MAIN - NEW BRITAIN- P# 753 80226561 comp-1/5/25 9A TURNOVER 435 EAST ST 80226584 Jpt-200 Terryville Rd Bristol - 3rd 80226587 *D&D*CD02444 Pole Integrity Replace 80226729 WRTN--JK>POLE 623--FTR TO REPL 1 PO 80226744 RL:144 RAILROAD AVE:GRN: 800 AMP 27 80226836 (BCW MATERIAL) *D&D*CD02444 Pole In 80226851 BWG-BRIAN(18) DR -- 222, BOLTON, CT 80226895 (BCW MATERIAL) *D&D*CD02444 Pole In 80226923 *D&D*CD02444 Pole Integrity Replace 80226925 NONBILLABLE (TH) 1/6/25 9A 43 MEADO 80226966 SC417 WYLIE SCHOOL RD VOLUNTOWN R-3 80226972 MJ -1261 N Colony Rd 80227093 (BCW MATERIAL) *D&D*CD02444 Pole In 80227099 *SYS PROJ* CD02444 Pole Integrity R 80227114 (BCW MATERIAL) *D&D*CD02444 Pole In 80227122 *EH AWC* CD02444 Pole Integrity Rep 80227162 CD02444 Pole Integrity Replacement 80227165 (BCW MATERIAL) *D&D*CD02444 Pole In 80227195 *D&D*Frontier Pole Inspection Pole 80227196 (BCW MATERIAL) *D&D*CD02444 Pole In 80227206 (BCW MATERIAL) *D&D*CD02444 Pole In 80227221 EVW - 16 Six Rod Rd, Falls Village 80227414 E.P.-135 WATER STREET, STONINGTON80227442 PR 8/30 JFC - DUDLEYTOWN RD-- P6809 80227455 KTI AC-34 SHORTWOODS RD, NEW FAIRFI 80227465 CAR VS POLE - APPROVED 5/12/26 80227471 JTR, 18 Brian Dr, Bolton, Replace P 80227474 DONE BJQ - 12/29 - RSO - [CHANND] 80227494 *SYS PROJ* CD02444 Pole Integrity R 80227524 DG P#2023 145 PERRIN RD WOODSTOCK D 80227702 NONBILLABLE - 2YR STATUE (TH) 4/21/ 80227708 (BCW MATERIAL) *D&D*CD02444 Pole In 80227713 *ASP* CD02444 Pole Integrity Replac 80227716 *1CS* WRTN NEEDS LINE Ap Gates Rd / in-service date work order type 2/12/2025 11 Damage Claims OH 1/29/2025 11 Damage Claims OH 2/5/2025 11 Corrective Maint OH Svc 4/25/2025 11 Dist Capital or Expense 3/31/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 1/22/2025 11 Damage Claims OH 7/7/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/31/2025 11 Dist Capital or Expense 1/6/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/18/2023 11 Elect Annual Proj - DESG CT 2/24/2025 11 Dist Capital or Expense 1/7/2025 11 Elect Annual Proj - DESG CT 1/21/2025 11 Elect Annual Proj - DESG CT 1/6/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/3/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 6/7/2022 11 Damage Claims OH 5/8/2023 11 Elect Annual Proj - DESG CT 6/30/2023 11 Asset Mgmt - Specific DESG CT 6/13/2025 11 Dist Capital or Expense 8/9/2022 11 Elect Annual Proj - DESG CT 1/9/2025 11 Elect Annual Proj - DESG CT 6/27/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 3/4/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 4/13/2022 11 Elect Annual Proj - DESG CT 4/13/2023 11 Elect Annual Proj - DESG CT 5/15/2025 11 Elect Annual Proj - DESG CT 7/21/2025 11 Elect Annual Proj - DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 1/14/2025 11 Elect Annual Proj - DESG CT 9/15/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 5/20/2022 11 Street Light - DESG CT 4/22/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 6/18/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 4/2/2025 11 Corrective Maint UG Svc 8/16/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 11/29/2023 11 Asset Mgmt - Specific DESG CT 7/17/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 2/4/2025 11 Dist Capital or Expense 5/23/2022 11 Elect Annual Proj - DESG CT 5/18/2022 11 Elect Annual Proj - DESG CT 1/7/2025 11 Dist Capital or Expense 6/2/2025 11 Corrective Maint UG Svc 3/26/2025 11 Dist Capital or Expense 1/8/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/28/2025 11 Corrective Maint OH Svc 4/22/2025 11 Dist Capital or Expense 7/20/2022 11 Elect Annual Proj - DESG CT 12/21/2022 11 Elect Annual Proj - DESG CT 6/17/2025 11 Dist Capital or Expense 3/25/2025 11 Corrective Maint OH Lines 6/13/2025 11 Dist Capital or Expense 11/10/2025 11 Dist Capital or Expense 3/28/2025 11 Damage Claims OH 9/2/2022 11 Elect Annual Proj - DESG CT 9/1/2022 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 1/21/2025 11 Elect Annual Proj - DESG CT 6/1/2022 11 Elect Annual Proj - DESG CT 9/12/2022 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 1/9/2025 11 Damage Claims OH 1/10/2025 11 Elect Annual Proj - DESG CT 1/16/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 5/8/2025 11 Elect Annual Proj - DESG CT 5/1/2025 11 Damage Claims OH 6/13/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense Subsequent Close Date 7/17/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 8/26/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 364310 Poles and Appurtenance 10,534 6,549 1,661 6,012 3,286 2,204 10,763 2,535 4,754 5,428 6,375 7,542 29 630 504 4,817 5,502 8,886 9,313 11,181 (664) 12,842 5,850 11,542 129 4,657 4,024 4,606 4,566 6,233 3,542 755 50 152 8,323 5,336 4,073 6,700 436 7,528 720 316 56,655 9,915 18,577 3,323 373 3,678 16,694 7,467 7,521 2,945 5,814 1,744 2,480 (59) 323 633 (39) 3,297 76 3,870 5,948 24,630 2,101 2,298 206 4,276 1,442 4,995 2,169 8,707 1,122 4,929 2,807 4,237 7,614 702 6,500 1,501 6,717 2,602 3,480 5,504 5,093 5,276 4,245 7,775 4,545 333 4,157 3,046 7,836 2,880 601 4,026 1,389 25,896 13,443 8,788 (46) 491 6,809 8,483 3,339 365000 Overhead Conductors, Device 2,586 17,514 706 4,173 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 1,058 635 219 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 2,819 248 322 5,815 3,150 1,638 745 3,987 2,676 17 110 564 224 92 5,566 2,401 9,321 (26) 678 239 1,287 (2,287) 735 2,459 1,492 103 1,643 144 5,175 11,450 2,353 64,194 2,604 305 183 3,282 814 3,844 311 32,223 590,535 45 5,166 174 1,476 679 28 169 226,965 285 409 92,471 691 349,172 49,742 3,627 175 704 2,794 6,488 301 17 250 1,054 1,867 2,279 1,960 1,170 760 1,154 7,345 368 89 327 1,286 9,031 2,269 207 (8) 831 5,813 2,817 435 49 1,485 1,399 396 842 1,607 (558) 981 120 (48) 73 25 38 619 278 508 293 1,039 1,953 2,693 4,146 4,044 1,674 282 2,632 225 797 5,411 12,361 2,401 107 1,733 9,395 729 489 16 234 476 128 1,540 1,758 727 582 821 901 1,792 703 2,049 224 255 15,334 4,951 13,232 22,149 1,555 (368) 239 851 1,001 1,226 74 867 364 719 308,059 52,112 7,791 179 (31) (151) 197 85 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 14,177 27,517 2,834 10,507 3,286 2,204 16,578 5,909 6,393 6,173 10,362 10,218 138 740 1,069 4,817 21,041 11,526 9,313 12,468 893 13,577 8,309 13,345 233 6,300 4,169 47,169 606,551 10,237 67,736 4,038 598 335 11,605 6,150 4,073 233,664 721 7,528 1,129 102,069 406,819 59,674 22,454 3,499 1,077 4,732 18,561 10,114 9,966 5,284 6,574 4,184 20,463 (617) 3,647 983 (95) 3,297 76 3,870 6,779 30,443 4,918 2,771 875 6,039 5,857 6,727 2,462 9,746 3,075 7,622 6,953 18,895 9,288 1,000 9,366 1,726 7,515 10,030 15,969 5,504 6,851 6,003 4,826 8,596 5,447 333 5,949 3,749 10,827 3,104 856 19,360 6,704 39,847 395,763 10,342 (595) 8,897 7,660 9,485 4,649
  9. Page 23 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 23 of 104 Work Order Number Description in-service date work order type 80227717 PRINT BJQ - WO 19771749-INT-1030526/26/2025 11 Elect Annual Proj - DESG CT 80227731 *ICS* written01/07/25 Johnson Rd Co 4/14/2025 11 Dist Capital or Expense 80227738 *SYS PROJ* CD02444 Pole Integrity R 7/7/2025 11 Dist Capital or Expense 80227742 1/6/25 OLD WOODBURY (90) RD -- G360 1/7/2025 11 Elect Annual Proj - DESG CT 80227761 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80227767 *ICS* WRTN NEEDS LINE Warner Rd Eas 4/17/2025 11 Dist Capital or Expense 80227778 INT-101153 NORTH STONINGTON, OLD C 8/18/2025 11 Dist Capital or Expense 80227779 *ASP* CD02444 Pole Integrity Replac 6/3/2025 11 Dist Capital or Expense 80227790 RM - 12 LAUREL LAKE W, WESTON CT!! 1/16/2025 11 Elect Annual Proj - DESG CT 80227810 *SYS PROJ* CD02444 Pole Integrity R 7/7/2025 11 Dist Capital or Expense 80227818 CD02444 Pole Integrity Replacement 4/28/2025 11 Dist Capital or Expense 80227835 *SYS PROJ* CD02444 Pole Integrity R 12/15/2025 11 Dist Capital or Expense 80227840 CD02444 Pole Integrity Replacement 5/21/2025 11 Dist Capital or Expense 80227847 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80227856 PRINT EVW - 23 Canaan Valley Rd, No 5/28/2025 11 Dist Capital or Expense 80227879 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227902 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227910 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227923 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227937 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227958 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227963 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80227983 *SYS PROJ* CD02444 Pole Integrity R 7/10/2025 11 Dist Capital or Expense 80227993 CD02444 Pole Integrity Replacement 5/15/2025 11 Elect Annual Proj - DESG CT 80228028 GDK INT-95639 WO# 18013696 WINDSOR, 2/26/2025 11 Elect Annual Proj - DESG CT 80228033 *D&D*Frontier Pole Inspection Pole 2/5/2025 11 Dist Capital or Expense 80228074 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80228085 *ASP* CD02444 Pole Integrity Replac 3/28/2025 11 Dist Capital or Expense 80228172 1/7/25, RSO/AWC, JK>TREE V FTR POLE 2/7/2025 11 Elect Annual Proj - DESG CT 80228177 LD - P5032 - OLD HATCHERY RD, BERL 1/16/2025 11 Elect Annual Proj - DESG CT 80228183 WRTN - DM - 1/8 WINDHAM (305) AVE C 2/3/2025 11 Dist Capital or Expense 80228210 *EH AWC* CD02444 Pole Integrity Rep 5/15/2025 11 Dist Capital or Expense 80228372 CD02444 Pole Integrity Replacement 5/8/2025 11 Dist Capital or Expense 80228384 *ASP* CD02444 Pole Integrity Replac 6/3/2025 11 Dist Capital or Expense 80228438 *SYS PROJ* CD02444 Pole Integrity R 9/16/2025 11 Dist Capital or Expense 80228553 CAR VS POLE- AWAITING POLICE REPORT 7/21/2022 11 Damage Claims OH 80228629 Asplundh - 3/24 WELLS ( 127) RD -7/8/2022 11 Elect Annual Proj - DESG CT 80228633 DB-CDOT 44-156/CD02031-01 Stage1A, 10/24/2023 11 Asset Mgmt - Specific DESG CT 80228642 DB-CDOT 44-156/CD02031-02 Stage1A, 1/2/2024 11 Asset Mgmt - Specific DESG CT 80228649 DB-CDOT 44-156/CD02031-02 Stage1B, 5/1/2024 11 Asset Mgmt - Specific DESG CT 80228728 *D&D*Frontier Pole Inspection Pole 3/11/2025 11 Dist Capital or Expense 80228744 *SYS PROJ* CD02444 Pole Integrity R 7/24/2025 11 Dist Capital or Expense 80228775 JTR, 182 Case St , Granby, 9A - Shi 3/21/2025 11 Dist Capital or Expense 80228778 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80228779 *SYS PROJ* CD02444 Pole Integrity R 9/25/2025 11 Dist Capital or Expense 80228798 *D&D* KG Conv#1667190-RegularMakeRe 10/28/2025 11 Dist Capital or Expense 80229007 KILLINGWORTH - 1PH UG LINE EXT. - R 11/19/2025 11 Dist Capital or Expense 80229028 DONE PRINT for Early Pole Set - BJQ 5/7/2025 11 Corrective Maint OH Svc 80229046 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80229050 *D&D* KG Conv#1667190-RegularMakeRe 12/1/2025 11 Dist Capital or Expense 80229054 Appr Grp Bebbington Rd 287, Ashford 3/11/2025 11 Dist Capital or Expense 80229064 DONE PRINT CRP - 1/7 [CROWLCJ] - PO 1/17/2025 11 Dist Capital or Expense 80229069 Appr Grp Pompey Hollow Rd 118, Ashf 3/26/2025 11 Dist Capital or Expense 80229071 (BCW MATERIAL) *D&D*CD02444 Pole In 4/22/2025 11 Dist Capital or Expense 80229074 Appr Grp Bebbington Rd 236, Ashford 3/11/2025 11 Dist Capital or Expense 80229077 PD-384 WILLETTS AVE EXT WTFD/LINE E 12/4/2025 11 Dist Capital or Expense 80229124 WALES( 26) RD -- 3662, STAFFORD SPG 1/23/2025 11 Corrective Maint OH Lines 80229135 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80229190 MATERIAL ASP 4/21 MCB - 56 CHAMBERS 11/18/2022 11 Elect Annual Proj - DESG CT 80229218 Priority Pole P#1275 Sunset Lane Cl 4/22/2022 11 Elect Annual Proj - DESG CT 80229310 *D&D*Frontier Pole Inspection Pole 7/24/2025 11 Dist Capital or Expense 80229312 *D&D*CD02444 Pole Integrity Replace 11/14/2025 11 Dist Capital or Expense 80229317 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80229318 CD02444 Pole Integrity Replacement 5/14/2025 11 Dist Capital or Expense 80229339 *D&D*Frontier Pole Inspection Pole 3/19/2025 11 Dist Capital or Expense 80229361 Essex, 33 Maple Ave/Remove tree guy 5/29/2025 11 Dist Capital or Expense 80229365 **MM - 82 INDIAN HILL, WILTON - UPG 3/4/2025 11 Corrective Maint OH Svc 80229366 WRTRN COMPLETE ACKLEY CEMETERY (40) 2/11/2025 11 Elect Annual Proj - DESG CT 80229431 COMPLETE 4/19/22 HIT & RUN 9A TURNO 11/26/2024 11 Dist Capital or Expense 80229662 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80229739 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80229746 1/7/25 BOOTH RD ROXBURY (POST CONST 1/31/2025 11 Elect Annual Proj - DESG CT 80229751 TURNOVER 1/08/25 BLACKVILLE( 1/31/2025 11 Elect Annual Proj - DESG CT 80229757 *** TURNOVER 1/7/25 WEST ST, SEYMO 2/7/2025 11 Elect Annual Proj - DESG CT 80229769 PRINT BJQ - 1/7 (CROWLCJ) 2018:POPP 2/28/2025 11 Dist Capital or Expense 80229776 *SYS PROJ* CD02444 Pole Integrity R 10/30/2025 11 Dist Capital or Expense 80229781 ROB OK TO APPROVE*ALL WORK COMPLETE 3/19/2025 11 Elect Annual Proj - DESG CT 80229797 *SYS PROJ* CD02444 Pole Integrity R 10/30/2025 11 Dist Capital or Expense 80229810 BJQ - 01/7 (Boisclair) 3460:MIKE:RD 1/30/2025 11 Dist Capital or Expense 80229971 CD02444 Pole Integrity Replacement 5/21/2025 11 Dist Capital or Expense 80230036 JTR, CD02136, Warrenville Rd, Mansf 11/25/2025 11 Dist Capital or Expense 80230052 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80230066 CD02444 Pole Integrity Replacement 5/14/2025 11 Dist Capital or Expense 80230068 *SYS PROJ* CD02444 Pole Integrity R 10/23/2025 11 Dist Capital or Expense 80230069 WRTN - DM - 1/7 9A HEBRON AVE GLAST 1/30/2025 11 Dist Capital or Expense 80230070 TL - SMITH AVE, #38 NIANTIC // REPL 5/20/2025 11 Dist Capital or Expense 80230071 CD02444 Pole Integrity Replacement 4/29/2025 11 Dist Capital or Expense 80230077 *SYS PROJ* CD02444 Pole Integrity R 8/5/2025 11 Dist Capital or Expense 80230090 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80230094 *D&D*CD02444 Pole Integrity Replace 7/30/2025 11 Elect Annual Proj - DESG CT 80230097 CD02444 Pole Integrity Replacement 4/28/2025 11 Dist Capital or Expense 80230101 CD02444 Pole Integrity Replacement 6/2/2025 11 Dist Capital or Expense 80230321 *SYS PROJ* CD02444 Pole Integrity R 7/8/2025 11 Dist Capital or Expense 80230330 *SYS PROJ* CD02444 Pole Integrity R 7/10/2025 11 Dist Capital or Expense 80230331 SMD - 1/7/25 ACME(139) DR -- 28060 2/28/2025 11 Dist Capital or Expense 80230356 MG-P#1431-INT-103267- CANTERBURY, W 2/4/2025 11 Elect Annual Proj - DESG CT 80230380 *SYS PROJ* CD02444 Pole Integrity R 4/14/2025 11 Dist Capital or Expense 80230386 WORK COMPLETED 776:LORDS:HWY:WESTON 1/9/2025 11 Elect Annual Proj - DESG CT 80230417 CD02444 Pole Integrity Replacement 4/23/2025 11 Dist Capital or Expense 80230422 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80230426 *SYS PROJ* CD02444 Pole Integrity R 4/9/2025 11 Dist Capital or Expense 80230429 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80230432 (BCW MATERIAL) *D&D*CD02444 Pole In 6/13/2025 11 Dist Capital or Expense 80230435 *SYS PROJ* CD02444 Pole Integrity R 4/9/2025 11 Dist Capital or Expense 80230441 *D&D*CD02444 Pole Integrity Replace 10/6/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 364310 Poles and Appurtenance (72) 8,177 3,982 3,238 5,779 4,352 178 4,334 955 8,655 2,760 52,915 2,896 59 130 2,190 2,269 2,190 14,526 6,877 1,149 78 6,650 9,686 (389) 207 83 2,350 616 4,129 1,143 5,923 1,363 5,497 10,957 2,001 5,892 36,247 117,480 3,474 654 6,377 3,448 5,572 8,800 6,924 2,697 1,982 3,708 1,502 544 2,279 2,131 4,154 594 4,545 516 5,440 12,680 1,371 153 833 4,915 5,031 175 455 7,244 5,939 9,639 5,587 5,262 1,055 5,610 1,671 715 4,832 8,672 11,624 756 3,342 35,252 5,629 3,542 5,898 2,711 307 2,548 4,709 2,797 3,154 4,710 3,416 5,656 4,472 7,986 1,680 10,348 1,784 5,939 6,269 1,161 8,782 7,119 1,004 1,207 365000 Overhead Conductors, Device (113) 2,615 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead (57) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 1,154 660 770 276 290 18 1,510 1,653 1,405 291 470 186 1,603 186 2,035 966 104 251 737 1,697 (326) 546 230 56 460 588 320 (39) 907 613 7,777 2,182 769 65,871 79,164 1,303 1,438 2,230 2,062 1,740 3,315 1,995 1,730 22 1,183 2,242 10,166 569 70 629 74 239 55 492 465 18 449 10,753 535 306 833 1,537 334 4,998 198 1,883 3,528 66,839 13,742 81 532 124 43 886 846 1,517 1,982 210 62 1,577 2,222 7,605 1,078 1,487 310 595 468 582 1,857 18,064 7,308 300 1,600 156,140 774 274 2,330 387 888 499 153 2,333 2,693 297 537 150 342 20 44 231 3,147 3,063 713 432 3,811 34 1,029 4,849 35 (159) 427 432 850 123 417 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total (243) 10,792 3,982 4,391 5,779 5,012 1,515 4,334 973 10,165 2,760 54,568 4,301 349 1,025 2,376 3,872 2,376 16,561 7,843 1,149 329 7,387 11,382 (753) 753 312 2,406 1,076 4,717 1,143 6,831 1,976 5,497 18,734 4,184 6,661 102,189 208,621 7,900 2,092 8,607 5,510 7,331 12,115 9,368 15,672 2,525 3,708 2,036 850 2,279 2,964 5,691 927 90,123 1,327 7,324 16,375 1,371 1,101 1,680 6,432 7,014 385 455 10,170 8,315 19,936 6,666 7,046 1,903 6,205 2,139 1,297 6,839 26,737 19,273 1,075 4,942 191,437 6,403 3,816 8,228 3,098 1,844 2,548 10,190 2,797 3,154 4,710 6,479 5,656 4,472 8,699 2,147 14,160 1,818 6,809 11,118 1,161 8,782 7,546 1,004 1,763
  10. Page 24 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 24 of 104 Work Order Number Description 80230444 *SYS PROJ* CD02444 Pole Integrity R 80230453 *SYS PROJ* CD02444 Pole Integrity R 80230459 (BCW MATERIAL) *D&D*CD02444 Pole In 80230464 *SYS PROJ* CD02444 Pole Integrity R 80230470 *SYS PROJ* CD02444 Pole Integrity R 80230474 *SYS PROJ* CD02444 Pole Integrity R 80230479 CD02444 Pole Integrity Replacement 80230484 (BCW MATERIAL) *D&D*CD02444 Pole In 80230567 HOLD FOR POLE EVW - 23 Union St, Wi 80230640 EVW - 107 Ashley Rd, Winsted P#4306 80230698 DJM: ARROWHEAD RD WESTPORT/ TREE VS 80230819 *HAWK* Frontier Pole Inspection Pol 80230843 MR; WORK W/ 8970283-COLUMBIA, ROUTE 80230872 MF Y-26318-2022 remove from pole 27 80230898 MF- 3 OR MORE 32P1 NORTH STONINGTON 80231257 *HAWK* Frontier Pole Inspection Pol 80231319 *HAWK* Frontier Pole Inspection Pol 80231417 LA TELCO NOT SET (E) W HTFD, 664 FE 80231477 *ASP* JA-Conv# 1205349-MakeReadyNon 80231485 *HAWK* Frontier Pole Inspection Pol 80232122 JS- Conv. 1243243 - Make Ready Non80232276 Alend ONe (FCOMP 04.28.23), HTFD, 4 80232313 CHANGEOVER BY AG TUE, 8/2 - 31 Gate 80232392 9A CAR VS POLE 4/23, Pole#1726 , Co 80232410 AldenOne -1024 BUCKLEY HIGHWAY, UNI 80232508 WQ; 4/25/22 PEACEABLE RIDGE ( 28 80232528 Jpt-106 North St Bristol Riser (Frn 80232731 DG P#238 DUGG HILL RD WOODSTOCK RPL 80233100 RM, 76 LYONS PLAIN RD WSTN OH TO UG 80233144 PRINTED--04/25 RED OAK ( 82) DR 80233236 * MJ AMM ELLIS ST,NEW BRITAIN. REP 80233728 CDOT 320-016 oh work Main St. Winds 80233856 SCHED 6/18 print 4/24 need VEG MGT 80234030 MI Abel - WEST GRANBY, FIRETOWN, 30 80234145 Priority Pole P#981 replace with 45 80234502 * (9A) 04.23.22 - 41 WASHINGTON ST, 80234555 Y-26521-2022 / BRICKYARD RD, FARMIN 80234718 *HAWK* Frontier Pole Inspection Pol 80234739 *HAWK* Frontier Pole Inspection Pol 80234752 MTL: JRP - 16 Fenn Rd NEWINGTON Ins 80234832 *HAWK* Frontier Pole Inspection Pol 80234846 *HAWK* Frontier Pole Inspection Pol 80235097 04/28 *TURNOVER* MANCHESTER ( 146) 80235111 YA; 59 GILLIAM LN, REPLACE TWO POL 80235217 *HAWK* Frontier Pole Inspection Pol 80235424 ASP-MCB - 1636 Highland Ave Waterbu 80236483 (PR) 5/9 MDB-REPLACE-OH-ANNUAL-DES 80236573 KTI 5/2/22 *9A - WHITLOCK ( 12) 80236617 install new pole, anchor, and 50kVA 80236788 *D&D*Convo# 1191486&1191478 Double 80236833 *D&D*Convo# 1200836&1200838 Double 80237049 5/02: 161 BOWERY RD, NEW CANAAN/ NE 80237068 CAR V POLE 80237078 MV - PAWCATUCK, RIVER, 186, I/R 40/ 80237082 MF 9A 5/2 RIVER ( 1170) RD -- 796 R 80237137 *D&D*Frontier Pole Inspection Pole 80237140 JLB 122 WEED ST NC OH TO UG P#689 P 80237155 Abel - GRANBY, PETERSEN, 108R, 80237171 *D&D*Frontier Pole Inspection Pole 80237411 Replace Priority Pole P#526 with 40 80237438 *D&D*Frontier Pole Inspection Pole 80237749 MV - NORTH STONINGTON, BOOM BRIDGE, 80237819 DONE ASPLUNDH PR 7/7 CP- 9A- W HI 80237888 *D&D*Convo# 1218969 Double Pole Sur 80237891 PD-74 WEST COIT ST N. LONDON/SHIFT 80237892 E.P.- REPLACE P-1081 & UPDATE FUSIN 80238037 6/22 MDB - KENT, ANDERSON, 127, Bri 80238375 DG P#2078 BOSTON TPKE EASTFORD FRNT 80238439 NEW GC 9A 5/4 TURNOVER PUMPKIN HILL 80238475 WESTBROOK, POND MEADOW, 248/SHIFT P 80238621 **POST CONSTRUCTION** 9A CAR VS PO 80238631 CC; INT-101929 BETHEL, SKY EDGE, 43 80238647 *SYS PROJ* CD02444 Pole Integrity R 80238656 *SYS PROJ* CD02444 Pole Integrity R 80238661 CD02444 Pole Integrity Replacement 80238664 1/9/25 TURNOVER RIDGE( 254) RD 80238666 JSG - 1/9 (McGRABJ) PROSPECT( 61) S 80238670 TURNOVER 1/9/25 E# 5572783 45 WELL 80238671 CD02444 Pole Integrity Replacement 80238685 CD02444 Pole Integrity Replacement 80238695 CD02444 Pole Integrity Replacement 80238701 *SYS PROJ* CD02444 Pole Integrity R 80238704 CD02444 Pole Integrity Replacement 80238743 MV STONINGTON, NEW LONDON, 240, I/R 80238754 MV 5/5 LINCOLN PARK RD PRESTON TURN 80238857 *HAWK* CD01570 - Leaning Pole Repla 80238860 *HAWK* CD01570 - Leaning Pole Repla 80238885 CD02444 Pole Integrity Replacement 80238890 CD02444 Pole Integrity Replacement 80238901 *SYS PROJ* CD02444 Pole Integrity R 80238904 CD02444 Pole Integrity Replacement 80238907 **ROW** WRTN--JK>PROJ CD02544, 2024 80238913 *SYS PROJ* CD02444 Pole Integrity R 80238920 500 HOPEWELL RD GLASTONBURY - POLE 80238921 CD02444 Pole Integrity Replacement 80238932 COVENTRY, CHENEY LN, 78, replace po 80238964 CD02444 Pole Integrity Replacement 80238977 **ROW** WRTN--JK>PROJ CD02544, 2024 80238999 LD- 470 SHERIDAN DR, CHESHIRE- (FRN 80239010 *SYS PROJ* CD02444 Pole Integrity R 80239028 *SYS PROJ* CD02444 Pole Integrity R 80239032 TL - SAPIA DR, #21 NIANITC // INT-1 80239034 CD02444 Pole Integrity Replacement 80239038 CD02444 Pole Integrity Replacement 80239041 JDB 124 LIMEKILN RD REDDING, 1842 in-service date work order type 4/9/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 6/6/2023 11 Elect Annual Proj - DESG CT 8/15/2022 11 Elect Annual Proj - DESG CT 7/18/2022 11 Elect Annual Proj - DESG CT 1/12/2023 11 Elect Annual Proj - DESG CT 4/13/2023 11 Elect Annual Proj - DESG CT 6/29/2022 11 Elect Annual Proj - DESG CT 6/3/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 5/28/2024 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 10/19/2022 11 Elect Annual Proj - DESG CT 5/16/2023 11 Elect Project - DESG CT 5/5/2023 11 Damage Claims OH 9/9/2022 11 Asset Mgmt - Specific DESG CT 9/23/2022 11 Damage Claims OH 3/31/2023 11 Elect Annual Proj - DESG CT 6/30/2023 11 Elect Annual Proj - DESG CT 7/11/2023 11 Elect Annual Proj - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 6/12/2024 11 Asset Mgmt - Specific DESG CT 11/22/2022 11 Elect Annual Proj - DESG CT 4/27/2022 11 Dist Capital or Expense 7/16/2024 11 Asset Mgmt - Specific DESG CT 9/4/2024 11 Elect Annual Proj - DESG CT 12/9/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 10/31/2022 11 Damage Claims OH 5/6/2022 11 Elect Annual Proj - DESG CT 11/16/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 7/29/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 5/31/2023 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 10/7/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 11/8/2022 11 Damage Claims OH 3/1/2023 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 6/3/2022 11 Damage Claims OH 7/3/2023 11 Elect Annual Proj - DESG CT 5/16/2022 11 Damage Claims OH 11/29/2022 11 Elect Annual Proj - DESG CT 11/29/2022 11 Elect Annual Proj - DESG CT 9/14/2023 11 Elect Annual Proj - DESG CT 11/29/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 2/16/2023 11 Elect Annual Proj - DESG CT 12/2/2022 11 Elect Annual Proj - DESG CT 10/3/2022 11 Damage Claims OH 8/10/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 5/10/2023 11 Elect Annual Proj - DESG CT 6/30/2022 11 Elect Annual Proj - DESG CT 1/16/2025 11 Dist Capital or Expense 5/22/2022 11 Damage Claims OH 10/21/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Damage Claims OH 3/5/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 1/22/2025 11 Elect Annual Proj - DESG CT 1/14/2025 11 Dist Capital or Expense 4/28/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Elect Annual Proj - DESG CT 5/15/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 12/22/2022 11 Elect Annual Proj - DESG CT 8/23/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 5/14/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 3/5/2025 11 Elect Annual Proj - DESG CT 5/14/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 4/30/2025 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 6/26/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 3/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 4,660 6,325 7,502 9,421 7,495 4,602 1,717 13,696 739 2,631 2,554 29 3,120 4,643 5,511 380 371 206 13,512 503 49 4,846 10,360 3,149 2,678 3,738 (53) 545 4,125 163 8,825 199,748 16,745 9,969 5,532 2,228 1,920 194 356 5,887 167 951 205 2,937 230 7,251 1,521 4,555 1,264 433 1,969 3,934 2,125 1,281 1,270 272 7,857 2,269 152 1,252 229 3,428 1,497 643 489 10,804 419 926 3,817 2,726 40,836 3,917 12,263 1,405 4,385 8,167 1,705 850 7,170 5,303 3,523 4,043 3,603 2,147 1,414 1,437 8,172 5,008 3,283 6,117 10,181 76,564 3,970 4,727 7,307 5,580 4,662 118,504 662 7,605 3,092 143 4,234 8,361 4,131 365000 Overhead Conductors, Device 1,867 2,769 2,563 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,577 800 253 199 2,941 1,457 242 1,829 3,427 3,773 217 368330 Equipment Overhead 87 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 24,035 206 216 115 35 15 234 278 1,812 568 (138) 5,801 1,674 20 1,362 2,914 1,478 804 1,813 4,357 759 6,252 425 3,962 14,535 1,571 763 (18) 30,407 541 187 145 83,115 1,266 1,733 478 1,131 46 56 56 7,885 316 48 316 1 459 50 143 145 100 106 4,952 294 364 441 1,906 434 2,825 17,054 2,992 764 16 41 100 897 715 110 158 520 457 1,604 108 2,319 559 508 233 955 188 915 232 1,139 746 639 64 496 424 1,670 526 39,918 1,590 5,228 726 2,594 168,279 76 790 1,527 1,267 594 2,463 446 373390 SL- Fixtures Overhead 173 1,691 395 187 (95) 3,973 4,717 1,088 6,268 228,357 1,186 4,488 2,936 465 104,071 655 822 5,635 562 3,593 6,404 709 618 14,214 201 343 1,015 77 1,060 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 105 192 3,934 9,552 79 370470 Meter Equipment 74 (0) 1,452 2,802 13,154 90 103 1,374 3,688 874 1,033 369720 DB/UG Conductors and Devices 799 58 378 713 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,613 9,095 12,642 10,221 10,764 6,258 1,960 15,525 4,271 6,596 2,771 29 8,679 31,697 18,870 471 474 1,730 17,200 1,377 2,789 6,188 22,002 3,228 3,245 3,925 (304) 34,926 10,649 1,438 15,239 512,952 17,932 16,066 8,468 2,739 105,990 905 1,234 19,723 777 4,861 6,610 4,104 898 21,465 1,722 4,898 2,567 510 3,323 3,934 2,489 1,927 11,120 272 14,856 23,839 152 1,272 1,632 7,339 3,689 1,447 2,302 15,271 1,793 7,698 4,242 8,292 55,371 5,596 13,026 1,405 4,385 10,486 2,264 1,358 7,404 6,258 3,523 4,231 3,603 3,622 1,646 3,000 8,918 5,647 3,283 7,787 10,706 116,482 3,970 6,317 12,535 7,105 7,256 286,783 739 8,395 4,618 1,846 4,828 10,824 4,578

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)