Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 2 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 2 of 104 Work Order Number Description 80031445 ZK - W HTFD (MR Recloser) - 120 RID 80031594 Done EVW - 29 E Main St, North Can 80032036 DG P#4102 463 CENTER RD WOODSTOCK F 80032045 JSG/Winchester--Winchester Rd. 1248 80032223 398 RT 87/JON'N TRUMBULL. HWY COLMB 80032592 1/28 - 9A - Enfield, Oliver Rd - Ev 80032781 MTL: JRP - 806 W Queen St SOG Inst 80032792 print 5/9 EW/207 Litchfield Rd, Nor 80033542 9A Car v Pole - POLICE REPORT NOT R 80033559 01.19.21 MORRIS ( 20) RD -- 10 K 80033764 TELCO TO SET 9A - HTFD, 5 FLORENCE 80033860 01.24.21 NEW HAVEN ( 661) RD -- 9 80033941 JS - 94 Florida Hill Rd, Rdgfld, Re 80034009 9A 01.30.21 176 COOKE ST, WATERBU 80034784 PL:(9A) POLE #515 HBV, POLE XFERR'D 80035255 MCB - 19 ANN VIEW TER -- 4993, FRON 80035280 WRTN--DAN AWC 320 SHETUCKET TPKE VO 80035328 9A 02.02.21 MAGNOLIA ( 21) LN -80035764 MV-SALEM, NORWICH, 470, PRI EXT FOR 80035935 KD-9A EVENT #4448286 CAR V P 5765 80036061 JFC - 1/19/21 9A ROUTE 7 ( 477) 80036562 CD00925-06 Convert Washington Ave f 80036649 BRANFORD, MAIN, 1064, 80037079 KD-9A EVENT #4454788/4454786 TRUCK 80037268 9A 02.07.21 SPRING LAKE ( 132) R 80037279 COMPLETE; JV; 44555180 BEAUMONT HWY 80037282 9A 02.07.21 WALNUT ( 69) AVE -80037546 WRTN-BEACH POND ( 485) RD -- PAD 4 80037555 CD01223 AIRPORT 14K7 SEGMENT - Air 80037591 2/8 - 9A - Event 4455486 Shoham Rd 80037631 B / JV; 150 GRAND ST M'TWN RMV P-4 80037989 CAR VS POLE 868S - ST APPROVED 8/27 80038327 Jpt/Mb-3 Abbott Ave Terryville New 80038687 KD-9A EVENT #4454118 CAR V P 625-2 80038737 02.02.21 OLD MOUNTAIN RD FARMINGTO 80038825 10/03/24-- 3 NEHANTIC TRL- NIANTIC80038854 CR-514 W AVON RD. AVON, NEW DB SVC 80038912 CLINTON, KILLINGWORTH, 229, CAROLIN 80038917 CD01678-03 - ROW P2 REPLACEMENTS 80039168 9A CAR VS POLE - approved 5/19 80039721 Car vs. Pole-waiting for COMP Statu 80039887 CLINTON, MAIN, 341, 80039936 MCB - 303 HILL ST WTBY, P24973, CAR 80040028 AWC-MV- INSTL NEW 25KVA XFRM, RECON 80040045 RSO--02/15-21--REPLACED POLE W 40/2 80040118 NEEDS REWRITE TO BALANCE--Variance 80040735 GCC / MG Replace FTR P#353 Inst. Pr 80040794 AS BUILT - Rplc. 350al aerial cabl 80040854 zzDONE----RH--TC--2/16/21--Orchard 80041023 WRTN-SC-116 PRATT.. RD PLAINFIELD R 80041526 DG P#1410 5 WRIGHTSON DR THOMPSON C 80041747 9A-Car vs Pole 80042283 PRINTED 11/8 EW - 24 S Canaan Rd, N 80042299 R / 15 DAY DUE 4/13/21 - JK>POLE 80042481 KD-9A EVENT #4460001/4460008 CAR V 80042489 KD-9A EVENT #4459952/4459953 CAR V 80042501 KD-9A EVENT #4459695 CAR V P C6238 80042535 GCC- Colonel Ledyard Rd, Ledyard. F 80042701 (Wait on Cust) JK>POLE 802--FTR TO 80042847 MCB - S Main St, Cheshire pole 1123 80042964 COMPLETED** 21 WEST HIGH STREET 80043121 *JRP - 85 Robert Porter Rd SOG Inst 80043603 DG P#11397 RINDGE RD UNION RPLC XAR 80043610 MV - STONINGTON, 192 WATER ST, INST 80043643 DG P#2143 & 982 BUNGAY HILL RD WOOD 80043644 MV-STONINGTON, NAUTILUS, PHASE 3 OF 80043681 ASP_**9A 02.21.21 PILGRIM RD BRIST 80043696 JRP - 349 Marion Ave SOG DB Line Ex 80043709 **9A-RSO-RAGOJS-NELSON( 90) ST -- 5 80043869 zWETH--9/10/24--1269 Silas Deane Hw 80043891 *D&D* Conv. 1633919 - Make Ready No 80043984 GC - Extrusion Dr Pawcatuck 80044179 9A - Car vs. Pole #100 749 Saybrook 80044434 MR- ALL WORK COMPLETE RSO 11/06 COL 80044596 KD-9A EVENT #4461171/4461431 CAR V 80044613 9A 02.25.21 866 QUEEN ST, SOUTHIN 80044635 JLB 512 FROGTOWN RD NC 9A FRNTR REP 80044788 15 day due 6/28 - MV- 3PH 400A SERV 80044957 PD 6 1/2 MARGUY ST QUAKER HILL/UPGR 80045408 46 MUNICIPAL RD, WATERBURY - INST C 80045423 RSO-Turnover 2/26 LONG HILL ( 2611) 80045426 2/27 - 9A - 205 MOUNTAIN RD., ELLIN 80045711 DG P#483 & 734 ENGLISH NEIGHBORHOOD 80045768 TL - ROCKY NECK VILLAGE [PRIMARY IN 80045848 AMM 784 FARMINGTON AVE,FARMINGTON. 80045958 Hit & Run, 2/28 - 9A - 155 S Main S 80046431 Nutmeg Rd North 595, SW. Replace P80046499 PR11/6 NOT IN COMP STATUS9A CAR VS 80046540 RM, COMPLETED ..VC 9A - 458 WESTPOR 80046558 9A - CAR VS POLE 959 - APPROVED 80046565 11.19.24 DSINPRG -AB- -CRP - 9A 80046584 DONE-WTG FOR PD RPT 10/8/24 (TH) (J 80046594 CD01678-035-P2 (13)Locations W of F 80046595 CR-955 HOPMEADOW ST. SIMS,P 3939, U 80046653 7/13 STATUS? WEBSTER LN PHASE 2 80046665 OH work comp -JMS- WEST HARTFORD, 6 80046813 CD00925-06 SR 11W48-72S Pole 62340 80046829 AE/RL:18 MEADOWCROFT LN:GRN NEW 800 80046874 **1CS**WRTN - DM -80 LAKESIDE DR EA 80047037 CLINT ELDREDGE RD 50, WILLINGTON 80047177 DJM. 11 JOANN CIR WESTPORT. NEW 200 80047196 RA Project CDOT 141-157 RT 12 Thomp 80047256 CRP - 9A - 76 STONE RD BURLINGTON C 80047406 ---* PL: INST 1000kV 277/480V PAD & 80047473 3/4 - 9A - Windsor Locks, Elm St - in-service date work order type 10/17/2024 11 Dist Capital or Expense 1/28/2025 11 Elect Annual Proj - DESG CT 10/7/2024 11 Dist Capital or Expense 2/28/2024 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 3/10/2021 11 Damage Claims OH 8/9/2021 11 Elect Annual Proj - DESG CT 5/16/2023 11 Elect Annual Proj - DESG CT 2/10/2021 11 Damage Claims OH 7/16/2021 11 Repair/Obsol OH ST2 CT 5/1/2025 11 Damage Claims OH 5/2/2022 11 Elect Annual Proj - DESG CT 7/14/2021 11 Repair/Obsol OH ST2 CT 5/7/2021 11 Damage Claims OH 3/1/2021 11 Damage Claims OH 3/15/2021 11 Damage Claims OH 3/29/2021 11 Repair/Obsol OH ST2 CT 6/28/2021 11 Damage Claims OH 11/3/2021 11 Elect Annual Proj - DESG CT 5/3/2021 11 Damage Claims OH 8/9/2021 11 Damage Claims OH 7/30/2025 11 Dist Capital or Expense 11/19/2021 11 Elect Annual Proj - DESG CT 4/12/2021 11 Damage Claims OH 5/17/2021 11 Damage Claims OH 3/24/2021 11 Repair/Obsol OH ST2 CT 7/16/2021 11 Damage Claims OH 4/8/2021 11 Damage Claims OH 11/14/2024 11 Asset Mgmt - Specific DESG CT 2/15/2021 11 Damage Claims OH 10/24/2025 11 Dist Capital or Expense 2/11/2021 11 Damage Claims OH 5/3/2021 11 Elect Annual Proj - DESG CT 4/12/2021 11 Damage Claims OH 6/3/2021 11 Dist Capital or Expense 1/28/2025 11 Elect Annual Proj - DESG CT 5/12/2021 11 Dist Capital or Expense 8/11/2021 11 Elect Annual Proj - DESG CT 6/4/2021 11 Asset Mgmt - Specific DESG CT 4/4/2025 11 Damage Claims OH 3/22/2021 11 Damage Claims OH 5/3/2021 11 Elect Annual Proj - DESG CT 5/7/2021 11 Damage Claims OH 3/24/2021 11 Repair/Obsol OH ST2 CT 4/1/2021 11 Repair/Obsol OH ST2 CT 6/16/2021 11 Dist Capital or Expense 6/23/2022 11 Elect Annual Proj - DESG CT 3/26/2024 11 Asset Mgmt - Specific DESG CT 4/19/2021 11 Repair/Obsol OH ST2 CT 6/10/2021 11 Asset Mgmt - Specific DESG CT 3/22/2021 11 Elect Annual Proj - DESG CT 2/19/2021 11 Damage Claims OH 9/16/2025 11 Dist Capital or Expense 6/15/2021 11 Elect Annual Proj - DESG CT 4/26/2021 11 Damage Claims OH 4/26/2021 11 Damage Claims OH 4/26/2021 11 Damage Claims OH 10/20/2025 11 Dist Capital or Expense 8/28/2024 11 Elect Annual Proj - DESG CT 2/23/2021 11 Repair/Obsol OH ST2 CT 8/2/2021 11 Elect Annual Proj - DESG CT 8/9/2021 11 Elect Annual Proj - DESG CT 4/2/2021 11 Repair/Obsol OH ST2 CT 1/17/2023 11 Elect Annual Proj - DESG CT 4/2/2021 11 Repair/Obsol OH ST2 CT 8/26/2021 11 Dist Capital or Expense 2/3/2023 11 Damage Claims OH 5/8/2025 11 Elect Annual Proj - DESG CT 11/29/2025 11 Damage Claims OH 6/3/2025 11 Elect Annual Proj - DESG CT 5/12/2025 11 Dist Capital or Expense 5/5/2021 11 Asset Mgmt - Specific DESG CT 5/21/2025 11 Dist Capital or Expense 3/9/2021 11 Repair/Obsol OH ST2 CT 4/26/2021 11 Damage Claims OH 3/9/2021 11 Damage Claims OH 2/3/2025 11 Dist Capital or Expense 6/21/2021 11 Elect Annual Proj - DESG CT 6/10/2021 11 Elect Annual Proj - DESG CT 7/26/2021 11 Elect Annual Proj - DESG CT 3/11/2021 11 Repair/Obsol OH ST2 CT 3/9/2021 11 Damage Claims OH 3/31/2021 11 Repair/Obsol OH ST2 CT 1/5/2022 11 Elect Annual Proj - DESG CT 11/29/2021 11 Elect Annual Proj - DESG CT 3/4/2021 11 Damage Claims OH 3/15/2021 11 Elect Annual Proj - DESG CT 12/3/2024 11 Damage Claims OH 11/14/2024 11 Dist Capital or Expense 10/18/2024 11 Damage Claims OH 12/12/2024 11 Damage Claims OH 10/9/2024 11 Dist Capital or Expense 8/10/2021 11 Dist Capital or Expense 8/4/2021 11 Elect Annual Proj - DESG CT 7/13/2022 11 Elect Annual Proj - DESG CT 9/6/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 4/2/2025 11 Elect Annual Proj - DESG CT 12/10/2024 11 Elect Annual Proj - DESG CT 6/27/2025 11 Dist Capital or Expense 11/25/2024 11 Elect Annual Proj - DESG CT 11/20/2023 11 Elect Annual Proj - DESG CT 3/16/2021 11 Damage Claims OH 2/8/2022 11 Elect Annual Proj - DESG CT 3/17/2021 11 Damage Claims OH Subsequent Close Date 7/17/2026 7/17/2026 5/15/2026 6/26/2026 9/16/2026 8/26/2026 2/5/2026 8/26/2026 9/16/2026 2/13/2026 5/15/2026 6/26/2026 5/15/2026 2/13/2026 364310 Poles and Appurtenance 130 591 2,813 (998) 2,415 7,148 2,154 47 2,016 46 41 877 912 6,217 3,028 91 407 805 13,722 8,575 1,498 7,683 5,488 11,236 3,573 390 462 2,179 4,990 19,679 812 3,491 269 6,094 622 10,279 1,030 9,967 10,552 5,500 98 6,427 5,849 683 4,068 4,403 6,719 3,336 1,797 907 9,919 1,034 249 17 803 2,423 8,122 846 189 3,864 4,523 1,497 629 3,320 1,087 426 5,013 8,220 277 3,756 11,306 25,932 2,485 1,233 4,266 18,409 4,671 4,556 131 2,554 1,722 1,453 1,515 16,311 1,276 4,684 1,672 4,962 8,347 15,575 4,568 8,448 179,504 2,915 701 8,502 193 5,723 6,452 3,203 3,479 24,283 111 6,563 2,049 365000 Overhead Conductors, Device 27,919 1,073 3,936 (61) 1,742 2,249 2,295 1,919 1,964 163 3,298 18 4,033 1,029 540 580 141 9,419 206 934 21,000 5,998 3,659 575 42 57 2,277 94,609 15,227 697 320 814 44 1,598 999 421 37,708 669 196 3,693 134 1,985 990 95,876 194 1,879 67 2,464 1,021 265 1,917 64 215 7,527 1,092 63,751 374 1,909 59 3,386 2,151 4,193 1,823 3,802 11,910 4,282 10,232 12,858 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 17,106 9,909 5,167 1,538 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 327 3,820 1,288 326 88 4,385 2,359 255 14 33,977 220 609 11,379 63,984 164 23,714 5,941 2,377 75 67,722 58,151 5,776 596 1,985 746 4,078 132 294 1,431 1,244 169 1,846 116,590 1,459 580 19 2,669 166 250 623 3,243 223 4,745 827 433 470 257 24,848 2,191 1,737 98,835 458 9,499 2,260 135 27,269 265 340 322 384 1,524 16,976 424 1,142 4,247 2,719 2,505 460 1,075 4,749 550 1,518 3,195 2,806 552 93 450 7,807 5,534 8,660 527 38,044 1,136 713 14,748 46,626 3,272 343 1,950 370470 Meter Equipment (2) 6 20 27 4,688 8,030 36,539 13,286 116 450 578 2,565 3,623 223 18,565 4,213 19,506 7,206 337 366 5,812 1,116 16,642 481 696 5,476 (8) 309 843 65 8,929 1,747 693 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 28,049 2,952 7,076 (1,059) 4,245 9,397 11,448 1,966 3,979 223 41 4,175 35,127 10,860 4,057 632 987 946 98,504 8,781 2,432 28,847 43,518 14,895 4,223 432 519 4,455 225,472 43,262 812 4,933 4,667 6,908 666 11,878 2,455 11,819 48,260 9,647 98 8,340 6,045 4,546 4,202 124,824 7,709 99,212 1,991 4,245 10,566 3,498 1,288 2,952 2,886 2,737 8,337 8,996 4,746 67,615 5,724 9,054 688 9,223 3,238 128,436 7,294 23,712 277 44,672 16,238 38,350 32,319 1,657 5,406 22,656 7,390 7,067 591 3,676 6,471 6,691 3,033 64,075 17,368 5,236 2,331 5,413 19,777 21,110 16,371 8,976 217,548 4,639 39,484 37,720 46,819 30,331 7,491 10,930 4,321 41,454 10,020 23,100 3,588
  2. Page 3 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 3 of 104 Work Order Number Description 80047511 MCB - 1678 MERIDEN WATERBURY TPKE, 80048345 CD01357 part 2 of 2 - Reconductor w 80048538 CR-56 HAYNES RD. AVON, TELCO REPLAC 80048546 RF-MANCHESTER, 1339 TOLLAND TPK - A 80048556 KD-9A EVENT #4477489/4477528 CAR V 80048649 #MANCHESTER, 140 SPENCER ST - INSTA 80048721 MM - 119 CROSS RIDGE RD, NEW CANAAN 80048726 CDOT 060-162 Relocate facilites for 80048730 TL - S LEE RD, #41 NIANTIC $$ // NE 80048805 Warrenville Rd, Mansfield BBA P-119 80048820 PL: CUT & KICK CRACKED POLE #E30 (E 80049265 PD 92 TRUMAN ST N. LONDON 9A ALL W 80049359 JRP - 99 Union City Rd. PROSPECT Ne 80049433 9A 3/8 W MAIN ST CHESTER. ALL WORK 80049446 MV - STONINGTON, 101 W BROAD, INST 80049543 JDB 131 HIGHLAND AVE NORWALK, INS X 80049646 *TELCO 4/26 -Jpt-42 Neal Ct Plainvi 80049657 9A 03.06.21 - 637 WATERTOWN RD, WA 80049933 CR-Simsbury, Long View Dr - Frontie 80050039 RL; 17 TINKER LN: 400 AMP OH/DB: Ne 80050195 RF-61 King St, East Hartford, Pole# 80050219 MR ALL WORK COMPLETED Event 4478344 80050617 JV; ROUTE 32 ( 828) -- 638, FRANK 80050632 3/11 - 9A - SW, Foster St, South Wi 80050905 JDB 12 STONY LA NORWALK P7190 SHIFT 80050960 JLB 28 CONNERY ST WLTN SET NEW SEC 80051003 163 GREAT HILL, DEEP HQ,NEW PRI SVC 80051029 DG P#3384 101 HOLMES RD POMFRET FRN 80051043 ALL WORK COMPLETE 03-13 tree vs p20 80051091 CRP - 9 A CAR VS POLE # 4276 295 MI 80051144 PL: XFER FACILITIES & INST 3PH BANK 80051156 CD00925-06 Install SR 11W48-73S P# 80051226 3/14 - 393 Tunxis Ave, Bloomfield 80051250 MR; 3/14 9a RSO FONTAINE-Car vp2019 80051358 MV-SALEM, WEST RD, 369, INST 40/2, 80051372 KD-EVENT#4480382 REPLC P 2132 PLEAS 80051508 TL - OLD BLACK POINT RD, P#101 NIAN 80051589 CAR VS POLE - NO PR FOUND: NON-BILL 80051792 DB-CD01419-02 Boom Bridge Rd, N. St 80051833 MM-1221 NORWICH RD PLAINFIELD pole 80051875 WRTN--SC-STERLING HILL RD PLAINFIEL 80051994 BROOKLYN, GRAND VIEW, -146, Keith P 80052079 East St South 1300, Suffield. I- ro 80052362 KD-9A EVENT #4483005/4483095 CAR V 80052378 Reconductor West St with 1/0 TW 80052412 MANCHESTER, 1482 PLEASANT VALLEY 80052454 7/28 in customer drawer NO MUNI CP 80052456 Abel- 3/16 (STILWELL) Suffield, 311 80052485 3/14 - Simsbury, Hildurcrest - Fron 80052671 CRP - 9A 3/13 CAR V. POLE- (CROWL 80052753 MATERIAL RM, 39 KELLOGG HILL RD 80052805 DG P#2292 & 2293 KILLINGLY RD POMFR 80052832 KD-9A EVENT #4483349 CAR V P 476 S 80052848 PD - 9A MCDERM CAR VS P5342 JAY ( 80052854 WF-03/17-1090 WINDSOR AVE-WINDSOR80052859 MV - SALEM, 14 RATHBUN HILL, CONVER 80053040 HOLD POLE PR 7/7 -NEEDS NEW SEC PO 80053544 MF- BROCKWAY FERRY POLE 5315 LYME 80053626 *DISTRICT*Convo#1045197-MakeReadyNo 80053648 RA- Project CD01678-02 ROW 193 P2 80053871 3/19 - 9A - Tolland, Browns Bridge 80053877 mat bal WF-AMAZON-WF-1215 KENNEDY R 80054519 150 MAYFLOWER P-172, WEST SUFFIELD 80054544 KD-9A EVENT #4485777/4485820 CAR V 80054758 DG P#3147 604 FABYAN RD THOMPSON CL 80054997 ES WORK COMPLETE - PHONE/CABLE NEED 80055099 9A CAR VS POLE 80055192 CD00925-06 Convert S. Leonard St W 80055272 TL - HAMBURG RD, #40 LYME // UPGRAD 80055458 DANBURY-MEMORIAL DR-POLES 13, 15-RE 80055575 BRANFORD, CHERRY HILL, 149, 80055663 BM; 3/24 - Newtown, Currituck Rd 80055681 MJ-Priority Reject Pole - Pole 5 80055878 DJM!!! 14 HILLANDALE RD WESTPORT. P 80055992 PD-16 TILLEY ST NEW LONDON/RPLC P# 80056090 zzDONE----WETH--101 Cedar St--REPL 80056245 DJM!!!! 49 CAVALRY RD WESTPORT. POL 80056342 WM; 3/25/21 BALDWIN HILL RD WASHING 80056367 3/25/21 9A SYLVAN AVE WATERBURY 80056495 DJM!!! AUTHORS WAY WPRT LINE EXTENS 80056657 KD-9A EVENT #4487552/4487546/448762 80056658 TL - MAMACOCK RD, NIANTIC // ***FOL 80056816 WTBY - 1717 THOMASTON AVE, WTBY - I 80056994 JV; SMITH RD , NORTH FRANKLIN, CT 0 80057030 DG P#233 146 PARK RD PUTNAM FRNTR P 80057138 9A 03.27.21 - 137 MULBERRY ST, SOU 80057145 TL - ELYS FERRY RD, #27 LYME // RE 80057191 15 DAY DUE 6/25 - JV; pic COLCHESTE 80057192 TL - BROCKWAY FERRY RD, #30-1 LYME 80057240 PL:INST 500kV PAD #430 & RISER AT P 80057633 WF-AMAZON-(20,0): -1215 Kennedy Rd80057642 WRTN-SC- CHURCH STREET - STERLING P 80057702 PD -2 LLOYD RD WTFD/RPLCE P# 12312 80057913 KD-9A EVENT #4495867/4495836/449623 80058097 GC - 9A HARTFORD NEW LONDON ( 1841) 80058181 COMP*JRP - Loper St Lot 2-3 (House 80058220 90 S. SATELLITE RD., SOUTH WINDSOR 80058493 MR; ****ALL WORK COMPLETED**** 04/0 80058606 *WC-1012 EAST ST, SOUTHINGTON DG PR 80058681 KD-9A EVNET #4496085 CAR V P 2014 80058925 MCB - NORTHROP RD ( 36) EXT -- 18 80058968 RC REPLACE 4 POLES. 80059068 JRP - 215 Cheshire Rd PROSPECT Repl 80059119 DG P#1072 FREEDLEY RD, POMFRET 3/29 80059359 *Jpt-210 Andrews St SOG (New)P6372 in-service date work order type 3/11/2021 11 Damage Claims OH 5/21/2024 11 Asset Mgmt - Specific DESG CT 4/14/2021 11 Damage Claims OH 10/13/2021 11 Dist Capital or Expense 5/10/2021 11 Damage Claims OH 11/1/2023 11 Asset Mgmt - Specific DESG CT 7/3/2025 11 Corrective Maint UG Svc 11/10/2023 11 Elect Annual Proj - DESG CT 5/10/2021 11 Elect Annual Proj - DESG CT 3/17/2021 11 Damage Claims OH 3/11/2021 11 Repair/Obsol OH ST2 CT 3/17/2021 11 Damage Claims OH 9/20/2021 11 Elect Annual Proj - DESG CT 3/24/2021 11 Damage Claims OH 7/15/2021 11 Asset Mgmt - Specific DESG CT 10/6/2021 11 Elect Annual Proj - DESG CT 12/14/2023 11 Asset Mgmt - Specific DESG CT 5/7/2021 11 Damage Claims OH 6/24/2021 11 Repair/Obsol OH ST2 CT 8/16/2021 11 Corrective Maint UG Svc 3/30/2021 11 Elect Annual Proj - DESG CT 3/17/2021 11 Repair/Obsol OH ST2 CT 6/16/2021 11 Repair/Obsol OH ST2 CT 3/16/2021 11 Damage Claims OH 8/31/2021 11 Elect Annual Proj - DESG CT 8/10/2021 11 Elect Annual Proj - DESG CT 8/25/2022 11 Elect Annual Proj - DESG CT 4/7/2022 11 Elect Annual Proj - DESG CT 4/9/2021 11 Repair/Obsol OH ST2 CT 3/17/2021 11 Damage Claims OH 10/4/2021 11 Elect Annual Proj - DESG CT 7/29/2025 11 Dist Capital or Expense 5/10/2021 11 Repair/Obsol OH ST2 CT 3/17/2021 11 Damage Claims OH 6/22/2021 11 Elect Annual Proj - DESG CT 9/10/2021 11 Corrective Maint OH Lines 3/28/2021 11 Repair/Obsol OH ST2 CT 3/19/2025 11 Damage Claims OH 12/10/2021 11 Asset Mgmt - Specific DESG CT 10/28/2024 11 Dist Capital or Expense 9/26/2024 11 Elect Annual Proj - DESG CT 6/11/2021 11 Elect Annual Proj - DESG CT 1/7/2025 11 Private Work - No Co Asset 5/3/2021 11 Damage Claims OH 7/29/2021 11 Elect Annual Proj - DESG CT 2/8/2022 11 Asset Mgmt - Specific DESG CT 7/3/2023 11 Elect Annual Proj - DESG CT 12/13/2021 11 Elect Annual Proj - DESG CT 5/10/2021 11 Repair/Obsol OH ST2 CT 4/8/2021 11 Damage Claims OH 1/3/2025 11 Corrective Maint OH Svc 6/1/2021 11 Damage Claims OH 5/3/2021 11 Damage Claims OH 4/26/2021 11 Damage Claims OH 4/5/2021 11 Repair/Obsol OH ST2 CT 7/3/2023 11 Corrective Maint UG Svc 7/7/2022 11 Elect Annual Proj - DESG CT 5/21/2021 11 Repair/Obsol OH ST2 CT 11/14/2025 11 Dist Capital or Expense 8/6/2021 11 Asset Mgmt - Specific DESG CT 3/22/2021 11 Damage Claims OH 12/14/2022 11 Asset Mgmt - Specific DESG CT 3/26/2021 11 Damage Claims OH 5/3/2021 11 Damage Claims OH 12/23/2021 11 Elect Annual Proj - DESG CT 8/14/2023 11 Elect Annual Proj - DESG CT 4/9/2021 11 Damage Claims OH 7/31/2025 11 Dist Capital or Expense 11/9/2021 11 Corrective Maint UG Svc 11/14/2024 11 Street Light - DESG CT 5/10/2021 11 Dist Capital or Expense 3/2/2023 11 Elect Annual Proj - DESG CT 5/8/2023 11 Elect Annual Proj - DESG CT 4/8/2025 11 Dist Capital or Expense 5/25/2023 11 Elect Annual Proj - DESG CT 4/27/2021 11 Repair/Obsol OH ST2 CT 4/26/2021 11 Repair/Obsol OH ST2 CT 7/29/2021 11 Repair/Obsol OH ST2 CT 6/29/2021 11 Damage Claims OH 1/11/2022 11 Elect Annual Proj - DESG CT 5/3/2021 11 Damage Claims OH 6/23/2022 11 Elect Annual Proj - DESG CT 11/28/2023 11 Elect Annual Proj - DESG CT 4/19/2021 11 Repair/Obsol OH ST2 CT 5/12/2021 11 Repair/Obsol OH ST2 CT 4/5/2021 11 Damage Claims OH 6/9/2021 11 Elect Annual Proj - DESG CT 6/21/2021 11 Elect Annual Proj - DESG CT 5/17/2021 11 Repair/Obsol OH ST2 CT 7/23/2021 11 Elect Annual Proj - DESG CT 11/21/2024 11 Asset Mgmt - Specific DESG CT 4/13/2021 11 Repair/Obsol OH ST2 CT 7/27/2021 11 Repair/Obsol OH ST2 CT 5/17/2021 11 Damage Claims OH 5/5/2021 11 Damage Claims OH 8/9/2021 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 4/8/2021 11 Repair/Obsol OH ST2 CT 8/17/2023 11 Elect Annual Proj - DESG CT 5/3/2021 11 Damage Claims OH 7/1/2021 11 Repair/Obsol OH ST2 CT 7/28/2021 11 Repair/Obsol OH ST2 CT 6/25/2021 11 Elect Annual Proj - DESG CT 5/12/2021 11 Repair/Obsol OH ST2 CT 10/19/2021 11 Asset Mgmt - Specific DESG CT Subsequent Close Date 8/26/2026 8/26/2026 7/17/2026 2/13/2026 1/22/2026 364310 Poles and Appurtenance 306 (26,338) 846 (2) 12,000 4,152 (27) 2,032 5,864 7,469 5,671 2,556 1,134 2,071 104 3,782 3,589 10,510 237 3,753 940 1,279 949 14,344 511 2,215 1,367 573 222 4,787 1,596 185 1,658 8,844 7,638 691 674 10,791 3,034 6,093 4,400 436 2,801 1,562 1,298 309 1,737 (373) 3,620 1,394 8,705 6,548 4,275 3,854 814 68 6,146 1,135 8,218 57,315 5,809 168 4,072 6,119 7,725 851 10,893 5,441 4,085 3,817 4,842 1,145 2,594 3,746 100 803 4,468 4,904 1,194 3,799 1,323 810 2,032 309 3,770 4,582 3,326 75 5,425 0 223 3,800 3,429 760 6,169 801 2,907 7,393 1,037 1,436 340 12,251 545 772 514 365000 Overhead Conductors, Device 371 (26,338) 3,503 1,666 1,750 2,196 (7) 1,126 4,054 151 918 366700 DB/UG Conduits and Vaults 1,139 368750 DB/UG Installations 369320 Cond&DevicesOverhead 14,953 485 6,050 298 0 370470 Meter Equipment 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 2,765 (83) 375 565 24 570 1,604 27 183 2,217 257 11,983 1,559 65 (191) 752 64 925 290 351 3,149 1,212 3,034 19,613 11,745 2,153 358 4,199 614 3,034 161 171 776 102 160 613 129 1,821 296 507 618 38 461 70 77 130 14,551 44 33,394 1,294 86,730 3,073 5,401 427 3,056 93 173 2,245 2,154 17 40 701 165 1,096 1,990 2,227 2,069 992 523 532 373390 SL- Fixtures Overhead 1,214 806 142 3,742 519 3,096 117 4,128 160 1,976 1,565 19,032 1,160 1,421 1,834 9,843 279 70 1,742 4,570 342 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 88 10 807 23 2,004 7,586 525 4,969 7,824 1,872 1,039 2,871 655 3,496 106 5,975 5,359 1,897 368350 Installations Overhead 5,987 960 97 226 148 2,006 1,658 246 1,910 910 298 88 393 368330 Equipment Overhead 54 (26,338) 290 581 1,776 288 79 143 3,422 1,351 1,534 43,145 501 940 2,982 188 802 5,259 3,034 6,129 4,139 471 2,987 2,288 7,158 1,311 171 367720 DB/UG Conductors and devices 369720 DB/UG Conductors and Devices 384 6,922 11,690 1,858 1,054 402 191 1,876 140 8,955 190 137 10,800 346 1,945 401 9,371 33 114 705 33,333 191 185 17 1,815 141 70 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 731 (79,014) 4,349 18,239 13,750 15,462 (117) 3,824 11,062 7,620 6,589 2,556 8,986 2,359 218 4,496 8,615 11,861 237 5,926 1,063 1,505 1,097 16,533 4,385 2,718 16,819 1,548 520 4,787 3,691 43,330 2,159 9,785 11,609 879 1,766 16,401 12,137 32,771 23,604 4,271 5,788 3,850 8,916 5,979 3,134 (373) 4,427 1,418 11,457 15,955 4,275 3,854 902 1,764 6,146 1,730 13,264 65,138 7,811 15,759 6,942 6,774 44,659 957 16,868 13,966 12,851 93,219 10,858 1,286 2,594 3,762 140 803 5,169 5,069 2,674 12,711 3,550 810 20,376 828 7,267 4,700 9,521 235 7,541 12,866 28,817 4,961 4,850 2,595 26,812 1,597 2,977 9,954 38,940 1,777 340 14,510 1,863 1,312 2,930
  3. Page 4 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 4 of 104 Work Order Number Description 80059436 9A- CAR VS POLE 80059460 EW - 113 South Rd, Winsted P#1396 D 80059485 TC 527 GLENBROOK RD, STM; P#3293 UP 80059611 GUILFORD, BOSTON POST, 301, 80059636 4/2 ; 32 TURKEY HILL RD S, WESTPORT 80059786 TC 248 WEST AVE, STM; P#16952 REPL 80059809 VARIANCE - Replace normal reject po 80059916 JMS DONE- 9A (79) SOMERSET ST WEST 80059919 Yellow Tag Y-24932-2021 Fill Gap on 80059921 9A KD-EVENT #4489496 CAR V P 121 S 80059967 (ASP) CR-151 FARMS VILLAGE RD. SIMS 80060013 MV; PORTLAND COBALT ( 1255) RD -- H 80060543 CD00925-06 Reconductor Lafayette St 80060574 KD-EVENT #4499442 SHIFT P A156 80060740 KD-EVENT #4490067 NEW POLETOP P 227 80060938 EVW - 72 MAIN ST SALISBURY CT P#59 80060992 TL - SMITHS NECK RD, #19 OLD LYME / 80061022 DONE MDB - 8A2- Highland Ave. Torri 80061074 MR; COPIED FROM STORMS 2891511 -REP 80061174 MV- GROTON, 1300 FLANDERS RD, INST 80061588 9A CAR VS POLE - 1218-6, CLINTON, C 80061999 4/11 - 9A - Wethersfield, Wolcott H 80062040 JV; 9A E4500905- 315 GILEAD ST, HEB 80062192 MM REPLC POLE 615 INSTL NEW 25KVA W 80062434 ASP **9A KD-EVENT #4501454 CAR V P 80062440 KD-9A EVENT #45015051 CAR V P 1180 80062453 ---COMP 11/13 815 HAMILTON AVE, WAT 80062606 *JAM - NEW BRITAIN, NEWINGTON, 240, 80062923 JES; 677 CONNECTICUT AVE. NWLK. W 80062926 29 Knollwood Dr, Old Saybrook-Remov 80062957 9A - Car vs. Pole - Bill Released 0 80063452 JLB 133 WOODLAND RD NC NEW OH TO DB 80063580 * PMV - Move Back for Bridge work 80063617 zzDONE----WETH---Signal View Dr--Po 80063643 Jpt-7 Pheasant Hill Rd Farmington P 80064082 zHTFD, 5 Lawrence St-- SHIFT P3007, 80064227 PRINT 4/5 EW - 34 Indian Orchard Rd 80064258 RL:340 PEMBERWICK RD. GRN. 26 Res/1 80064681 MJ 1/31 COMP -MCB - 2091 HIGHLAND A 80064694 9A CAR VS POLE CHESTER, CT 06412 80064790 9A - Car vs. Pole - Bill released t 80065247 PCC - 260 Hydeville Rd.,p-35404 rel 80065444 9A 04.18.21 - JOHNSON LN, DURHAM 80065454 JV; pic INT-47207-LT-DG-UPGRADE IN 80065569 MR; NEED EARLY POLE SET- 5411570 N 80065591 JDB 52 NOAHS LANE EXT NORWALK REPL, 80065890 JAM 9A 494 Willard Ave Newington P2 80065958 CR-OLD FARMS RD. SIMS, P# 745 & 746 80066017 MORRIS, MORRIS, 291, Stephanie Rind 80066040 NONBILLABLE - NO PR FOUND - 9A--CAR 80066082 Jpt-21 Third St Bristol (New)P16374 80066262 POST CONSTRUCTION 9A - 1170 MAIN ST 80066312 MCB - 9A- 72 PORTERS PASS BERLIN, 80066400 15 DAY DUE 6/25 - JK>POLE 2603--INS 80066434 VJT -695 BALDWIN ST WATERBURY -WAS 80066558 *Jpt-442 (Unit-1) East St Plainvill 80066698 VJT - MAIN ( 488) ST -- S814 S24 80066900 CR-CHEVAS RD. AVON, P# 1888, PRIORI 80066923 CAR VS POLE APROVED 1/11/23 80066967 WRTN-929 HOPEVILLE RD, GRISWOLD CT 80067045 JFC - 335 MARSH RD, LITCHFIELD P#2S 80067068 COMP **(20) 283 PIEDMONT ST, WATERB 80067219 PR 7/7 CRP - POLE-PRIORITY REJECT-I 80067306 PL:SOUTH ST MIDDLEBURY, REP 8' XARM 80067325 NEED MUNI DONE EVW - 419 Bald Mount 80067452 2.28 2ND REQ PR MM 9A BROKEN TANGEN 80067556 9A KD-EVENT #4508018 CAR V P 285 SO 80067573 161 EDGEWOOD AVE, WATERBURY - RELIA 80067770 BC - CD01678-03 ROW001 P2 Estimate 80067967 97 SHARON RD, WATERBURY - RPL COMM 80068018 EVW - 134 Losaw Rd, Winsted P#4702 80068270 * AMM 2800 BERLIN TPKE,NEWINGTON. E 80068280 ----P420 remove RR P-419 install SR 80068420 TL - BINNEY RD, #17 OLD LYME // OH 80068512 9A KD-EVENT #4508728 CAR V P 182-S 80068575 Leidos - Boom Bridge Rd, North Ston 80068922 DG P#688 295 VALENTINE RD POMFRET C 80069040 D/W 5818025 JRP - 25 Hemingway Ave 80069049 9A KD-EVENT #4508969/4504426 RIVERS 80069456 DONE EW - 520 W Main St, North Cana 80069680 MR;**COMPLETED***INST 140s ON P1530 80069750 JMS BLOOMFIELD, 713 BLOOMFIELD AV 80069813 APP 11/03-11/04 need pole set; MV; 80069850 WRTN-4/30 9A PENDLETON HILL ( 622) 80069865 PRE245 1.28.22 9A CAR V P2644 BUCKL 80069905 TELCO HILLSIDE (750) AVE -- 3193, H 80069985 MF - 47 Norman, Waterford Pole 7328 80070066 DONE WTG FOR PD RPT 11/19/24 (TH) P 80070134 TL - HAMBURG RD, #309 LYME // UPGRA 80070407 COMP - AS BUILT REQ KB-Baldwin 13F 80070552 BC - 9/10- RSO - LEDYARD ST - Pole 80070683 MR: 5/3 COMPLETE; BELL ( 301) ST 80070720 ASP_STWR3473648 WC- 19 Apple Hl, Ne 80070870 TL - FRANCIS LN, NIANTIC (#5) // RE 80070890 WRTN--SC-51 TOWN HOUSE RD LISBON I/ 80070994 RC REPLACE POLES 14226, 14227 & 144 80071129 RA Project CDOT 62-96 Hampton - Sta 80071135 ALL WORK COMPLETE 5/4 ON GENERATION 80071367 NORTH FRANKLIN, FRANKLIN, 38, 80071430 *** MJP/Cascade Rd/STM/CD00728 - In 80071447 51 RIVER RD KILLINGWORTH, Jonathan 80071449 9A KD-EVENT #4513423 TURNOVER CAR V 80071462 9A KD-EVENT #4513507/4513486 CAR V 80071489 Jpt-148 Greene St Bristol P3315 - 9 80071503 PRE245 EB; 9A 5/5/21 RSO TURNOVER - in-service date work order type 5/19/2021 11 Damage Claims OH 6/8/2021 11 Asset Mgmt - Specific DESG CT 2/14/2022 11 Asset Mgmt - Specific DESG CT 11/9/2021 11 Elect Annual Proj - DESG CT 11/3/2022 11 Elect Annual Proj - DESG CT 7/14/2021 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 4/11/2021 11 Damage Claims OH 10/13/2021 11 Corrective Maint OH Lines 6/10/2021 11 Damage Claims OH 8/17/2022 11 Asset Mgmt - Specific DESG CT 4/16/2021 11 Damage Claims OH 7/30/2025 11 Dist Capital or Expense 5/17/2021 11 Repair/Obsol OH ST2 CT 6/7/2021 11 Dist Capital or Expense 6/10/2021 11 Repair/Obsol OH ST2 CT 3/3/2022 11 Asset Mgmt - Specific DESG CT 1/24/2023 11 Elect Annual Proj - DESG CT 9/22/2025 11 Dist Capital or Expense 4/21/2021 11 Elect Annual Proj - DESG CT 4/15/2021 11 Damage Claims OH 5/8/2021 11 Damage Claims OH 4/22/2021 11 Damage Claims OH 6/16/2023 11 Elect Annual Proj - DESG CT 12/22/2022 11 Damage Claims OH 5/17/2021 11 Damage Claims OH 2/10/2022 11 Elect Annual Proj - DESG CT 9/27/2021 11 Elect Annual Proj - DESG CT 3/25/2025 11 Elect Annual Proj - DESG CT 9/23/2021 11 Dist Capital or Expense 4/30/2021 11 Damage Claims OH 7/16/2021 11 Elect Annual Proj - DESG CT 10/17/2024 11 Corrective Maint OH Svc 5/20/2021 11 Elect Annual Proj - DESG CT 4/28/2023 11 Asset Mgmt - Specific DESG CT 1/12/2022 11 Elect Annual Proj - DESG CT 4/17/2023 11 Elect Annual Proj - DESG CT 10/12/2021 11 Elect Annual Proj - DESG CT 2/14/2022 11 Damage Claims OH 4/28/2021 11 Damage Claims OH 5/4/2021 11 Damage Claims OH 10/5/2021 11 Elect Annual Proj - DESG CT 4/28/2021 11 Damage Claims OH 10/13/2021 11 Elect Annual Proj - DESG CT 9/22/2025 11 Dist Capital or Expense 8/29/2023 11 Asset Mgmt - Specific DESG CT 5/20/2021 11 Damage Claims OH 5/10/2021 11 Repair/Obsol OH ST2 CT 6/11/2021 11 Asset Mgmt - Specific DESG CT 5/12/2023 11 Damage Claims OH 12/9/2021 11 Elect Annual Proj - DESG CT 6/3/2021 11 Damage Claims OH 5/4/2021 11 Damage Claims OH 6/17/2021 11 Asset Mgmt - Specific DESG CT 8/14/2025 11 Asset Mgmt - Specific DESG CT 6/30/2021 11 Elect Annual Proj - DESG CT 10/4/2021 11 Corrective Maint OH Lines 9/19/2025 11 Dist Capital or Expense 6/11/2021 11 Damage Claims OH 4/27/2021 11 Repair/Obsol OH ST2 CT 8/22/2021 11 Corrective Maint OH Lines 8/5/2024 11 Elect Annual Proj - DESG CT 6/13/2023 11 Elect Annual Proj - DESG CT 7/23/2021 11 Repair/Obsol OH ST2 CT 4/20/2023 11 Elect Annual Proj - DESG CT 5/4/2021 11 Damage Claims OH 6/17/2021 11 Damage Claims OH 8/5/2024 11 Elect Annual Proj - DESG CT 9/27/2021 11 Dist Capital or Expense 1/27/2022 11 Elect Annual Proj - DESG CT 6/29/2021 11 Elect Annual Proj - DESG CT 3/21/2022 11 Elect Annual Proj - DESG CT 6/19/2025 11 Asset Mgmt - Specific DESG CT 6/22/2021 11 Corrective Maint UG Svc 6/18/2021 11 Damage Claims OH 11/29/2021 11 Asset Mgmt - Specific DESG CT 2/20/2025 11 Corrective Maint UG Svc 10/19/2021 11 Asset Mgmt - Specific DESG CT 6/18/2021 11 Damage Claims OH 8/30/2021 11 Elect Annual Proj - DESG CT 5/5/2021 11 Elect Annual Proj - DESG CT 11/18/2021 11 Dist Capital or Expense 12/12/2023 11 Corrective Maint OH Svc 5/10/2021 11 Damage Claims OH 5/12/2021 11 Damage Claims OH 3/22/2022 11 Elect Annual Proj - DESG CT 7/10/2021 11 Repair/Obsol OH ST2 CT 11/25/2024 11 Dist Capital or Expense 8/26/2021 11 Asset Mgmt - Specific DESG CT 8/7/2024 11 Asset Mgmt - Specific DESG CT 3/25/2022 11 Elect Annual Proj - DESG CT 5/25/2021 11 Repair/Obsol OH ST2 CT 4/5/2023 11 Elect Annual Proj - DESG CT 11/3/2022 11 Elect Annual Proj - DESG CT 5/29/2025 11 Elect Annual Proj - DESG CT 7/28/2021 11 Repair/Obsol OH ST2 CT 2/28/2024 11 Elect Annual Proj - DESG CT 6/16/2021 11 Repair/Obsol OH ST2 CT 10/6/2025 11 Dist Capital or Expense 3/10/2023 11 Asset Mgmt - Specific DESG CT 11/18/2021 11 Elect Annual Proj - DESG CT 7/1/2021 11 Damage Claims OH 7/1/2021 11 Damage Claims OH 6/14/2021 11 Damage Claims OH 5/25/2021 11 Damage Claims OH Subsequent Close Date 5/15/2026 8/26/2026 2/13/2026 6/26/2026 5/15/2026 9/16/2026 5/15/2026 364310 Poles and Appurtenance 1,532 3,099 6,536 1,020 6,675 7,177 (222) 12,168 22,873 4,657 3,868 6,707 12,554 1,081 780 1,147 3,579 516 13,075 4,581 4,434 2,385 5,705 4,652 1,743 3,913 1,779 1,162 1,999 4,064 620 579 3,949 14,626 3,842 (198) 4,122 4,924 2,561 7,624 1,774 (161) 406 3,194 551 10,765 4,283 3,405 (2) 461 2,709 4,038 1,055 924 7,251 2,569 170 3,123 4,727 6,314 728 10,349 5,338 489 6,996 2,656 2,719 11,649 66,747 5,152 4,939 2,229 1,710 3,729 3,091 3,687 1,577 41 313 17,106 146 4,865 2,633 7,335 14,326 342 533 947 19,041 29,468 10,006 1,464 5,481 1,803 2,341 15,782 2,735 171 3,857 3,459 6,748 4,768 66 804 960 365000 Overhead Conductors, Device 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 851 8,560 46 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 280 3,309 559 183 4,138 (222) 3,667 21,346 312 3,887 2,142 23,936 18 61 1,106 1,312 1,728 1,499 1,373 1,537 1,227 786 1,353 2,830 2,984 2,163 2,500 1,685 2,057 8,188 172 331 28,031 3,727 402 699 144 311 7,787 454 31,308 55 91 2,560 239 6,246 2,010 462 133 1,080 860 1,072 127 225 7,155 5,939 1,070 973 (198) 1,028 5,026 352 2,233 12,283 (161) 3,103 1,243 27 4,258 5,081 810 941 49 149 3,584 204 6,490 6,272 6,510 203 2,115 120 2,313 7,020 4,133 32 8,201 57 7,306 13,373 9,241 5,686 885 3,565 98,838 675 192 11,536 882 824 2,178 (161) 164 611 98 575 1,993 1,215 165 188 94 1,935 84 792 259 19 185 14,020 666 1,789 226 1,972 1,011 275 (0) 917 5,006 443 40 621 4,389 2,499 594 152 4,833 30,063 211 233 2,688 107 49 17,448 691 53 710 8,942 559 7,331 1,590 2,675 257 56 132 20,307 34,590 95 217 7,865 33,196 2,047 408 332 14 42 501 129 60 592 116 180 284 418 2,239 6,120 2,082 1,261 1,085 1,765 5,663 3,899 2,079 1,125 9,795 39,959 211 1,639 414 19 4,534 27,319 960 311 83 6,006 493 16 2,784 37 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,532 4,230 18,406 1,808 6,675 19,676 (445) 15,835 44,551 4,969 39,915 9,691 36,490 1,099 841 2,564 13,132 33,553 14,575 8,570 6,062 3,612 6,491 6,005 4,811 6,897 10,650 5,806 5,835 7,108 620 1,874 11,103 20,565 4,815 (397) 5,918 24,360 2,912 11,896 14,057 (484) 6,015 4,437 1,381 17,146 9,364 4,215 1,815 511 3,118 7,622 1,278 8,265 31,304 10,317 373 5,238 4,847 8,902 728 17,369 10,387 520 21,307 2,713 10,619 25,173 75,988 52,620 6,268 8,589 100,549 4,785 3,091 21,206 2,812 223 1,214 28,880 705 40,000 40,895 10,010 14,583 342 628 1,163 28,170 62,949 12,471 1,872 7,246 40,279 2,341 19,992 4,814 1,378 20,151 43,434 9,744 6,407 516 804 979
  4. Page 5 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 5 of 104 Work Order Number Description 80071633 JAM - 9A 31 CHRISTIAN LN, NEW BRIT 80071759 EJC 41 New Cheshire Rd, Meriden P#8 80071959 Ins Db Pri to New 500 KVA Pad for 1 80072001 *COMPLETE P# 3286 ASP Meriden Wate 80072039 *COMPLETE P. 93355 Ruggles Row PRI 80072140 CLINTON, COW HILL, 137, 80072457 *ASP JRP - Mulberry St SOG P#3455 R 80072501 CR-SIMSBURY, ROBERTS RD. SHIFT TO N 80072579 KD-EVENT #4514704 REPLC P 3475 NETT 80072591 * COMPLETE 29 Anne Rd. Pole 2862 PR 80072631 STWR3481893 10/23 9A Pritchard Rd W 80072637 1/7 RSO NEW HARTFORD, RAMSTEIN RD B 80072659 STWR3496802 9A: 11/27: WATERTOWN AV 80072681 *COMPLETE MJ P# 78 Meriden Waterbu 80072688 *COMPLETE Marion Ave POLE 1571-PRIO 80072691 * COMP Norton Rd. POLE 3086-PRIORIT 80072764 BM; SOUTHBURY, TRANSYLVANIA ESTATES 80072874 WRTN - DM - GLASTONBURY, PIPPIN, 15 80072939 STWR3378595 1/11 9A HAMILTON AVE WA 80073041 05.04.21 - 47 CLARK HILL RD, PROSPE 80073059 RR; 5/10/21 9A PEARL ( 3) ST -80073065 *WORK COMPLETE 05/24 MJ Norton St. 80073082 DG P#3022 81 PLUM RD THOMPSON CLP 3 80073409 * FRNTR 9A PDNB STWR3250922 EVW 9A; 80073608 *COMPLETE Maxwell Noble POLE 2103-S 80073753 *STWR3452973 MPB; 9A EAST ST NEW BR 80073804 COMP* STWR3381582 EJC 137 Kelsey St 80074030 COMP -AS BUILT REQ (20): KB-Baldwin 80074459 TL - BEAVER BROOK RD, #256 LYME // 80074651 *MRP -COMPLETE P 3539 Mountain Edge 80074828 *Jpt-77 Whiting St Plainville (New) 80075039 ASP* FRNTR STWR5710552 9A - JRP - M 80075042 5/14 9A STAFFORD ( 112) RD - P-281 80075044 NORWICH ( 448) RD -- 313, PLAINFIE 80075045 5/14 - 9A - Enfield, Hazard Ave - E 80075081 JDB 5/15: 9A- 60 CONNECTICUT AVE, N 80075209 WTG FOR PD RPT 10/11/24 (TH) 10/10/ 80075230 APPRENTICES KTI KD-EVENT #4517069 S 80075282 RA Project CD01678-02 ROW 180 Broo 80075415 **all work complete 9A - N Main / M 80075698 2400 Mountain Rd. Suffield Broken P 80075741 SC-71 WAUREGAN RD KILLINGLY R-10KVA 80075969 (REVIEW AS-BUILT) JSG/Burlington--7 80076126 ALL WORK COMPLETE 5/18/21 RSO - LEA 80076168 ALL WORK COMPLETE 5/19/2021 CHECK P 80076257 BM; NEWTOWN, PLUMTREES, 15, Chris B 80076395 GC - LEDYARD, COLONEL LEDYARD, 447 80076816 * PMV - 655 Christian Lane Berlin 2 80077026 BRANFORD, THOMPSON, 10, MARK DILUNG 80077121 KD-EVENT #4519438/4519478 TREE V PO 80077159 CR-4519392 OXBOW DR AVON SAME AS WO 80077240 MV; LINE EXTENSION TATER HILL NEED 80077742 * ASP 7/27 MRP - Flanders St. POLE 80078067 TW - Conv. 1075248 - Make Ready Non 80078162 *D&D*Conv. 1635769 - Make Ready Non 80078194 MDB - SOUTH KENT, GEER MOUNTAIN, 14 80078211 9A CAR VS POLE BRANFORD, CT 06405 80078241 MV - STONINGTON, 473 N MAIN ST, I/R 80078246 WF-RAINBOW RD WINDSOR CT-@ pole-172 80078308 * COMPLETE- MAR-Post Const.- Thistl 80078343 MV - STONINGTON, 344 FARMHOLME RD, 80078361 JSG - WEST HARTLAND, PINEHURST, 43, 80078365 05-24-2021 REMAINING WORK - SPRING 80078381 KTI MDB - SOUTH KENT, FLAT ROCK, 63 80078508 WM; MONROE, MAIN, 814, Ron Belleno 80078559 zzDONE----CROM---141 Nooks Hill Rd80078745 *ASP MAR -Regency P#3967-SOG-POLE-P 80078753 GC - 9A - 5/25 - Ledyard, Naomi Dr 80078760 *COMPLETE - MAR PostConst.-P#3658 F 80078898 JAM - (9A) 05.22.21 - 12 WARD ST, 80078919 *D&D*74 HIGH STREET, BRISTOL - DEFE 80079073 SC-298-300 CRANBERRY BOG RD KILLING 80079184 *ASP* KA - Conv # 1064745 - Make Re 80079302 *JRP - 168B Center St SOG Disc/Reco 80079402 DG P#63 BUTTS RD ROW WOODSTOCK BRKN 80079549 *D&D* TW - Conv. 1635726 - Make Rea 80079784 *D&D*Conv. 1633857 - Make Ready Non 80080074 *D&D* 20 ROSEMONT AVE, BRISTOL - DE 80080156 EB; MOTT ( 12) LN -- 5322, MOODUS 80080178 JMS- N MAIN ( 1102) ST -- S98, WEST 80080210 CD01536-02 Recond w/ 556TW & Inst. 80080219 KD-EVENT #4524578/4525220 TURNOVER 80080353 9A KD-EVENT #4524792 CAR V P 9305 W 80080461 MJ 2/4 MAR-Update poles to 45/2's n 80080532 *D&D* 56 CLAREMONT STREET, BRISTOL 80080646 *D&D*380 EAST ROAD, BRISTOL - DEFEC 80080786 *MJ* MAR - Ciccio Rd.P#4328-PRIORI 80080800 Mtl-JAM - 18 Kenton Street Berlin 80080820 MM - *WORK COMP IN FIELD* - 3 OLMST 80080843 Wormwood Hill Rd 609, Mansfield. Re 80080873 *D&D*accept estimate 410 EAST ROAD, 80080916 * JAM - 2288 Chamberlain Hwy Berlin 80080988 MV - MYSTIC, 3175 GOLD STAR HWY, /R 80081041 Jpt/MAR-155 North St Bristol (Frnt) 80081052 *9A-10/13-Install 40'/2 riser p RSO 80081097 JRP - Tress Rd PROSPECT Shift to Fr 80081124 ok to close 9A - 10/12 - RSO - [CIV 80081213 *D&D*DSL-Conv#1045199-PriorityMakeR 80081445 9A KD-EVENT #4525805 CAR V P 376 WE 80081518 RM, NEWTOWN( 436) TPKE -- 25334, WE 80081532 *D&D*16 MINNESOTA LN, BRISTOL - DEF 80081592 *D&D*431 MARCIA DRIVE, BRISTOL - DE 80081817 GC - install new anchor 1691R Cente 80081877 (9A) 06.01.21 - 142 MARIONDALE DR, 80081917 (9A) 06.01.21 - 1678 MERIDEN WATERB in-service date work order type 5/17/2021 11 Damage Claims OH 5/1/2023 11 Damage Claims OH 11/2/2022 11 Elect Annual Proj - DESG CT 6/8/2021 11 Elect Annual Proj - DESG CT 6/8/2021 11 Elect Annual Proj - DESG CT 7/7/2021 11 Elect Annual Proj - DESG CT 7/30/2021 11 Elect Annual Proj - DESG CT 7/2/2021 11 Repair/Obsol OH ST2 CT 10/12/2021 11 Corrective Maint OH Lines 6/8/2021 11 Elect Annual Proj - DESG CT 3/15/2023 11 Damage Claims OH 5/22/2023 11 Elect Annual Proj - DESG CT 6/7/2021 11 Damage Claims OH 6/8/2021 11 Elect Annual Proj - DESG CT 6/8/2021 11 Elect Annual Proj - DESG CT 6/30/2021 11 Elect Annual Proj - DESG CT 10/17/2022 11 Elect Annual Proj - DESG CT 3/5/2025 11 Elect Annual Proj - DESG CT 5/28/2021 11 Damage Claims OH 5/12/2021 11 Repair/Obsol OH ST2 CT 6/15/2021 11 Damage Claims OH 6/8/2021 11 Elect Annual Proj - DESG CT 1/17/2023 11 Elect Annual Proj - DESG CT 10/20/2025 11 Damage Claims OH 6/8/2021 11 Elect Annual Proj - DESG CT 8/9/2021 11 Damage Claims OH 9/28/2023 11 Damage Claims OH 8/19/2024 11 Asset Mgmt - Specific DESG CT 7/21/2022 11 Elect Annual Proj - DESG CT 6/8/2021 11 Elect Annual Proj - DESG CT 11/16/2021 11 Elect Annual Proj - DESG CT 11/7/2023 11 Damage Claims OH 5/18/2021 11 Damage Claims OH 7/28/2021 11 Repair/Obsol OH ST2 CT 5/21/2021 11 Damage Claims OH 6/7/2021 11 Damage Claims OH 10/21/2024 11 Dist Capital or Expense 11/28/2023 11 Elect Annual Proj - DESG CT 5/17/2021 11 Asset Mgmt - Specific DESG CT 2/24/2025 11 Damage Claims OH 5/21/2021 11 Damage Claims OH 8/30/2021 11 Elect Annual Proj - DESG CT 4/20/2022 11 Dist Capital or Expense 6/7/2021 11 Repair/Obsol OH ST2 CT 5/25/2021 11 Repair/Obsol OH ST2 CT 10/25/2024 11 Elect Annual Proj - DESG CT 3/21/2023 11 Elect Annual Proj - DESG CT 11/22/2021 11 Elect Annual Proj - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 7/16/2021 11 Repair/Obsol OH ST2 CT 6/21/2021 11 Repair/Obsol OH ST2 CT 7/20/2022 11 Elect Annual Proj - DESG CT 8/2/2021 11 Elect Annual Proj - DESG CT 1/3/2022 11 Elect Project - DESG CT 5/16/2025 11 Dist Capital or Expense 7/29/2021 11 Asset Mgmt - Specific DESG CT 6/29/2021 11 Damage Claims OH 1/10/2022 11 Asset Mgmt - Specific DESG CT 12/3/2021 11 Elect Annual Proj - DESG CT 6/9/2021 11 Elect Annual Proj - DESG CT 1/4/2022 11 Elect Annual Proj - DESG CT 6/10/2021 11 Elect Annual Proj - DESG CT 9/22/2021 11 Corrective Maint OH Lines 9/2/2021 11 Street Light - DESG CT 9/1/2021 11 Elect Annual Proj - DESG CT 6/22/2021 11 Repair/Obsol OH ST2 CT 8/6/2021 11 Elect Annual Proj - DESG CT 9/13/2021 11 Damage Claims OH 6/9/2021 11 Elect Annual Proj - DESG CT 6/3/2021 11 Damage Claims OH 2/14/2023 11 Elect Annual Proj - DESG CT 1/5/2022 11 Elect Annual Proj - DESG CT 7/28/2025 11 Dist Capital or Expense 11/29/2021 11 Asset Mgmt - Specific DESG CT 1/12/2022 11 Elect Annual Proj - DESG CT 8/21/2025 11 Dist Capital or Expense 7/22/2025 11 Dist Capital or Expense 11/25/2022 11 Elect Annual Proj - DESG CT 6/22/2021 11 Damage Claims OH 6/18/2021 11 Damage Claims OH 8/3/2022 11 Asset Mgmt - Specific DESG CT 7/2/2021 11 Repair/Obsol OH ST2 CT 7/6/2021 11 Damage Claims OH 6/22/2022 11 Elect Annual Proj - DESG CT 2/14/2023 11 Elect Annual Proj - DESG CT 11/25/2022 11 Elect Annual Proj - DESG CT 7/6/2021 11 Elect Annual Proj - DESG CT 6/28/2021 11 Private Work - No Co Asset 10/16/2024 11 Elect Annual Proj - DESG CT 2/8/2025 11 Elect Annual Proj - DESG CT 11/25/2022 11 Elect Annual Proj - DESG CT 11/9/2021 11 Asset Mgmt - Specific DESG CT 10/12/2021 11 Elect Annual Proj - DESG CT 7/13/2022 11 Elect Annual Proj - DESG CT 10/20/2025 11 Damage Claims OH 10/22/2021 11 Private Work - No Co Asset 10/26/2024 11 Dist Capital or Expense 4/19/2023 11 Elect Project - DESG CT 7/30/2021 11 Damage Claims OH 11/26/2024 11 Elect Annual Proj - DESG CT 2/15/2023 11 Elect Annual Proj - DESG CT 11/25/2022 11 Elect Annual Proj - DESG CT 4/12/2022 11 Elect Annual Proj - DESG CT 6/9/2021 11 Damage Claims OH 6/9/2021 11 Damage Claims OH Subsequent Close Date 6/26/2026 1/22/2026 1/22/2026 6/26/2026 1/22/2026 364310 Poles and Appurtenance 10,127 1,304 4,692 6,776 1,905 2,407 2,478 163 303 4,044 251 2,997 262 4,636 6,339 4,135 2,771 1,604 405 219 861 2,287 26,385 1,120 1,716 207 1,449 23,983 11,847 3,615 11,041 865 4,406 498 2,762 12,817 2,644 36,610 65,016 3,583 397 1,279 11,694 5,594 574 1,090 161 522 1,204 5,432 293 3,587 (150) 3,085 7,213 298 104 2,964 7,375 2,393 2,112 1,520 4,656 4,724 206 586 3,854 930 2,371 39 5,792 2,287 9,001 610 (259) (32,315) 13,913 1,326 5,180 1,180 61,145 2,934 4,950 10,890 2,342 2,993 2,919 693 21,607 5,370 2,734 5,556 21,617 2,849 3,823 729 2,348 100 3,786 712 4,705 2,937 166 8,703 8,151 365000 Overhead Conductors, Device 11,202 449 2,580 4,621 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 10,220 368330 Equipment Overhead 20,836 620 2,478 530 23 1,721 525 985 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 1,613 888 2,478 139 2,424 1,486 1,284 934 1,153 105 21,930 276 56 24,363 688 28 6,108 20,378 2,086 1,566 13,673 17,795 157 535 247 252 2,561 383 86 694 15,907 415 308 53 323 107 4,156 10,078 1,760 1,733 346 122,786 2,039 231 1 55 85,280 624 17 1,722 452 3,334 1,825 1,937 2,570 1,809 (48) 2,195 7,239 515 61 1,722 119 549 7,002 9,592 2,328 2,002 1,442 746 138 13,581 529 559 1,021 435 589 403 47 24 158 157 128 56 290 (286) 167 460 256 3,618 115 346 3,680 666 2,769 (259) (52,973) 1,026 728 1,614 272,852 786 62 3,756 1,196 1,476 432 301 2,415 451 1,251 1,289 418 3,151 1,307 1,520 1,388 2,616 263 2,367 1,505 509 6,114 5,850 18 7,039 1 120 253 624 225 1,918 81 48 796 425 265 345 266 462 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 31,549 1,753 29,721 11,397 1,905 3,916 7,433 693 326 5,766 776 3,981 262 4,636 6,478 6,559 26,463 2,944 1,339 1,371 965 2,287 53,561 1,807 1,716 235 7,557 44,991 14,713 5,181 41,035 18,969 4,563 1,086 2,762 13,140 2,751 40,767 75,095 5,342 2,130 1,680 219,760 8,257 822 2,812 733 15,176 15,370 7,507 2,863 19,159 (198) 5,280 14,452 1,261 294 5,202 7,375 2,921 2,552 2,797 5,091 5,313 4,228 633 3,854 1,045 2,718 39 5,792 13,026 10,041 4,002 (517) (85,288) 14,939 1,326 5,907 2,794 334,222 3,720 5,012 16,564 3,537 4,469 3,351 994 24,022 5,370 3,185 7,683 23,380 3,532 6,974 2,381 3,868 1,488 6,402 976 7,073 4,442 941 15,279 14,002
  5. Page 6 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 6 of 104 Work Order Number Description 80081938 PD 2 JORDAN COVE CIRCL WTFD/UPGRAD 80081963 15DD 12/9 DMD - 2300 BERLIN TPKE 80082029 MV-SALEM, 200 FORSYTH RD, INST PRI 80082038 *D&D* 141 MARCIA DRIVE, BRISTOL - D 80082127 DONE PRINT CRP - 09/09 RSO (SANTAM) 80082216 9A KD-EVENT #4528969/4529093 CAR V 80082420 WRTN - DM - 21H15 PORTLAND - LOAD B 80082465 GC / 12 MAINE COURT 80082515 LD 60 WILTON RD WESTPORT INS DB PRI 80082539 PD-334 ROPE FERRY RD WATERFORD/NEW 80082593 MISSING CIVARDI TIME 9A CAR V P SOU 80082602 WO 18646870, INT-98103, DG UPGRADE 80082603 (MJ Dock Crew) EVENT #4528062 REPL 80082656 **HOLD** POST CONTRUCTPM-Critical Y 80082769 ASH SWAMP RD 80083407 MK - Litchfield CD01242--DG Solar E 80083409 DONE EVW - 39 Cobble Rd, Salisbur 80083431 JMS- WINDSOR 812 BLOOMFIELD AVE 80083479 MCB - E MAIN ST, MERIDEN, CAR VS PO 80083623 CR-BUSHY HILL RD, SIMS, CAR VS P# 2 80083891 APPT Wed 7/14/21 9am---INSP--zBLOOM 80083896 6/9 9a KING ( 1675) ST -- 56, ENFIE 80084160 6/9 - 9A - Tolland, Old Cathole Rd 80084446 * COMP MJ MAR - P#86079 E. Summer S 80084656 EVW - WTG FOR PD RPT 10/15/24 (VR) 80084690 AMM 199 PLAINVILLE AVE,FARM - 9A P# 80084693 AMM 382 MEADOW RD,FARM. FRONTIER PO 80084720 9A KD-EVENT #4533295 CAR V P 2837 C 80084833 *** MJP/Davenport Ridge Rd/STM/CD00 80084834 ***MJP/Davenport Ridge Rd/NW-CAN/CD 80084880 *COMP MJ MAR - P#86175 Burwell - PO 80084994 CR-160 COUNTRY CLUB RD. AVON, REMOV 80085162 RA CD01246-01 ROW 13B21/13B27 ROW 80085169 DG P#3787 1678 RT 169 WOODSTOCK FRN 80085285 PD-200 GREAT NECK RD WATERFORD/4-LO 80085552 JLB 9A- 241 BELDEN HILL RD, WILTON/ 80085574 2.28 SECOND REQ PR MM 9A pole #1636 80085577 SC-P#889 FISK ST HAMPTON INST 45/2 80085580 PLANNED RC POLE 1202 REPLACE CAP BA 80085635 MCB - 06.10.21 - STRAWBERRY HL, DUR 80085810 WRTN - DM- 2 PORTLAND RD MARLBOROUG 80085878 MK - Litchfield CD01242--DG Solar E 80086077 MR Abel-PCC - 10 AVERY SHORES RD., 80086206 ZN Conv#1040107-MakeReadyNonReimb-T 80086210 prechecked REPLACE-OH-ANNUAL-DESG 80086236 (9A) 06.12.21 - 378 SOUTH ST, NEW B 80086573 ZN Conv#1040107-MakeReadyNonReimb-T 80086650 DONE 3/28 EVW - 60 Selleck Hill Rd, 80086852 ASP - PL:REPL JNCTN P#61386 & P# 61 80087553 MADISON, BOSTON POST, 634, 80087906 (9A) 06.19.21 - 682 QUEEN ST, SOUTH 80087982 GUILFORD, SHEEP PASTURE, 55 , Mark 80088035 Shift 2 frontier poles and replace 80088045 Ratley Rd 1250, Suffield. 10/15-RSO 80088113 *D&D*ontier Pole Inspection Pole Sh 80088145 JFC - 9A VEHICLE ACCIDENT, 6/20 EAS 80088182 *D&D*Frontier Pole Inspection Pole 80088204 JRP - 1395 Meriden Rd WOLCOTT Repl 80088383 DB-Bailey Cir, New London, cust. co 80088417 9A KD-EVENT #4538881 TRUCK V P 1341 80088499 ALL WORK COMPLETE 6/22 TURNOVER EAS 80088632 WEBSTER RD., ELLINGTON - SHIFT TO R 80088788 TL - HALLS RD, #90 OLD LYME // NEW 80088798 (9A) 06.22.21 - 70 SUNNYSIDE AVE, W 80088806 MM 9A #208 S Burnham Hwy Lisbon Ev 80088852 PD-107 MONTAUK AVE N. LONDON/RPLC P 80088862 (Prentice balance material) MRP 80089026 PL: (TEMP SVC) 850 MURDOCK AVE, MER 80089081 F.COMPL. *9A-10/16-RSO-[WINIAMF]-W 80089102 MM 71 Hyde Rd Brooklyn shift pole # 80089340 GC -06-21 MARA- - RPLC ROTTEN FRONT 80089422 MATERIAL DJM. 44 CLINTON AVE WESTPO 80089783 MK - Litchfield CD01242--DG Solar E 80089814 MAP KEEPING OPEN 80089817 SC-COLBRIDGE RD PLAINFIELD INST NEW 80090102 complete- PMV - CD00744-02 Install 80090162 ALL WORK COMPLETE RSO TURNOVER 9A 6 80090184 6/26 9A BLUE HILLS ( 1168) AVE -- 5 80090190 PD-31 WILLETTS AVE N. LONDON/RPLC 80090236 JV; 9A 6/26 BROWNING ( 24) RDcomp 80090249 COMPLETED CUST APPT 7/27 BM; SOUTHB 80090587 MK - Litchfield CD01242--DG Solar E 80090599 JMS-W HTFD ONE PARK RD - NEW APT CO 80090620 E HTFD, 249 SILVER ST - OH TO UG PR 80090889 C 80090978 MV - Elm St Stonington 80091000 DG P#11 27 COUNTY HOME RD THOMPSON 80091035 DG P#3676 72 CHANDLER SCHOOL RD WOO 80091469 MV - STONINGTON, 877 STONINGTON RD, 80091496 WAITING MUNI 6/2/22 OH WORK COMP CR 80091520 EVW - SELLECK HILL RD, SALISBURY P1 80091569 PD-116 SHORE RD WATERFORD/RPLC OH W 80091827 FLETCHER RD 120, ENFIELD - NEW 400A 80091920 DG P#227 RIVERSIDE DR THOMPSON FRNT 80092096 AMM 58 FARMINGTON AVE, FARMINGTON. 80092097 YA; 10 HILLSIDE RD; INST 2 POLES, 3 80092221 PRE245 NEED MATERIAL 1.28.22 9A CAR 80092254 RC REPLACE POLE 1360. 80092299 ALL WORK COMPLETE 7/1/21 (RSO - LEA 80092318 MK - Litchfield CD01242--DG Solar E 80092377 (E) W HTFD 31 BAINBRIDGE RD -- S243 80092409 9A KD-EVENT #4549664 CAR V P 9568 T 80092459 9A CAR VS POLE/pending possible add 80092481 7/2/21 9A HIRAM HILL RD MONROE - Fr 80092581 COPIED FROM WO# 4895888 Replace bro in-service date work order type 6/30/2021 11 Elect Annual Proj - DESG CT 11/22/2024 11 Elect Annual Proj - DESG CT 9/27/2022 11 Elect Annual Proj - DESG CT 2/14/2023 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 7/14/2021 11 Damage Claims OH 5/1/2025 11 Elect Annual Proj - DESG CT 11/16/2021 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/21/2025 11 Corrective Maint UG Svc 6/15/2021 11 Damage Claims OH 3/13/2025 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 10/29/2024 11 Elect Annual Proj - DESG CT 12/8/2025 11 Dist Capital or Expense 1/20/2023 11 Asset Mgmt - Specific DESG CT 8/31/2021 11 Street Light - DESG CT 11/12/2021 11 Damage Claims OH 6/23/2021 11 Damage Claims OH 6/24/2021 11 Damage Claims UG 10/5/2022 11 Elect Annual Proj - DESG CT 6/17/2021 11 Damage Claims OH 6/15/2021 11 Damage Claims OH 6/30/2021 11 Elect Annual Proj - DESG CT 11/13/2024 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 10/15/2025 11 Dist Capital or Expense 7/2/2021 11 Damage Claims OH 3/10/2023 11 Asset Mgmt - Specific DESG CT 3/10/2023 11 Asset Mgmt - Specific DESG CT 6/30/2021 11 Elect Annual Proj - DESG CT 11/4/2021 11 SV Exist OH/UG NOND ST2 CT 10/11/2023 11 Asset Mgmt - Specific DESG CT 9/10/2021 11 Elect Annual Proj - DESG CT 12/17/2021 11 Elect Annual Proj - DESG CT 5/6/2023 11 Damage Claims OH 6/23/2021 11 Damage Claims OH 8/26/2021 11 Elect Annual Proj - DESG CT 6/9/2022 11 Dist Capital or Expense 6/28/2021 11 Repair/Obsol OH ST2 CT 8/7/2025 11 Dist Capital or Expense 1/20/2023 11 Asset Mgmt - Specific DESG CT 2/28/2022 11 Asset Mgmt - Specific DESG CT 11/6/2023 11 Elect Project - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 6/28/2021 11 Damage Claims OH 9/26/2023 11 Elect Project - DESG CT 4/13/2022 11 Elect Annual Proj - DESG CT 1/26/2022 11 Corrective Maint OH Lines 10/14/2021 11 Elect Annual Proj - DESG CT 10/7/2021 11 Damage Claims OH 12/21/2021 11 Elect Annual Proj - DESG CT 8/5/2021 11 Corrective Maint OH Lines 10/22/2024 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 8/3/2021 11 Damage Claims OH 10/5/2022 11 Elect Annual Proj - DESG CT 3/10/2022 11 Elect Annual Proj - DESG CT 7/26/2021 11 Elect Annual Proj - DESG CT 8/3/2021 11 Damage Claims OH 6/30/2021 11 Damage Claims OH 4/7/2025 11 Elect Annual Proj - DESG CT 10/18/2021 11 Elect Annual Proj - DESG CT 9/14/2021 11 Damage Claims OH 6/29/2021 11 Damage Claims OH 7/27/2021 11 Repair/Obsol OH ST2 CT 12/30/2025 11 Dist Capital or Expense 9/22/2025 11 Temporary Work DESG CT 12/19/2024 11 Damage Claims OH 9/17/2021 11 Elect Annual Proj - DESG CT 9/3/2021 11 Dist Capital or Expense 12/31/2024 11 Corrective Maint UG Svc 1/20/2023 11 Asset Mgmt - Specific DESG CT 4/2/2025 11 Damage Claims OH 10/21/2021 11 Elect Annual Proj - DESG CT 2/15/2023 11 Dist Capital or Expense 6/30/2021 11 Damage Claims OH 7/20/2021 11 Damage Claims OH 9/10/2021 11 Corrective Maint OH Lines 7/15/2021 11 Damage Claims OH 10/25/2024 11 Asset Mgmt - Specific DESG CT 11/7/2023 11 Asset Mgmt - Specific DESG CT 1/5/2023 11 Elect Annual Proj - DESG CT 8/24/2023 11 Asset Mgmt - Specific DESG CT 10/30/2024 11 Damage Claims OH 7/16/2021 11 Repair/Obsol OH ST2 CT 10/28/2025 11 Dist Capital or Expense 2/9/2024 11 Elect Annual Proj - DESG CT 12/20/2021 11 Elect Annual Proj - DESG CT 3/12/2024 11 Elect Annual Proj - DESG CT 7/27/2021 11 Repair/Obsol OH ST2 CT 8/17/2021 11 Asset Mgmt - Specific DESG CT 8/6/2025 11 Elect Annual Proj - DESG CT 7/21/2021 11 Damage Claims OH 12/20/2021 11 Elect Annual Proj - DESG CT 11/2/2021 11 Elect Annual Proj - DESG CT 11/3/2021 11 Damage Claims OH 12/4/2024 11 Street Light - DESG CT 8/24/2021 11 Dist Capital or Expense 11/7/2023 11 Asset Mgmt - Specific DESG CT 5/19/2023 11 Elect Annual Proj - DESG CT 8/20/2021 11 Damage Claims OH 12/3/2021 11 Damage Claims OH 7/29/2021 11 Damage Claims OH 7/28/2021 11 Repair/Obsol OH ST2 CT Subsequent Close Date 6/26/2026 9/16/2026 2/13/2026 9/16/2026 9/16/2026 5/15/2026 4/20/2026 4/20/2026 364310 Poles and Appurtenance 1,272 980 2,302 2,699 701 964 4,142 (128) 951 1,854 4,204 1,716 17,256 3,022 182 (308,604) 8,421 10,233 10,631 1,484 8,205 12,173 24,858 533 959 1,470 320 7,053 (0) 170 4,771 5,097 781,138 528 8,515 1,894 9,161 1,947 433 152 2,589 (11,621) 9,371 5,640 2,395 899 1,690 430 (321) 2,062 2,734 7,461 68 374 1,660 1,350 84 (1,153) 8,121 5,608 2,976 469 3,167 843 2,860 749 6,858 820 48 42 46 5,953 (2,685) 4,821 21,782 2,613 1,101 12,436 2,112 9,166 657 (1,409) 2,255 282 7,135 2,003 1,645 303 7,684 (20) 2,273 361 4,727 1,581 7,112 3,127 1,385 221 151 120 (116) 2,120 443 3,451 3,290 365000 Overhead Conductors, Device 387 3,001 944 789 817 2,245 (128) 1,123 1,161 112 600 4,854 94,329 1,338 (370,506) 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,185 5,701 96 9,010 2,183 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 118 32 339 238 204 7,513 (396) 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 274 391 363 (69,677) 1,075 7,055 204 2,329 6,767 2,115 205 1,251 1,518 661 1,660 413 1,672 9,511 29,552 109 1,788,004 1,495 8,706 1,438 2,228 13,030 1,873 479 1,690 (11,693) 2,690 1,611 12 381 3,981 1,415 26,549 84 314 (102) 703 114 115 493 2,023 (321) 1,819 1,197 3,846 20 179 841 184 588 (178) 8,646 1,189 2,644 920 269 288 1,030 21,282 466 11,547 331 119 (116) 97,759 814 682 404 2,377 76 378 126 1,638 (307) 461 (290) 80 214 44,961 72,859 26 225 632 (2,370) 11,031 17,144 56,308 1,730 2,698 280 388 3,261 (10,625) 1,912 1,234 5,903 2,617 5,876 860 9,581 (36) 446 53 1,797 3,469 5,764 1,469 114 761 21,607 1,109 57 1,301 31 2,033 459 22 365 41,003 5,067 2,988 5,108 93 62 219 255 1,857 365 326 566 (348) 350 848 100 7,633 5,999 621 120 (116) 120 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,933 4,438 11,164 3,488 701 1,781 6,387 (255) 11,419 5,199 4,316 2,911 22,110 97,351 9,396 (749,184) 8,421 11,308 17,686 1,688 10,534 19,602 28,634 737 2,209 3,400 320 8,725 9,511 29,734 4,771 5,205 2,569,142 3,165 42,808 3,332 11,388 16,392 28,855 715 4,594 (23,416) 13,446 7,366 2,395 1,014 2,183 5,234 (643) 15,882 3,931 13,071 87 553 2,501 1,534 671 (1,927) 17,228 6,797 5,619 1,469 3,649 1,131 3,891 749 145,960 1,311 48 1,434 46 7,885 (5,055) 15,852 41,450 58,944 2,831 15,134 2,392 9,554 7,272 (12,034) 52,135 6,676 13,038 5,047 7,521 1,707 18,086 (404) 2,719 764 7,472 5,051 21,129 10,595 1,499 221 482 478 (347) 99,879 443 4,265 3,290
  6. Page 7 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 7 of 104 Work Order Number Description 80092632 9A CAR VS POLE BRANFORD 80092701 CRP - replace reject pole 233 Steel 80093089 9A 07/02 81 ADAMS ST MANCHESTER POL 80093165 7/5 - 9A - Southbury, River Rd - ca 80093181 9A KD-EVENT #4552730 CAR V P 613 S 80093509 JES; 238 W.ROCKS RD. NORWALK, REPLA 80093525 EB; 7/6 SMITH RD EAST HADDAM 80093541 EVW - 9A 417 Newfield Rd, Torringt 80093626 DG P#3615 RT 197 WOODSTOCK FRNTR RP 80093672 KD- EVENT #4553497 REPLACE P 10663 80093969 DG P#4446 RT 171 WOODSTOCK FRNTR RP 80094038 7/8/21 44 PINE ROCK RD SOUTHBURY RD 80094056 7/7/21 WHEATON RD NEW MILFORD 80094218 PL: INST POLE #13595, REPL POLE #46 80094251 JDB 11/18/24 PD REPORT ENTERED (RR) 80094275 LAURELWOOD LN., VERNON - NEW 16-LOT 80094480 ***FCOMP***----zHAR OH 9A 10/16 - 1 80094682 CON40 MJGw - CDOT 82-321 Bridge No. 80096316 JLB 88 OLD HILL RD, WESTPORT MULTI 80096401 MAR - 119 Lincoln St, Naugatuck CT 80096561 ALL WORK COMPLETE RSO TURNOVER 7/12 80096673 *D&D*ZN Conv#1126340-MakeReadyNonRe 80096725 DR-LITCHFIELD CD01242- DG Solar Exp 80097011 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097020 BRANFORD, COMMERCIAL, 131, Babbidge 80097038 print 12/21 EVW - 50 Tower Hill Rd, 80097049 9A CAR VS POLE # 1567 80097122 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097225 DG P#525 CRYSTAL POND RD EASTFORD F 80097258 MJ-MAR - Pole Replacement done(More 80097274 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097540 CR-141 WEST ST. SIMS, P# 2715, NEW 80097647 MR; ***ALL WORK COMPLETED*** 07-06 80097708 7/15 - Oxford, E Hill Rd - Replace 80097793 MAR - POST CONST> 7/14/21 NEED TT W 80098069 MCB - 07.04.21 - 1081 WATERTOWN AVE 80098084 BC - CD02567 - Town of Union - Inst 80098220 WRTN--JK/DM>P-1386--FTR TO SET POLE 80098549 (9A) 07.18.21 - 301 CLOUGH RD, WATE 80098559 9A -ADAMS (81) ST -- 1903, MANCHEST 80098669 ZN Conv#1074417-MakeReadyNonReimb-M 80098732 (9A) SD 251 OREGON RD, MERIDEN / EV 80098770 DG P#577 421 BROOKLYN RD POMFRET CL 80098855 MAR - Replace leaning/rotten pole # 80099151 *D&D*JS - Conv. 1635940 - Make Read 80099158 KD-EVENT #4571273 REPLC P 7741 EAGL 80099256 PD-22 PARK DRIVE WATERFORD/RPLC OH 80099264 MDB-HICKORY HILL RD., PHASE #2 80099389 DG P#819 BABBITT HILL RD POMFRET 2 80099655 ASP - Jpt-1275 (Rear) Wolcott Rd W 80099663 D&D TPA NetSpeed LLC Convo # 112630 80099733 JRP - 504 Wolcott Rd WOLCOTT Inst 1 80099962 MG; PRI CABLE FAULT; RPL CBL FROM P 80100249 MJ 12/10 -224 KUKAS LN, WATERBURY 80100382 MR; ***ALL WORK COMPLETED***9A 7/23 80100422 (9A) 07.22.21 - 76 JEFFREY LN, NEWI 80100487 DONE CRP - CASE ( 5) ST -- 275, 80100581 CD01244 Cranberry Bog Rd DG ( OLD S 80100582 CR-353 LOVELY ST AVON SHIFT POLE 40 80100822 OH COMP - METER PREQ ASPLUNDH 12/1 80100867 2.28 SECOND REQ PR MM 9A pole #475 80100917 9A HIGHLAND ( 341) ST -- 4914, MAN 80100960 MRP - POLE 16301S - CHRISTIAN RD MI 80101019 2/23 BYPASS MUNI DISCONNECT/RECONNE 80101040 GC - 7/25 CHURCH ( 21) LN -- , UN 80101141 CD01633 - White St Danbury Road Wi 80101144 (9A) 07.24.21 - 1453 NEW HAVEN RD, 80101330 23 RIVERSIDE DRIVE, PAWCATUCK 80101487 SD 218 JACKSON HILL RD, MIDDLEFIELD 80101617 Jpt-466 Willis St Bristol (Frnt)P41 80101637 Run 1/0 TW from 1326 to new FTR P-1 80101897 MR; ***ALL WORK COMPLETED***9A 7/27 80101939 40 ASHWORTH AVENUE 80102186 PD-450 PROV-N.L. TPKE N. STONINGTON 80102359 KD-EVENT #4579059 LOW SVC P 1120 Ol 80102443 07/28 MANCHESTER, 400 TOLLAND TPKER 80102513 * AMM 120 NEWINGTON AVE, NEW BRITAI 80102633 JDB 111 ROWAYTON AVE NWLK SHIFT P35 80102748 appt 1/4 EVW - 84 Railroad St, 80102759 MR; ***ALL WORK COMPLETED***Replace 80102820 MM 20 CREASEY RD BRKLYN P# 1084 rep 80102874 * WORK COMPLETE (9A) 1837 STANLEY S 80102890 07/29 ORCHARD RD EAST HADDAM POLE 2 80103004 PL: ELEC TO CUT & KICK POLE FOR TEL 80103197 7/30 - 9A - ENFIELD, ABBE RD - P-14 80103217 9A KD-EVENT #4581579 CAR V P 4067 T 80103321 JFC - WESTSIDE ( 199) RD -- , GOSH 80103434 CD01789 - Lateral Reliability - 2A4 80103439 CD01789 - Lateral Reliability - 3B1 80103454 PROJ CD01789 - Lateral Reliability 80103478 CD01789 - Lateral Reliability - 15U 80103502 CD01789 - Lateral Reliability - 1C0 80103527 *CD01789 - Lateral Reliability - 11 80103537 *CD01789 - Lateral Reliability - 7L 80103555 CD01789 - Lateral Reliability - 13H 80103725 CD01789 - Lateral Reliability - 13K 80103831 briggs CD01789 - Lateral Reliabilit 80103837 CD01789 - Lateral Reliability - 11M 80104227 KD-EVENT #4580652 SHIFT P 4870 S Ke 80104254 POLE 4574 INSTALL CV SERVICE APPREN 80104264 10/18/24 - 9A - LIBERTY ST, PAWCATU 80104286 RL: 1 SMITH RD. 1200 AMP 3 PHASE; 3 80104291 JMS- 08/03 PROSPECT AVE WEST HARTFO 80104412 TL - JOSHUATOWN RD, #100-5 LYME // 80104723 9A 08/05 HARTFORD RD MANCHESTER in-service date work order type 8/3/2021 11 Damage Claims OH 1/6/2022 11 Elect Annual Proj - DESG CT 7/14/2021 11 Damage Claims OH 7/29/2021 11 Damage Claims OH 8/12/2021 11 Damage Claims OH 4/20/2023 11 Elect Annual Proj - DESG CT 8/7/2021 11 Corrective Maint OH Lines 8/31/2021 11 Damage Claims OH 7/29/2021 11 Repair/Obsol OH ST2 CT 10/18/2021 11 Elect Annual Proj - DESG CT 7/29/2021 11 Repair/Obsol OH ST2 CT 9/23/2021 11 Corrective Maint OH Lines 8/8/2021 11 Corrective Maint OH Lines 10/22/2021 11 Elect Annual Proj - DESG CT 12/3/2024 11 Damage Claims OH 11/9/2023 11 Elect Annual Proj - DESG CT 10/29/2024 11 Dist Capital or Expense 4/18/2023 11 Elect Annual Proj - DESG CT 10/20/2022 11 Elect Annual Proj - DESG CT 3/28/2025 11 Dist Capital or Expense 8/24/2021 11 Corrective Maint OH Lines 4/1/2024 11 Elect Project - DESG CT 1/20/2023 11 Asset Mgmt - Specific DESG CT 3/21/2024 11 Elect Project - DESG CT 12/1/2021 11 Elect Annual Proj - DESG CT 2/1/2023 11 Asset Mgmt - Specific DESG CT 8/25/2021 11 Damage Claims OH 2/9/2024 11 Elect Project - DESG CT 5/18/2023 11 Elect Annual Proj - DESG CT 5/2/2023 11 Elect Annual Proj - DESG CT 2/9/2024 11 Elect Project - DESG CT 8/30/2021 11 Elect Annual Proj - DESG CT 9/10/2021 11 Damage Claims OH 8/8/2021 11 Corrective Maint OH Lines 8/17/2021 11 Corrective Maint OH Lines 8/2/2021 11 Repair/Obsol OH ST2 CT 7/3/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 7/23/2021 11 Damage Claims OH 7/30/2021 11 Damage Claims OH 3/10/2023 11 Elect Project - DESG CT 7/30/2021 11 Damage Claims OH 1/12/2022 11 Elect Annual Proj - DESG CT 4/7/2022 11 Elect Annual Proj - DESG CT 5/16/2025 11 Dist Capital or Expense 8/12/2021 11 Corrective Maint OH Lines 1/22/2025 11 Asset Mgmt - Specific DESG CT 3/31/2022 11 Elect Annual Proj - DESG CT 3/2/2022 11 Elect Annual Proj - DESG CT 7/24/2023 11 Elect Annual Proj - DESG CT 5/4/2023 11 Elect Project - DESG CT 1/12/2022 11 Elect Annual Proj - DESG CT 6/5/2025 11 Dist Capital or Expense 12/21/2021 11 Elect Annual Proj - DESG CT 8/4/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 7/7/2022 11 Damage Claims OH 3/30/2023 11 Dist Capital or Expense 9/21/2021 11 Damage Claims OH 7/13/2022 11 Elect Annual Proj - DESG CT 7/27/2021 11 Damage Claims OH 8/4/2021 11 Damage Claims OH 9/13/2021 11 Corrective Maint OH Lines 2/24/2022 11 Elect Annual Proj - DESG CT 9/8/2021 11 Corrective Maint OH Lines 8/13/2024 11 Asset Mgmt - Specific DESG CT 8/27/2021 11 Damage Claims OH 8/19/2021 11 Corrective Maint OH Lines 9/22/2021 11 Corrective Maint OH Lines 8/31/2021 11 Damage Claims OH 7/15/2024 11 Elect Annual Proj - DESG CT 8/7/2021 11 Damage Claims OH 9/7/2021 11 Elect Annual Proj - DESG CT 5/7/2024 11 Asset Mgmt - Specific DESG CT 12/5/2023 11 Elect Annual Proj - DESG CT 8/16/2021 11 Corrective Maint UG Lines 7/28/2022 11 Elect Annual Proj - DESG CT 8/19/2022 11 Elect Annual Proj - DESG CT 12/10/2021 11 Asset Mgmt - Specific DESG CT 8/7/2021 11 Elect Annual Proj - DESG CT 10/21/2021 11 Corrective Maint OH Lines 8/30/2021 11 Damage Claims OH 9/9/2021 11 Dist Capital or Expense 9/15/2021 11 Dist Capital or Expense 8/5/2021 11 Damage Claims OH 8/20/2021 11 Damage Claims OH 8/14/2021 11 Damage Claims OH 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 4/21/2023 11 Asset Mgmt - Specific DESG CT 9/18/2025 11 Dist Capital or Expense 12/22/2021 11 Elect Annual Proj - DESG CT 2/14/2022 11 Asset Mgmt - Specific DESG CT 3/10/2025 11 Damage Claims OH 7/19/2023 11 Elect Annual Proj - DESG CT 12/30/2021 11 Elect Annual Proj - DESG CT 5/26/2022 11 Elect Annual Proj - DESG CT 1/4/2022 11 Damage Claims OH Subsequent Close Date 1/22/2026 9/16/2026 5/15/2026 2/13/2026 6/26/2026 6/26/2026 1/22/2026 9/16/2026 364310 Poles and Appurtenance 651 (242) 2,269 7,753 2,224 2,495 662 13 3,399 (115) 184 707 1,127 7,902 7,978 338 1,256 428 8,152 118 2,017 16,051 (3,264) 16,381 3,048 703 3,202 4,639 109 3,276 10,292 641 779 6,852 952 1,533 4,561 957 4,888 949 7,550 1,247 1,335 8,549 6,878 10,372 163 820 1,316 7,588 6,255 90 998 7,050 1,948 306 2,948 39,359 1,406 1,106 4,570 6,910 1,713 2,779 4,692 135,635 6,211 3,086 7,875 82 240 5,167 11,118 38,214 1,251 1,701 2,844 2,204 6,772 4,923 619 2,483 177 14,937 14,991 2,604 2,250 12 11 9 18 19 12 16 9 49 14 131 1,528 463 33,014 21,413 (103) 10,689 3,796 365000 Overhead Conductors, Device 250 (242) 79 4,320 194 1,281 265 35 316 (115) 536 102 1,747 180 1,724 148 2,436 1,132 154 42 14,408 (6,150) 6,645 4,862 1,112 832 1,027 10 1,120 5,187 957 183 1,107 382 224,853 2,621 162 637 10,829 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 6,052 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 344 369720 DB/UG Conductors and Devices 370470 Meter Equipment 672 (115) 935 12,160 15,724 51 88 (1) (16) 89 66,135 7,528 3,986 834 426 176 306 122 198 81 87 212 1,039 6,216 1,095 131 672 3,487 (1,989) 384 395 40 1,141 555 1,428 2,230 4,783 7,166 2,953 155 6,172 17,343 715 180 1,583 185,595 109 6,101 165 2,794 2,451 208,516 761 4,156 7,718 1,994 11,072 350 435 66,354 21,541 178 47 4,307 888 90 54 1,139 270 359 262 22,122 15,923 994 95,733 429 4,891 97,741 24,259 1,287 856 1,302 1,285 282 3,916 195 224 4,719 1,946 1,421 234,065 42 6,941 1,603 1,626 10,267 1,329 308 140 16 2,693 18,220 139 699 352 279 730 639 414 276 344 207 1,121 358 3,135 1,944 14,811 283 81 471 290 85 52,495 188 6,019 8,088 2,988 (2) 1,569 878 555 823 253 46 12,735 777 172 630 1,407 757 94,236 (103) 2,715 2,628 35,459 5,742 (103) 16,036 30,518 2,274 334 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 901 (484) 2,349 12,073 2,418 10,844 927 48 3,715 (344) 720 809 1,127 10,584 8,158 29,946 1,404 2,864 9,284 323 2,060 30,547 (9,431) 23,115 85,558 3,075 4,209 5,666 119 4,702 15,601 1,877 962 8,046 1,546 1,533 229,415 11,228 5,049 1,586 18,379 2,472 2,603 13,178 4,889 10,756 1,591 12,941 6,146 31,021 9,648 734 73,525 47,074 2,664 755 4,890 271,597 1,515 24,416 4,735 6,910 1,713 9,445 13,310 541,541 6,973 7,437 7,875 305 19,770 7,867 12,911 324,859 1,481 14,660 14,979 7,372 18,114 6,299 927 2,623 194 19,038 46,118 2,743 2,949 365 290 739 657 433 288 360 216 1,170 373 3,266 3,472 1,870 33,771 156,850 (309) 60,291 8,698
  7. Page 8 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 8 of 104 Work Order Number Description 80104877 *D&D* JS - Conv. 1156473 - Make Rea 80105201 9A - Car vs. Pole - Waiting on Poli 80105217 MPB; 614 REDDING RD, REDDING - FTR 80105337 CP- 64 Wickett ST NH, replace pole/ 80105454 DG P#155 BARBER ST PUTNAM CLP POLE 80105661 CB; WESTBROOK, MEADOW POINT, 41, DA 80105664 9A CAR VS POLE 245 CANTERBURY RD PL 80105708 8/7 - 9A - Newtown, 153 Sugar St 80105715 8/7 - 9A - Enfield, Enfield St - Fr 80105721 MM 9A FRTR P#609 RIVER RD LISBON 40 80105733 MPB; 279 GREENWOOD AVE BETHEL; REPL 80105861 MCB - 8/6/21 FARMWOOD ( 151) RD -80106155 KD-EVENT #4517222 REPLC P 1282 BRIN 80106222 9A HARTFORD PIKE, KILLINGLY, CT 80106265 SC-449 ROODE RD GRISWOLD INST NEW 2 80106486 APPRENTICES BM; Southbury, Strongto 80106527 PRINT EVW - 24 Emerson Rd, Norfolk 80106671 7/21 NO MUNI10/4 JFC - CORNWALL, B 80106677 *POST CONSTRUCTION* 8/10/21 TURNOVE 80106692 PL: INST 45' CROSS OVER POLE (SLACK 80106704 (9A) TARIFFVILLE ( 102) RD -- 1313 80106720 PRINT EVW - 510 Wells Hill Rd, Sal 80106740 8/10/21 9A STANLEY ( 1164) ST -- 56 80106827 MV; Windham_S Windham Rd_P 1909_Mul 80106837 8/10/21 9A 1427 CHAMBERLAIN HWY BER 80107180 CR-102 SIMSBURY RD. AVON, P# 842, S 80107230 DG P#155 SOMERS TPKE WOODSTOCK CLP 80107262 ZN Conv#1131766-MakeReadyNonReimb-M 80107268 *D&D*Conv. 1626535 - Make Ready Non 80107548 10/18/24- 9 OAK ST STONINGTON- POLE 80107642 TL - E HADDAM RD, P#1070-S SALEM // 80107789 MCB - 9A : 08.12.21 - 10 GREENWOOD 80108097 GC - GALES FERRY, WHALEHEAD, 149 80108161 ALL WORK COMPLETE 8/13 BOKUM (30) R 80108185 9A - 200 HARTFORD AVE, NEWINGTON / 80108220 (9A) 08.14.21 - 184 DIANA RD, SOUTH 80108247 LD 285 MAIN AVE, NORWALK 9A REPLACE 80108268 MAR - Upgrade Xfmr/Fntr to rplc pol 80108272 WEST HARTFORD, 702 OAKWOOD XFMR STA 80108368 ALL WORK COMPLETE 8/16 9A POKORNY ( 80108456 TL - 8/12 BEAVER BROOK RD LYME // * 80108503 TPA NetSpeed LLC CONVO # 1154722 PA 80108645 9A KD-EVENT #4590206/4594177 CAR V 80108785 9A - CR-517 W AVON RD, TELCO REPLAC 80108887 Jpt-10 School St Plymouth - Post Co 80108907 JS - Conv. 1153191 - Make Ready Non 80108950 JFC - CHARLES ( 15) ST -- 1139, T 80108979 MF -LEDYARD, NEW LONDON (P3378) XAR 80109024 LD LISA CT NORWALK POLE#15418 PCB T 80109173 E.P. -8/17- 67 BOULDER AVE, P.4582, 80109185 9A KD-EVENT #4591401 CAR V P 481 HE 80109517 MV-151 BOOM BRIDGE N. STONINGTON/IN 80109533 WC-710-714 E MAIN ST WATERBURY. NE 80109654 PMV - Pole C2314 NORTH ST MIDDLEBU 80109671 9A - CAR VS POLE 80110062 CON 40 L139-002 Mountain Rd Suffiel 80110185 ---RF-BOLTON,1100 BOSTON, New OH/UG 80110359 8/19 - Sherman, Big Trail - Eversou 80110360 MDB - S KENT ( 321) RD -- A 4647, 80110361 BM; 8/19/21 CHESTNUT TREE HILL RD S 80110439 GC - 8/21-2021 NATURAL TREE VS P44 80110510 152 CHASE AVE, WATERBURY NEW EV CHA 80111361 MV - NEW LONDON TPK / WHEELER RD, I 80111389 JES; 200 DANBURY RD. WILTON,NEW FE 80111694 DONE PR 3/1 CRP - ELEC. MAINT. POLE 80111848 Jpt-1155 Burlington Ave Bristol - R 80112181 JTR, COUNTRY CLUB RD, AVON CT - POL 80112207 MRP - (9A) - POLE 9 - BECKLEY MILL 80112211 JDB 207 W. NORWALK RD NORWALK, SHIF 80112248 MRP - (9A) LAKEWOOD RD - POLE 6508, 80112321 TL - S RIDGE RD, NIANTIC // 8/25/21 80112424 DG P#982 W THOMPSON RD THOMPSON CLP 80112473 9A CAR VS POLE 105 - 3659 PUTNAM P 80112500 JDB 770 CONN. AVE NWLK P23266 EXT 3 80112515 9A CAR VS POLE - APPROVED 12/9/25 80112645 9A - 102 WESTON ST HARTFORD 80112713 JTR, 9A 10/18 - MAIN ST, ROCKY HIL 80112951 9A CAR VS EVERSOURCE POLE 2709 - AP 80112975 DG P#331 FRENCH RD EASTFORD CLP POL 80113005 JDB 1 OLD TROLLEY WAY NWLK P29811 R 80113030 MV; ALL WORK COMPLETE 1535 W MAIN S 80113133 Abel- Suffield, Valley View Dr - tr 80113184 CR-LOVELY ST. AVON, CAR V POLE 369, 80113209 MRP - (9A)POST CONSTRUCTION - P928 80113246 8/27/21 (RSO-STROM/MARA) LAUREL LEA 80113274 PENDING CUST WORK; MR; **PAYMENT MA 80113319 9A KD-EVENT #4608197 CAR V P 354 BO 80113352 EB; MAPLE ( 41) AVE -- 5353REF128 80113485 APPRENTICES 15 DD BY 6/1/22 BM; NEW 80113495 DG P#1062 151 CENTRE PIKE EASTFORD 80113573 JTR*, MAIN ST WETHERSFIELD - 9A - F 80113762 DONE WTG FOR PD RPT 10/21/24 (TH) 1 80113817 GC - PRESTON, DOOLITTLE, 43 80113861 *HAWK* Conv#1133104-MakeReadyNonRei 80113879 DB-CD01534-06, State Pier, recloser 80113926 PRINT CRP-20 Ridge rd CTN, relocate 80113945 BAL-CD01650, JLO, Tripsaver 30Y10-1 80114009 JRP - Murdock Ave MERIDEN Repl 1PH 80114237 PL: CD01761 - 4.8kV TO 7.9kV CONV./ 80114278 HEL 15 DD BY 10/11/22 BM; NEWTOWN, 80114424 RL: 88 SOUTH WATER ST: 3 PHASE 1200 80114486 MRP - (9A) - POLE F8088 - CHESTNUT 80114606 MF - 9/2/21 (RSO - PUNZALAN) VALLEY 80114769 *D&D*Conv. 1633919 - Make Ready Rei 80114950 MI CAR VS EVERSOURCE P-642 in-service date work order type 2/25/2025 11 Dist Capital or Expense 8/18/2021 11 Damage Claims OH 12/9/2021 11 Asset Mgmt - Specific DESG CT 8/19/2021 11 Corrective Maint OH Lines 8/19/2021 11 Corrective Maint OH Lines 3/16/2022 11 Elect Annual Proj - DESG CT 8/11/2021 11 Damage Claims OH 8/11/2021 11 Damage Claims OH 8/19/2021 11 Damage Claims OH 8/18/2021 11 Damage Claims OH 2/16/2023 11 Dist Capital or Expense 8/24/2021 11 Corrective Maint OH Lines 9/10/2021 11 Corrective Maint OH Lines 8/25/2021 11 Damage Claims OH 10/15/2021 11 Elect Annual Proj - DESG CT 9/23/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Corrective Maint OH Svc 11/1/2023 11 Asset Mgmt - Specific DESG CT 10/1/2021 11 Elect Annual Proj - DESG CT 7/8/2022 11 Elect Annual Proj - DESG CT 11/2/2021 11 Damage Claims OH 2/5/2025 11 Corrective Maint UG Svc 8/18/2021 11 Damage Claims OH 5/10/2023 11 Elect Annual Proj - DESG CT 8/30/2021 11 Damage Claims OH 1/5/2022 11 Elect Annual Proj - DESG CT 12/29/2021 11 Dist Capital or Expense 4/27/2022 11 Elect Project - DESG CT 4/21/2025 11 Dist Capital or Expense 1/3/2025 11 Elect Annual Proj - DESG CT 2/16/2022 11 Elect Annual Proj - DESG CT 8/17/2021 11 Damage Claims OH 9/3/2025 11 Corrective Maint OH Svc 8/31/2021 11 Corrective Maint OH Lines 9/8/2021 11 Damage Claims OH 8/30/2021 11 Damage Claims OH 8/24/2021 11 Damage Claims OH 2/10/2022 11 Elect Annual Proj - DESG CT 7/24/2025 11 Corrective Maint UG Svc 11/9/2021 11 Damage Claims OH 9/10/2021 11 Corrective Maint OH Lines 2/7/2022 11 Elect Project - DESG CT 9/10/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 8/31/2021 11 Corrective Maint OH Lines 2/9/2022 11 Elect Project - DESG CT 9/10/2021 11 Damage Claims OH 8/17/2021 11 Elect Annual Proj - DESG CT 2/11/2022 11 Asset Mgmt - Specific DESG CT 12/5/2021 11 Elect Annual Proj - DESG CT 9/10/2021 11 Damage Claims OH 8/5/2022 11 Elect Annual Proj - DESG CT 10/4/2021 11 Elect Annual Proj - DESG CT 12/22/2021 11 Elect Annual Proj - DESG CT 9/4/2021 11 Damage Claims OH 2/3/2023 11 Elect Annual Proj - DESG CT 9/23/2022 11 Dist Capital or Expense 10/4/2021 11 Corrective Maint OH Lines 8/24/2021 11 Elect Annual Proj - DESG CT 9/23/2021 11 Corrective Maint OH Lines 4/4/2022 11 Elect Annual Proj - DESG CT 1/19/2023 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 1/25/2022 11 Elect Annual Proj - DESG CT 5/30/2023 11 Elect Annual Proj - DESG CT 9/20/2022 11 Elect Annual Proj - DESG CT 9/1/2021 11 Corrective Maint OH Lines 9/14/2021 11 Damage Claims OH 3/15/2022 11 Elect Annual Proj - DESG CT 10/6/2022 11 Damage Claims OH 11/28/2021 11 Elect Annual Proj - DESG CT 10/23/2024 11 Damage Claims OH 10/25/2024 11 Damage Claims OH 11/14/2022 11 Asset Mgmt - Specific DESG CT 9/30/2025 11 Damage Claims OH 11/2/2021 11 Elect Annual Proj - DESG CT 10/29/2024 11 Damage Claims OH 12/16/2024 11 Damage Claims OH 8/31/2021 11 Corrective Maint OH Lines 3/29/2022 11 Corrective Maint UG Svc 9/22/2021 11 Dist Capital or Expense 11/24/2021 11 Corrective Maint OH Lines 9/21/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 11/14/2021 11 Elect Annual Proj - DESG CT 5/5/2023 11 Elect Annual Proj - DESG CT 9/30/2021 11 Damage Claims OH 9/9/2021 11 Corrective Maint OH Lines 6/14/2022 11 Elect Annual Proj - DESG CT 9/15/2021 11 Corrective Maint OH Lines 10/24/2024 11 Dist Capital or Expense 10/24/2024 11 Dist Capital or Expense 2/7/2023 11 Elect Annual Proj - DESG CT 7/28/2023 11 Elect Project - DESG CT 2/24/2023 11 Asset Mgmt - Specific DESG CT 11/25/2025 11 Corrective Maint OH Svc 2/24/2023 11 Asset Mgmt - Specific DESG CT 5/21/2024 11 Asset Mgmt - Specific DESG CT 5/21/2024 11 Dist Capital or Expense 7/20/2023 11 Elect Annual Proj - DESG CT 8/3/2022 11 Elect Annual Proj - DESG CT 9/8/2021 11 Damage Claims OH 12/9/2021 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 9/8/2021 11 Damage Claims OH Subsequent Close Date 1/22/2026 9/16/2026 9/16/2026 5/15/2026 7/17/2026 4/20/2026 4/20/2026 1/22/2026 364310 Poles and Appurtenance (161) 2,900 149 6,636 1,992 22,851 3,008 3,081 13,295 1,587 2,457 6,093 919 1,101 3,142 2,782 169 3,192 (244) 6,256 4,091 25 2,116 10 10,263 6,077 50,211 3,720 7,185 2,431 3,209 2,018 68 531 2,042 2,838 3,063 2,590 4,248 242 1,081 5,613 2,864 1,245 14,212 4,151 1,505 1,604 5,070 647 1,106 7,570 10,472 1,898 4,669 12,759 11,155 2,436 3,386 7,538 2,333 4,326 9,777 3,259 5,846 551 4,662 6,122 994 3,545 566 14,777 594 3,078 5,182 390 12,586 13,158 1,808 342 1,123 (131) 190 4,761 1,177 6,081 1,398 1,449 2,215 551 392 4,274 8,783 2,740 5,883 2,677 69,255 140,359 (972) 12,486 655 5,227 6,113 (328) 1,575 365000 Overhead Conductors, Device (219) 60 1,185 2,110 481 1,573 65 1,072 1,958 840 1,504 1,658 1,655 1,189 2,216 1,803 264 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead (16) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 346 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 1,046 0 1,129 712 247 70,920 6,817 193 327 235 1,269 7,824 0 340 865 4,976 8,570 446 4,564 612 1,317 2,267 6,720 5,995 1,594 326 549 35 209 300 1,132 168 608 161 277 57 95,643 1,666 3,116 623 83 272 60 373 271 115 956 6,443 9,225 247 1,165 1,654 580 1,196 1,042 283 456 90 3,047 983 4,462 1,980 4,023 7,962 51 8,418 955 33 832 2,521 207 51 27,962 1,501 599 3,276 1,364 3,813 1,965 1,775 5,189 1,393 2,251 939 813 121 8,158 11,968 3,185 475 172 4,304 1,113 971 1,031 1,515 (131) 22 111 5,783 4,541 5,952 273 214 418 73 104 345 2 6 349 1,319 3,541 103 426 221 195 2,028 379 253 2,109 1,512 175 1,684 213 296 1,051 3,726 175 91,489 382 118,525 158,714 (809) 11,056 2,113 1,649 2,624 (811) 2,791 60 4,182 18,737 505 720 4 32 587 479 687 (34) 1,080 7,074 (80) 529 368 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total (396) 2,959 2,726 8,746 2,472 25,552 3,073 4,865 15,499 2,426 81,891 8,078 2,574 2,525 14,452 4,585 774 4,057 (244) 16,345 12,661 714 2,116 947 11,580 9,776 56,931 9,884 8,779 2,431 3,209 2,018 948 752 2,319 2,895 98,706 4,629 9,411 865 1,163 5,613 2,979 2,201 21,698 13,659 1,752 2,769 7,180 647 1,195 19,068 15,762 6,360 6,855 16,833 48,579 2,486 3,986 10,814 2,333 6,075 13,591 11,639 7,622 5,740 6,128 8,478 3,597 4,360 692 37,318 12,561 6,792 5,657 784 16,889 14,271 2,974 3,779 2,891 (261) 212 4,761 3,286 9,276 1,573 1,449 5,218 907 392 5,325 36,653 2,919 97,404 3,645 188,259 299,760 (1,815) 24,622 9,761 7,404 9,104 (1,138) 1,575
  8. Page 9 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 9 of 104 Work Order Number Description 80114971 COMP REWRITE REQUIRED Cheshire 80114997 COMP REWRITES REQUIRED Cheshire 80115012 EAST HAMPTON, CONE, 0, Stan Oleksen 80115060 Cheshire CD01546 - Eliminate 20H AI 80115075 9A OK to close (STILWKD) 10/18 MOUN 80115078 MV - MYSTIC, COOGAN, 12, INST PRI R 80115094 WRTN - DM - Moodus Leesville Rd Eas 80115128 COMP REWITE REQUIRED Cheshire CD 80115484 1/12 CAR VS POLE-DISTRICT UNABLE TO 80115567 ALL WORK COMPLETE 9A (RSO - MCDERMO 80115608 MAR -9A POST CONST> 127 JACOBS ST, 80115653 9A-FTR 45'/1 jct pole 10/20-RSO-WES 80115959 PD-FEDERAL STREET N. LONDON/INST XF 80116021 *JRP - 85 Robert Porter Rd SOG Inst 80116181 9A CAR VS POLE - APPROVED 8/14 80116329 ASPLUNDH PRINTED 7/25JFC - HOERLE ( 80116414 9A DIG UP 80116434 TL - SCOTT RD, #93 EAST LYME // RE80116453 VJT - 23 BUCKINGHAM ST WATERTOWN CT 80116646 MAR - Rplc/Uprgd Svc/replc Xfmr and 80116936 NJB 237/239 LEDYARD ST HTFD RMV EXI 80116985 W HTFD 160 STEELE RD - SHIFT TELCO 80117106 JV; pic HEBRON, MAIN, 14, Jason Tin 80117155 MAR - Svc Upgrade/ Rplc Frntr Pole, 80117178 Abel - Frontier -9/10 (BURDIJA) 9A 80117222 AVON, CHEVAS, 16, Lot 2 -FRNTR POLE 80117399 TL - CHAMPION RD, #27 OLD LYME // R 80117483 12/27 JFC - MAIN ( 576) ST -- PAD 80117494 - CORNWALL BRIDGE, MANSONVILLE, 14, 80117738 * Research Pkwy, Meriden - Repl Po 80117771 RSO--09/14/21--TRUCK V FTR POLE--PO 80117795 EVW - 222 Bidwell Hill Rd, Watertow 80117807 ASP 3/20/23 CD01753-023-P3 Bolton 80117887 MTL-Jpt-410 Clark Ave Bristol P1205 80117929 (LC)RM, 644 MAIN ST -NORWALK, !!3 P 80118149 HOLD FOR FTR POLES pr 11/8 EVW 109 80118163 ftr poles EVW - P739-742 North St, 80118388 GC - 09/14/21 Stevens Ave Ledyard P 80118553 8/30/22 NEED FTR POLE CRP 9 SEAGU 80118853 749 E Main St Branford/Upgrade svc 80118864 EB; Install GOLB switch p-716 East 80118929 PD-125 PEQUOT AVE N.LONDON/9A MVA C 80118969 SD POST CONSTRUCTION 295 S CURTIS S 80119265 JMS-BLOOMFIELD 7 DUNCASTER -- SET P 80119350 15 DAY DUE 1/5/22; JV; pic COLCHEST 80119470 Abandon pole line in woods and exte 80119562 CAR VS POLE - PASSED STATUTE OF LIM 80119804 MRP - (9A) - POLE 5346 - MOUNT VERN 80119808 9/17 - 9A - Stafford, Gulf Rd - Eve 80120166 COMPLETED 5 TAYLOR RD, BETHEL - RPL 80120249 DL; 287 WASHINGTON BLVD; BLDG 2; NE 80120290 GC - 9/20/21 (RSO - LEAC) HOMESTEAD 80120382 @MAR - 35 Bridge St, Naugatuck CT ( 80120704 DONE Print 7/27 JFC -GAGARIN PLACE 80120715 ACC 15dd by 3/25 KTI WM; NEW PRESTO 80120722 CAR VS POLE 2679 - PR REORDERED 6/9 80120748 PCC-Newberry Rd 124, East Windsor. 80120765 9A 09/22 LOVELY ( 390) ST -- S400, 80120960 post const> - MAR - 9A - 12 HEMLOCK 80120973 * PL: INST SVC TO NEW POPEYE'S, PAD 80121063 *JRP - 254 Queen St SOG Repl 150KVA 80121121 COMP Cheshire CD01546- Eliminate 2 80121267 EB; EAST HAMPTON, OAKUM DOCK, 49, 80121346 *9A-10/21-RSO-[DAMICNA]-561:FEDERAL 80121386 JAM - 12 White Oak Farmington - New 80121592 COMP Cheshire CD01546- Eliminate 80121680 RR; 9.23.21 - BOGUS HILL RD, NEW FA 80121828 ns New 150 KVA XFMR for 600A 3 Ph S 80121892 MCB - (9A) 09.23.21 - 300 WOLCOTT S 80121970 12/27 EVW - 502 E Wakefield Blvd, W 80122039 CD01103 - Install VS on new pole 96 80122043 9A KD-CAR V P 18362 FLANDERS (210) 80122185 9/25 - 9A - East Granby, Turkey Hil 80122189 ASPL -*MAR - 200amp Upgrd with mete 80122197 SD POST CONSTRUCTION (9A) 12 CURTIS 80122209 SD POST CONSTRUCTION DOWNS RD, BETH 80122270 JLB 43 RIVER RD, WESTON/ TREE VS PO 80122524 CAR VS POLE P1861 - UNBILLABLE PAST 80122571 JRP - 109 Waterbury Rd PROSPECT Rep 80122613 CD01536-02 Regulator Installation a 80122701 AMM VIPER SWITCH - BURLINGTON RD, F 80122802 *D&D*ZN Conv#1126340-MakeReadyNonRe 80122886 ---* AMM 12 FENN RD, NEWINGTON. IN 80123013 COMP Cheshire CD01546- Eliminate 80123334 9A CAR V POLE 80123509 MJ-15DD 9/21 TD/WC-493 W MAIN ST, C 80123815 DG P#1234 34 WETHERBEE RD POMFRET F 80123901 GC - 9/3 SHETUCKET TPKE PRESTON 80124097 DG P#1013 PAINE RD WOODSTOCK FRNTR 80124107 9/30 9A P#700 CREAMERY HILL ( 15) 80124272 WESTBROOK, BOSTON POST, 976/SHIFT P 80124525 JFC - NORTHFIELD ( 637) RD -- 4673 80124544 RSO--10/03/21--CAR V FTR POLE, SET 80124630 DJM. SILVERBROOK RD WESTPORT/P#7333 80124661 POST CONSTRUCTION 9A - RESERVOIR RD 80124704 1/17 CP-151 Harmony Hill Rd, HW, OH 80124731 * MRP - Leaning Pole - Pole 3338 80124848 1/10 JFC - GOSHEN, BEACH, 416, 80124875 90 SCOTT RD, WATERBURY - INST ADDIT 80125096 MCB - (9A) 10.03.21 - 10 BUCKINGHAM 80125155 CD01774 - Viper Ins 37f2-30J Monroe 80125239 PD-806 HARTFORD TPKE WATERFORD/NEW 80125272 PD-82 BOSTON POST RD WTFD,UPG OH SV 80125616 ASP 1/26 JMS- W HTFD, 114 SHIELD ST 80125630 TO STORES 3/6/23--ALL WORK COMPLETE in-service date work order type 1/15/2025 11 Asset Mgmt - Specific DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/30/2022 11 Elect Annual Proj - DESG CT 8/12/2024 11 Asset Mgmt - Specific DESG CT 11/7/2024 11 Dist Capital or Expense 5/20/2022 11 Elect Annual Proj - DESG CT 11/19/2024 11 Dist Capital or Expense 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/20/2024 11 Damage Claims OH 9/8/2021 11 Damage Claims OH 9/9/2021 11 Damage Claims OH 4/16/2025 11 Dist Capital or Expense 4/8/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Elect Annual Proj - DESG CT 10/4/2021 11 Damage Claims OH 8/5/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Dist Capital or Expense 11/22/2022 11 Elect Annual Proj - DESG CT 10/12/2021 11 Damage Claims OH 9/29/2021 11 Elect Annual Proj - DESG CT 1/4/2022 11 Elect Annual Proj - DESG CT 1/24/2022 11 Elect Annual Proj - DESG CT 1/27/2022 11 Elect Annual Proj - DESG CT 10/20/2021 11 Elect Annual Proj - DESG CT 2/13/2023 11 Damage Claims OH 11/10/2025 11 Dist Capital or Expense 8/30/2023 11 Elect Annual Proj - DESG CT 6/22/2022 11 Damage Claims OH 3/30/2022 11 Elect Annual Proj - DESG CT 11/19/2024 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims OH 12/8/2021 11 Elect Annual Proj - DESG CT 6/19/2024 11 Asset Mgmt - Specific DESG CT 10/5/2021 11 Damage Claims OH 12/4/2025 11 Dist Capital or Expense 9/22/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 10/7/2021 11 Damage Claims OH 10/29/2024 11 Dist Capital or Expense 6/17/2022 11 Elect Annual Proj - DESG CT 11/9/2021 11 Elect Annual Proj - DESG CT 10/18/2021 11 Damage Claims OH 10/18/2021 11 Elect Annual Proj - DESG CT 11/9/2021 11 Elect Annual Proj - DESG CT 1/10/2022 11 Elect Annual Proj - DESG CT 5/12/2022 11 Elect Annual Proj - DESG CT 10/24/2023 11 Damage Claims OH 9/21/2021 11 Damage Claims OH 9/22/2021 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 1/21/2022 11 Dist Capital or Expense 5/13/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Elect Annual Proj - DESG CT 11/15/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Dist Capital or Expense 10/19/2021 11 Damage Claims OH 3/27/2023 11 Elect Annual Proj - DESG CT 9/24/2021 11 Damage Claims OH 11/20/2024 11 Dist Capital or Expense 1/21/2022 11 Elect Annual Proj - DESG CT 10/14/2021 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 12/17/2021 11 Elect Annual Proj - DESG CT 11/10/2024 11 Damage Claims OH 12/21/2021 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/5/2021 11 Elect Annual Proj - DESG CT 11/17/2021 11 Elect Annual Proj - DESG CT 10/5/2021 11 Damage Claims OH 8/29/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Asset Mgmt - Specific DESG CT 11/8/2021 11 Damage Claims OH 1/28/2022 11 Damage Claims OH 11/8/2021 11 Corrective Maint OH Svc 10/5/2021 11 Damage Claims OH 10/5/2021 11 Elect Annual Proj - DESG CT 12/12/2021 11 Elect Annual Proj - DESG CT 3/31/2023 11 Damage Claims OH 12/3/2021 11 Elect Annual Proj - DESG CT 5/23/2024 11 Asset Mgmt - Specific DESG CT 8/16/2022 11 Asset Mgmt - Specific DESG CT 2/28/2024 11 Elect Project - DESG CT 9/8/2022 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 10/24/2021 11 Damage Claims OH 9/19/2023 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/21/2021 11 Elect Annual Proj - DESG CT 11/5/2021 11 Elect Annual Proj - DESG CT 10/28/2021 11 Damage Claims OH 11/18/2022 11 Corrective Maint OH Svc 12/9/2021 11 Damage Claims OH 10/26/2021 11 Damage Claims OH 11/4/2022 11 Elect Annual Proj - DESG CT 11/3/2021 11 Damage Claims OH 1/19/2022 11 Corrective Maint UG Svc 12/2/2024 11 Elect Annual Proj - DESG CT 1/20/2022 11 Corrective Maint UG Svc 1/25/2023 11 Elect Annual Proj - DESG CT 10/18/2021 11 Damage Claims OH 12/14/2023 11 Asset Mgmt - Specific DESG CT 5/20/2022 11 Elect Annual Proj - DESG CT 9/16/2025 11 Corrective Maint UG Svc 2/5/2024 11 Elect Annual Proj - DESG CT 10/20/2021 11 Elect Annual Proj - DESG CT Subsequent Close Date 4/20/2026 9/16/2026 1/22/2026 8/26/2026 8/26/2026 8/26/2026 9/16/2026 9/16/2026 364310 Poles and Appurtenance 29,504 326,944 941 33,599 102 1,628 180 25,920 2,967 371 37 7,490 7,771 1,947 3,326 11,609 7,697 87,945 3,970 1,386 624 251 1,234 927 3,870 791 1,111 36 2,314 8,820 140 1,644 121,847 2,117 13,753 2,973 6,850 3,163 399 5 470 8,574 1,333 3,962 283 1,455 1,270 2,818 3,281 1,917 2,776 9,144 13,084 4,366 8,093 1,208 1,707 1,194 357 616 948 6,028 1,336 30,151 1,974 9,143 2,378 381 1,108 4,059 1,825 2,327 6,157 4,979 2,245 371 (197) 982 2,852 37,701 1,788 19,329 1,961 6,477 10,311 976 2,120 598 310 9,626 3,190 6,506 4,969 1,789 9,234 (115) 2,884 3,109 1,391 871 1,352 263 111 12,123 1,234 365000 Overhead Conductors, Device 87,002 (54,032) 831 22,886 3,570 2,071 9,828 26,301 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 131 (287) 4,433 9,236 93 481 20,771 1,567 292 3,409 741 3,706 365 835 633 150 8 71 278 154 368350 Installations Overhead 378 795 3,166 6,561 97 207 5,869 3,615 2,291 701 368330 Equipment Overhead 156 (13) 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 1,849 672 2,012 415 881 171 265 9,391 29,690 617 1,667 162 95 10,506 3,306 1 600 4,694 96 156 99 76 81 43 65 741 53 627 12,502 287 10,718 1,999 2,091 165 15,815 566 509 1,275 808 2,484 16,978 3,571 2,222 196 1,290 9,932 2,295 345 1,537 890 2,798 14,507 510 112 1,145 1,551 3,867 87 124 374 5,461 510 67 59 414 1,109 2,180 10,209 3,810 372 9,264 1,889 305 66 3,261 903 3,878 3,585 13,397 579 1,548 14,640 4,001 923 210 7,050 9,959 1,312 23,312 49 1,558 128 54,534 30 3,611 1,731 3,272 2,138 (197) 1,107 1,137 32,781 95,086 10,688 3,511 5,239 1,003 4,381 1,786 982 1,241 4,019 1,767 829 5,247 9,887 30,338 (48) 195 103 616 331 7,543 441 569 7,363 629 889 770 253 1,363 44 13 1,645 7,053 11,587 23 93 (346) 808 (193) 469 973 95 2,029 12,999 1,295 602 106 418 291 554 453 1,508 648 55,786 2,891 79 6,651 824 287 (11) 514 3,939 1,426 360 154 444 4,246 78 11,326 4,596 3,142 35 1,142 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 116,793 272,613 15,440 57,658 3,672 9,480 10,008 59,662 2,967 468 415 13,359 11,651 16,056 4,027 11,609 8,178 140,690 5,536 1,935 15,139 993 13,097 1,457 4,780 2,245 1,454 43 3,012 9,099 294 1,644 134,349 2,404 40,852 6,756 8,941 3,328 1,207 16,996 17,448 12,655 3,666 5,303 6,991 11,984 3,689 3,163 4,885 3,654 12,143 11,324 33,759 51,911 10,013 26,035 7,807 1,499 423 11,165 1,841 10,717 15,315 30,151 11,269 33,024 2,427 9,931 1,236 4,059 56,359 2,357 9,768 8,369 5,517 2,761 (394) 2,133 4,024 73,491 96,874 37,163 17,519 11,810 11,314 18,632 8,804 1,580 1,658 13,645 4,956 7,335 10,634 1,789 9,525 953 2,884 3,922 8,419 1,963 57,138 11,996 268 34,384 2,093
  9. Page 10 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 10 of 104 Work Order Number Description 80125660 COMP REWRITE REQUIRED Cheshire 80125697 MATERIAL JLB 152 LAMBERT RD, NEW CA 80125701 155 OSWEGATCHIE RD WATERFORD- POLE 80125706 BM; Newtown to Waterbury Demarcatio 80125735 MF - 7/16 QUAKER LN WATERFORD 80125739 WAITING 1500KVA PAD 7/19/23 JMS- BL 80125767 AMM YORKSHIRE CT, FARMINGTON. INSTA 80125796 JES. WILTON, WESTPORT, 183, 80125833 MG-P#2220-EAST KILLINGLY (1133) HAR 80125838 MV - STONINGTON, SUNRISE, 10, I/R P 80125910 POST-AP- 384 Oregon Rd, Meriden-Yel 80126134 9A KD-TURNOVER EVENT #4633305 CAR V 80126196 JFM-INT-99455- XFMR UPGD- 34 HIGGIN 80126515 BRANFORD, CHERRY HILL, 175/REMOVE P 80126614 9A.QUADDICK (273) RD -- 607, THOMPS 80126784 ***COMP*** AMM 280 HARTFORD AVE, N 80126858 MANCHESTER, 290 HARTFORD RD - H4712 80126864 12/27JFC - TORRINGTON ( 192) RD -80126869 Abel-TUNNEL RD. X ECHO DR., VERNON 80126917 JFC - 325 NORTH ST GOSHEN CT 06756 80127153 Jpt-W Center St SOG P9005 - 9a Post 80127261 DF-SHFT Ple, R/I Prmyry Rsr & Padmo 80127317 MV - PAWCATUCK, ROBINSON, 10, I/R P 80127397 1/3 JFC - TORRINGTON, SOUTH, 100, 80127502 (TH) CRP - 10/13/21 CAR VS POLE 77 80127664 COMP REWRITES complete 2/6/25 CHE 80127677 COMP REWRITE REQUIRED Cheshire 80127864 APPT 5/18 MDB - BETHLEHEM, MAIN, 34 80127889 MATERIAL JLB 13 OLD MILL RD, WESTON 80127984 MATERIAL EVW - 46 Litchfield Rd, Wa 80128141 PD-365 MONTAUK AVE N. LONDON/INST N 80128216 9A KD-TURNOVER EVENT #4635865 CAR V 80128220 9A EAST ( 1290) ST N -- 3174, S 80128239 JLB 22 HUNTERS CREEK LN NC NEW 400A 80128262 need to sign off on 6/21 JSG - WINC 80128348 JRP - 126 Waterbury Rd PROSPECT Ins 80128586 15 DAY DUE 4/21/22; EB; EAST HAMPTO 80128789 *JRP - Savage St SOG Repl/Relocate 80128942 MV-LOOP LAKE RIDGE CABLE -UG-SPECIF 80129105 SC-80 QUINEBAUG CAMP RD GRISWOLD IN 80129444 9A KD-EVENT #4637370/4637567 CAR V 80130066 PR 10/4 110 Albany TPKE, Canton CT. 80130101 10/19 - 9A - Somers, Four Bridges R 80130183 MATERIAL ACC KTI 10/20/21 PUNKUP ( 80130200 PMV - POST CONSTR. 27 COLONY HTS, 80130237 KD-EVENT #4637875 REPLC P 3115 PARK 80130578 10/20/21 LONG RIDGE RD DANBURY 80131034 COOK HILL RD, KILLINGLY CT - NEW PO 80131220 MRP - (9A) Car v Pole - Pole 29005 80131429 !!! DL; 26 ELM CT; STMFRD TRANSIT, 80131512 WESTBROOK, SEAWATCH, 25/Shift two p 80131533 POST CONST (9A) 10.24.21 - 81 CHURC 80131537 10/23 - 9A - Ellington, Sandy Beach 80131577 MDB - W MORRIS ( 424) RD -- 909, M 80131599 DB-CD01755-03, 11B61 OH work 80131673 JAM - 54 Northwood Road Farmington 80131691 COMP REWRITE REQUIRED Cheshire 80131786 DJM. 4 QUINTARD PL WESTPORT. OH TO 80131834 Car vs Frontier Pole 80132007 MDB 28P6 - Stowe Rd. Winsted - (3 o 80132030 1/10/23 ASPLUNDH JSG - CD01774:12 80132072 Abel 344 LAKE RD., ANDOVER - NEW CR 80132096 4.1 245 hpolFCOMPcg10/25/21 (RSO-HA 80132121 COMP CHESHIRE CD01546- Convert 20H 80132205 JK>CD01097--POLE 76--REPL POLE WITH 80132308 (9A) 10.25.21 - 428 WOODTICK RD, WA 80132333 (9A) COLT HWY, FARMINGTON. 80132354 COMP *MG* Cheshire CD01546 - Eli 80132390 CD01697-03 - Reconductor River St w 80132615 CD01774-03 - Viper Switch Install 1 80132651 CAR VS POLE 3988 - NEED PRE244 COMP 80132661 10/30 - 9A - Willington, River Rd 80132754 9A- S MAIN ( 349) ST -- 3011, WES 80132775 GC - 10/31 HURLBUTT ( 34) RD -- 2 80132857 TT RF:101 LONG NECK POINT RD, DARIE 80133050 15 DAY DUE 1/26/22; JV; pic WILLIMA 80133068 9A KD-EVENT #4650233 CAR V P 173 PL 80133635 TL - BISCAYNE BLVD, P#3937 // REPL 80133732 SC-80 SHELDON RD GRISWOLD 80133802 Nutmeg Rd North 595B, SW. Primary w 80133838 TC 54 CHESTNUT HILL RD, STM: P#5054 80133924 TO STORES 2/28/23-ections to Energi 80134007 MM Elliott Rd Brklyn P#770 ES to re 80134222 MJ -PMV - CD01774-03 15Q6--32J Vipe 80134293 9A - Car vs. Pole - Waiting on Poli 80134652 CD001774-03 - Viper Switch Install 80134736 print 8/10 CP-3/5 Cherry Brook rd C 80134766 (ASP) JMS- WEST HARTFORD, 179 SOUTH 80134784 JTR, 255 Pitkin St, East Hart, DB C 80134812 JFC - KNIFE SHOP ( 49) RD -- S222 80135171 (9A) 11.06.21 - 581 WOLCOTT ST, WAT 80135176 ALL WORK COMPLETED-11/5 - 9A - East 80135243 9A CAR VS POLE Waiting for COMP sta 80135247 APPT 10/11 CP-120 Turnbull rd, OH-U 80135319 9A MOUNTAIN RD FARMINGTON 80135955 MM 92 Herrick rd Brklyn P#1558 repl 80136073 PN CD01677-08 WO 1 of 3 Archer St W 80136178 DJM. 5 FRASER RD WESTPORT. NEW 400A 80136184 Extend Primary to Pad, Ins Db Svc t 80136202 9A KD-EVENT #4652815/4652805/465280 80136368 PL:INST VIPER SWITCH & GOAB REPL AN 80136460 COMP - AS BUILT REQ (20): MK-Baldw 80136783 MV - 11/10 STONINGTON ( 892) RD -80137177 11/13 - 9A - E Windsor, Prospect Hi 80137264 MR; ***WRITTEN***SHIFT TO NEW 45/2- in-service date work order type 1/15/2025 11 Asset Mgmt - Specific DESG CT 1/4/2022 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 12/19/2024 11 Elect Annual Proj - DESG CT 11/27/2021 11 Elect Annual Proj - DESG CT 2/6/2024 11 Elect Annual Proj - DESG CT 11/5/2024 11 Elect Annual Proj - DESG CT 12/14/2022 11 Elect Annual Proj - DESG CT 7/21/2025 11 Dist Capital or Expense 6/11/2022 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims OH 11/13/2024 11 Elect Annual Proj - DESG CT 12/27/2021 11 SV Exist OH/UG NOND ST2 CT 11/3/2021 11 Damage Claims OH 12/2/2021 11 Elect Annual Proj - DESG CT 11/3/2022 11 Damage Claims OH 4/22/2022 11 Damage Claims OH 12/22/2021 11 Damage Claims OH 12/3/2021 11 Damage Claims OH 11/15/2021 11 Damage Claims OH 6/27/2022 11 Corrective Maint UG Svc 12/1/2021 11 Elect Annual Proj - DESG CT 4/8/2022 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims UG 2/19/2025 11 Asset Mgmt - Specific DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 12/13/2021 11 Elect Annual Proj - DESG CT 10/18/2021 11 Elect Annual Proj - DESG CT 9/21/2022 11 Asset Mgmt - Specific DESG CT 11/2/2021 11 Damage Claims OH 10/22/2021 11 Damage Claims OH 7/6/2022 11 Asset Mgmt - Specific DESG CT 6/22/2022 11 Asset Mgmt - Specific DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 7/20/2022 11 Elect Annual Proj - DESG CT 3/2/2022 11 Elect Annual Proj - DESG CT 8/28/2023 11 Asset Mgmt - Specific DESG CT 7/28/2022 11 Elect Annual Proj - DESG CT 11/12/2021 11 Damage Claims OH 11/16/2022 11 Corrective Maint OH Svc 11/5/2021 11 Damage Claims OH 3/7/2023 11 Elect Annual Proj - DESG CT 11/1/2021 11 Damage Claims OH 11/20/2024 11 Elect Annual Proj - DESG CT 11/13/2021 11 Elect Annual Proj - DESG CT 11/4/2021 11 Elect Annual Proj - DESG CT 10/25/2021 11 Damage Claims OH 5/11/2023 11 Elect Annual Proj - DESG CT 5/10/2023 11 Elect Annual Proj - DESG CT 10/27/2021 11 Damage Claims OH 11/5/2021 11 Damage Claims OH 11/30/2021 11 Damage Claims OH 10/17/2022 11 Asset Mgmt - Specific DESG CT 4/11/2023 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 5/26/2022 11 Asset Mgmt - Specific DESG CT 11/15/2021 11 Damage Claims OH 12/6/2022 11 Asset Mgmt - Specific DESG CT 3/6/2023 11 Dist Capital or Expense 2/1/2022 11 Dist Capital or Expense 11/9/2021 11 Damage Claims OH 1/15/2025 11 Asset Mgmt - Specific DESG CT 6/13/2022 11 Asset Mgmt - Specific DESG CT 11/9/2021 11 Damage Claims OH 11/19/2021 11 Damage Claims OH 1/15/2025 11 Dist Capital or Expense 11/4/2022 11 Asset Mgmt - Specific DESG CT 7/6/2022 11 Asset Mgmt - Specific DESG CT 11/16/2021 11 Damage Claims OH 11/3/2021 11 Damage Claims OH 11/5/2021 11 Damage Claims OH 11/27/2021 11 Elect Annual Proj - DESG CT 11/23/2021 11 Elect Annual Proj - DESG CT 1/26/2022 11 Elect Annual Proj - DESG CT 11/12/2021 11 Damage Claims OH 12/7/2021 11 Street Light - DESG CT 11/17/2021 11 Elect Annual Proj - DESG CT 2/7/2022 11 Elect Annual Proj - DESG CT 9/12/2022 11 Elect Annual Proj - DESG CT 9/1/2022 11 Corrective Maint OH Svc 12/8/2021 11 Street Light - DESG CT 7/20/2022 11 Asset Mgmt - Specific DESG CT 5/17/2022 11 Damage Claims OH 6/21/2022 11 Asset Mgmt - Specific DESG CT 2/3/2023 11 Elect Annual Proj - DESG CT 3/24/2022 11 Elect Annual Proj - DESG CT 11/13/2021 11 Asset Mgmt - Specific DESG CT 12/9/2021 11 Damage Claims OH 12/18/2021 11 Damage Claims OH 11/12/2021 11 Damage Claims OH 12/15/2021 11 Damage Claims OH 10/12/2022 11 Asset Mgmt - Specific DESG CT 11/17/2021 11 Damage Claims OH 11/17/2021 11 Elect Annual Proj - DESG CT 11/30/2023 11 Asset Mgmt - Specific DESG CT 5/22/2023 11 Elect Annual Proj - DESG CT 12/4/2024 11 Elect Annual Proj - DESG CT 12/6/2021 11 Damage Claims OH 7/18/2022 11 Asset Mgmt - Specific DESG CT 8/20/2024 11 Asset Mgmt - Specific DESG CT 11/27/2021 11 Elect Annual Proj - DESG CT 11/18/2021 11 Damage Claims OH 12/2/2021 11 Damage Claims OH Subsequent Close Date 2/13/2026 2/13/2026 7/17/2026 364310 Poles and Appurtenance 58,424 (44) 3,409 3,032 243 9,785 311 3,384 8,115 18,763 2,877 2,377 1,092 3,678 6,095 2,774 2,332 686 14,120 126 7,081 210 3,477 3,616 1,670 44,346 15,115 979 3,164 (121) 671 860 188 3,217 (1,122) 5,487 274 4,230 2,044 13,179 6,294 232 13,424 2,847 1,742 5,488 20,470 321 5,483 3,564 5,672 5,277 6,092 908 (27) 3,531 119,876 1,865 2,122 57,245 5,892 11,267 840 11,806 1,926 1,291 4,553 9,771 21,854 3,381 7,785 782 8,534 15,863 (162) 456 749 2,824 889 3,594 588 16,902 3,954 637 7,179 1,603 6,240 2,906 9,701 483 7,577 3,794 4,487 8,239 7,070 (213) 60,261 3,601 457 22,435 8,368 5,446 6,072 1,021 132 365000 Overhead Conductors, Device 37,068 4,953 305 105,205 1,187 12,314 464 193 3,653 1,420 96,564 2,244 441 306 2,026 1,302 800 105 3,111 18,992 3,764 1,310 1,391 2,080 532 302,804 17,614 109 3,256 (121) 729 28,150 111 544 (1,122) 4,482 678 1,577 1,205 5,206 559 232 130 901 191 2,348 907 1,994 2,879 2,165 840 223 534 (130) 2,641 425,813 746 2,168 48,824 86,788 704 119 8,985 51,758 119 331 4,933 30,692 62,468 6,019 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 15,795 28,818 1,980 875 34,868 9,458 9,712 368330 Equipment Overhead 712 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 1,878 160 247 385 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 3,422 9,824 3,571 (21) (1) 2,126 618 206 140 120 269 594 30 222 3,891 776 101 120 1,206 6,538 21,284 1,034 (1) 388 64 35,139 1,991 204 (121) 183,614 406 166 348 (1,122) 632 63 346 7,165 450 346 382 347,093 13,346 1,211 232 79 205 45,448 471 2,260 327 225 2,093 725 86 1,872 1,028 597 213 32 3,741 180 604 244 3,466 (162) 1,865 64 197 413 4,798 1,053 6,477 1,473 118 7,821 1,006 31,769 985 59,395 1,025 57,343 5,701 3,345 9,701 115 6,337 5,579 356 3,923 5,988 (213) 173,449 2,933 733 2,130 116,020 13,615 26 18 28,005 14,624 9,701 728 49,829 18,837 9,701 869 303 1,851 12,848 6,832 7,739 14,304 90 339 2,820 492 233 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 96,204 54,821 3,714 108,237 1,430 70,362 12,213 14,302 14,142 21,185 99,441 4,827 1,673 3,984 8,241 4,938 3,132 791 17,231 19,147 11,068 6,186 5,358 5,881 2,202 404,778 35,753 1,291 6,421 (364) 191,958 29,010 299 4,276 (3,366) 11,051 1,361 6,535 357,507 32,942 6,853 695 13,553 3,827 1,933 5,488 22,818 1,432 7,478 54,622 8,163 6,342 6,315 1,442 (157) 7,285 550,379 3,208 4,503 106,069 92,711 15,712 959 20,971 53,684 1,410 5,081 15,721 57,344 65,849 13,804 782 8,777 20,382 (323) 8,797 813 4,296 1,007 40,148 16,218 48,671 4,939 60,032 8,204 58,946 61,770 25,958 38,804 598 13,914 9,373 4,843 15,285 14,909 (426) 253,479 15,104 15,727 24,565 124,388 19,062 6,072 1,047 149
  10. Page 11 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 11 of 104 Work Order Number Description 80137295 RC INSTALL NEW POLE AND CV SERVICE 80137518 DG P#1279 RT 169 WOODSTOCK RMV TRE 80137535 * AMM 2530 BERLIN TPKE, NEWINGTON. 80137658 11/15 DALY RD EAST HAMPTON FRONTIER 80137708 AMM 21 SPRING LN, FARMINGTON. INST 80137810 APPT 2/23 GO APPT 9/28 PRINTED 8/4 80137857 JDB 96 EAST AVE NORWALK,REPL P34258 80137920 Install facilities to FTR poles to 80137934 MG *WRITTEN* Lebanon_Bender Rd_Devi 80138124 (RN)10/31/24 DSINPRG / 10/22/24 80138234 P-744 SHIFT TO FTR 45/2 HURD BRIDGE 80138274 90 DAYS 6/17 9A CAR V FRONTIER P24 80138409 ASP_PMV - TD941 Amity Rd Bethany In 80138635 MF - Susan Terrace, Waterford Repla 80138643 RA 9A -p850 WILSONVILLE RD Thompso 80138721 Stafford Rd, Mansfield BBA P-156. R 80138794 DJM. 33 FERRY LN E WESTPORT. OH TO 80138828 RA - 3 or more Day St, Brooklyn - A 80138900 TL - MEETING HOUSE LN, #1A OLD LYME 80138977 EVW - SHARON ( 214) RD -- S-46, LA 80139098 153 AMITY RD. BLDG #2, BETHANY - IN 80139137 * DO WITH WR#8962775 - AMM 550 CEDA 80139185 11/18/21 9A TURNOVER 68 GARDER RD M 80139239 15 DAY DUE 1/4/22; EAST HADDAM, LAK 80139512 MJGw - CD01649-02 - Reconductor Mot 80139591 11/19/21 9A S MAIN ST NEWTOWN 80139743 TO STORES 3/3/23--P-156 shift to FT 80139761 9A KD-EVENT #4657238 CAR V P 929 SQ 80139790 *COMP* PL:INST NEW POLE, 3PH RISER 80139810 TBCancelled to WO 14185697 when com 80140106 Asplundh - Early pole set completed 80140226 Pomfret Road Hampton - XARM & POLE 80140299 MCB - (9A) 11.22.21 - 1966 BALDWIN 80140308 RA Project CDOT 141-157 RT 12 Thomp 80140328 AC-460 PLAINVILLE RD, FARMINGTON-P# 80140411 READY?KTI RC POLE 9276 RECONNECT TH 80140483 (DF)UPGD 3PH DE POLE, PADMNT- 600A 80140539 MRP - (9A) - CAR V POLE - POLE 4078 80140587 JAM- 120 Kennedy Road New Britain 80140732 9A - 1136 NORTH RD, EAST KILLINGLY, 80140767 9A - CAR VS POLE 80140802 *D&D*JA-Conv#1195253-MakeReadyNonRe 80140838 JFC - WESTWOODS ( 116) RD 1 -- S22 80140847 (DF)(R/I)3PH POLE- UPGD XF; (R/I) C 80140869 JFC - GAY ( 246) ST -- 1371, SHARO 80140871 9A KD-EVENT #4664861/4664761 TURNOV 80140943 MR; ***WRITTEN***MIDDLETOWN, SAYBRO 80140983 (FCOMP), # TELCO W HTFD 28 NEWPORT 80141025 MJ 2/2 0 PONDVIEW DR, NAUGATUCK - I 80141187 9A--CAR VS POLE 315-CROM--11/27/2180141188 MM Baltic-Hanover Rd Frontier P#153 80141197 CAR VS POLE 29 - EMAIL to ENG to c 80141252 CRP - 11/27/21 264 E HARTLAND RD BA 80141397 11/29 - 9A - (Durkee) Suffield, S M 80141492 ALDENONE PENDING BC - CD01866 ROW03 80141499 DB-CD01534-07 State Pier, relocate 80141677 done VIPER SWITCH CD01774 : 29J1 –P 80141712 9A KD-EVENT #4666859/4666870 CAR V 80141750 9A CAR V POLE 80141770 EVW - 9A NORTH CANAAN RD (RT 7) CAN 80141777 KD-EVENT #4665850 REPLC P 12543, 12 80141901 BC - CD01753 ROW004 - P3 Pole Repla 80141942 ?3/14 POLE JFC - LITCHFIELD, beach 80141961 SC-141 WARD AVE PLAINFIELD R-35/4 I 80142084 DG P#1541 23 LIVERY ST PUTNAM CLP 3 80142095 JLB 9A- 464 NOD HILL RD, WILTON/ BR 80142316 Replace Rubber tie 11A77 and 11A56 80142361 *D&D*Frontier Inspection Pole Shift 80142420 12/13 CP-90 Twenty Four Bumper rd H 80142528 CRP - 9A SCHOOL ( 26) ST -- H6098 80142567 12/1 - 9A - East Windsor, Trombley 80142649 Post Construction - 12/1/21 Prospec 80142674 AK-Convo#1182914-MakeReadyNonReimb80142711 15 DD 4/25 SD 59 LONG HILL ROAD MID 80142793 MV - PAWCATUCK, BRUCKER PENTWAY, 26 80142890 9A (GNESDA) N MAIN ( 0) ST UNI 80143030 JLB HERMIT LN, WESTPORT/ TREE VS PO 80143068 12/2 BETTE DR, MANCHESTER P#6689 BR 80143081 12/2 - 9A - Vernon, Dart Hill Rd 80143197 3 OR MORE DG P#1786 WOODSTOCK RD PO 80143223 SEAR 6/22/22 PRE245 9A - ALL WORK C 80143449 WAITING MUNI 10/24/22 NJB 214 PROSP 80143495 9A KD-EVENT #4669678 CAR V P 6923 C 80143654 ASP 1/4 -JRP - 273 Queen St SOG Rep 80143684 *D&D*Conv # 1195305 - Make Ready No 80143699 MATERIAL SD POST CONSTRUCTION 9A MA 80143723 DG P#1845 64 BATES AVE PUTNAM CLP P 80143765 OAK DR, WOODSTOCK CT - BROKEN POLE 80144138 12/7/21 79 TURKEY PLAIN RD BETHEL 80144149 PD-82 BOSTON POST RD WTFD,UPG OH SV 80144168 MR; ***WRITTEN***ALL WORK COMPLETED 80144204 JFC - 9A -WINSTED ( 3601) RD, TORRI 80144268 WC-TD941C 700 N WALNUT WATERBURY. 1 80144345 COMPLETE 2/7/22 RDG RDC NEW PRESTON 80144361 MATERIAL JES; 15 OAKWOOD AVE. NORWA 80144728 In Progress KTI RR; SOUTHBURY, OLD 80144761 MJ - SD 40 ROUND HILL ROAD BETHANY 80144767 MM 188 Bennett Pond Rd Canterbury P 80144869 12/7/21 81 SHORTWOODS RD NEW FAIRFI 80144871 12/6 - 9A - Coventry, Dunn Rd - Eve 80144977 (ASP)BC - CD01753 ROW002 P3 Poles 80145013 278 LAKE RD., VERNON - CHANGE FROM 80145065 60 WESTWOOD AVE, WATERBURY - INST P 80145237 VALID per flotat 11/24/24 - 10/14/2 80145274 VJT - 9A - PARK (856) RD -- M, WATE in-service date work order type 3/11/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 7/6/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 7/21/2023 11 Elect Annual Proj - DESG CT 2/24/2023 11 Elect Annual Proj - DESG CT 9/1/2022 11 Elect Annual Proj - DESG CT 3/31/2022 11 Elect Annual Proj - DESG CT 1/3/2022 11 Elect Annual Proj - DESG CT 11/8/2024 11 Damage Claims OH 2/9/2022 11 Damage Claims OH 12/2/2021 11 Damage Claims OH 8/15/2023 11 Elect Annual Proj - DESG CT 5/27/2022 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 2/8/2025 11 Dist Capital or Expense 11/14/2023 11 Asset Mgmt - Specific DESG CT 12/30/2021 11 Elect Annual Proj - DESG CT 5/2/2025 11 Dist Capital or Expense 12/1/2021 11 Damage Claims OH 2/8/2022 11 Asset Mgmt - Specific DESG CT 9/25/2024 11 Elect Annual Proj - DESG CT 11/26/2021 11 Damage Claims OH 7/20/2022 11 Elect Annual Proj - DESG CT 5/20/2022 11 Asset Mgmt - Specific DESG CT 12/8/2021 11 Damage Claims OH 3/30/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Damage Claims OH 9/8/2022 11 Elect Annual Proj - DESG CT 9/19/2025 11 Dist Capital or Expense 7/25/2022 11 Elect Annual Proj - DESG CT 11/29/2021 11 Elect Annual Proj - DESG CT 11/29/2021 11 Damage Claims OH 11/8/2024 11 Elect Annual Proj - DESG CT 10/29/2024 11 Dist Capital or Expense 4/5/2022 11 Street Light - DESG CT 10/18/2022 11 Elect Annual Proj - DESG CT 11/26/2021 11 Damage Claims OH 5/20/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Damage Claims OH 12/13/2021 11 Damage Claims OH 11/6/2023 11 Elect Project - DESG CT 12/14/2021 11 Damage Claims OH 3/1/2022 11 Corrective Maint UG Svc 12/8/2021 11 Damage Claims OH 12/20/2021 11 Damage Claims OH 7/20/2022 11 Elect Annual Proj - DESG CT 5/29/2023 11 Elect Annual Proj - DESG CT 2/16/2022 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 11/30/2021 11 Elect Annual Proj - DESG CT 12/14/2021 11 Damage Claims OH 12/1/2021 11 Elect Annual Proj - DESG CT 11/30/2021 11 Damage Claims OH 3/14/2023 11 Asset Mgmt - Specific DESG CT 2/23/2023 11 Elect Annual Proj - DESG CT 6/21/2022 11 Asset Mgmt - Specific DESG CT 12/20/2021 11 Damage Claims OH 12/8/2021 11 Damage Claims OH 12/13/2021 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 3/21/2023 11 Asset Mgmt - Specific DESG CT 3/28/2022 11 Elect Annual Proj - DESG CT 6/1/2022 11 Elect Annual Proj - DESG CT 5/28/2025 11 Elect Annual Proj - DESG CT 1/2/2022 11 Damage Claims OH 11/19/2024 11 Elect Annual Proj - DESG CT 11/15/2024 11 Elect Annual Proj - DESG CT 12/17/2021 11 Temporary Work DESG CT 12/8/2021 11 Damage Claims OH 12/2/2021 11 Damage Claims OH 12/6/2021 11 Elect Annual Proj - DESG CT 5/4/2023 11 Elect Project - DESG CT 4/12/2023 11 Elect Annual Proj - DESG CT 2/2/2022 11 Asset Mgmt - Specific DESG CT 12/18/2021 11 Damage Claims OH 4/6/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/3/2021 11 Damage Claims OH 1/7/2022 11 Elect Annual Proj - DESG CT 12/28/2021 11 Damage Claims OH 12/14/2022 11 Elect Annual Proj - DESG CT 12/22/2021 11 Damage Claims OH 1/26/2022 11 Elect Annual Proj - DESG CT 10/29/2023 11 Elect Project - DESG CT 12/27/2021 11 Damage Claims OH 1/7/2022 11 Elect Annual Proj - DESG CT 12/15/2021 11 Elect Annual Proj - DESG CT 12/27/2021 11 Elect Annual Proj - DESG CT 3/15/2022 11 Asset Mgmt - Specific DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/30/2021 11 Damage Claims OH 6/21/2022 11 Dist Capital or Expense 6/14/2022 11 Temporary Work DESG CT 3/30/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 6/22/2022 11 Dist Capital or Expense 4/29/2022 11 Elect Annual Proj - DESG CT 12/28/2021 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 8/26/2022 11 Asset Mgmt - Specific DESG CT 3/23/2022 11 Elect Annual Proj - DESG CT 3/15/2022 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 2/16/2022 11 Damage Claims OH Subsequent Close Date 5/15/2026 1/22/2026 6/26/2026 9/16/2026 4/20/2026 2/13/2026 364310 Poles and Appurtenance 4,950 2,086 389 3,570 349 1,989 2,783 125 15 4,709 2,012 2,676 21,196 5,595 12,240 2,024 3,915 5,497 700 2,412 4,671 3,637 294 1,267 45,474 776 418 2,283 4,763 2,301 5,857 8,448 14,139 6,099 1,124 3,893 1,490 1,692 2,775 2,429 487 3,430 2,008 5,785 2,248 5,920 5,368 46 6,248 3,548 318 5,967 1,085 4,806 35,981 44,804 3,418 1,628 2,357 1,454 19,258 88,199 1,037 3,686 10,461 10,331 2,939 1,350 223 877 19,681 16,737 (77) 2,332 7,917 2,394 17,435 12,056 7,206 4,818 3,580 2,955 12,076 13,532 15,864 6,427 (227) 27,078 3,543 2,881 676 9,861 11,130 329 5,705 4,599 1,843 2,842 1,397 9,943 20,360 1,250 4,549 (280) 11,933 365000 Overhead Conductors, Device 4,203 2,299 6,332 1,556 1,604 837 1,590 61 3,219 186 5,506 26,517 2,659 2,688 5,153 1,162 40,154 1,905 911 4,216 9,776 173 179 19,491 104 218 4,594 51 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 1,177 7,911 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 521 (703) 438 (446) 490 57 124 378 14 153 4,479 1,228 491 (24) 269 444 311 1,866 170 878 1,356 465 8,019 956 175 91,024 130 90 (30) 9,585 342 (321) 440 2,480 28 3,037 2 1,404 64 725 8,828 658 4 25,782 32,454 56,212 6,107 4,818 (77) 1,113 208 341 3,212 541 215 36,302 756 3,105 1,188 5,082 53,847 164 7,721 2,042 1,322 114 474 4,360 258 74 502 328 1,397 3,868 106 3,637 492 3,435 189 8,152 716 330 3,865 20,567 2,742 7,807 103 75 66 1,470 7,968 126 3,789 13,976 912 1,240 105 26 515 (77) (77) 87 231 8,484 1,277 1,790 434 930 3,255 102 2,422 6,789 34,236 329 3,353 120 11,958 2,244 528 5,168 960 635 997 (506) 2,177 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 406 11,668 9,176 4,154 143 15,634 1,578 1,880 3,345 2,862 1,293 2,333 642 772 847 8,657 1,038 370470 Meter Equipment 22,096 372 1,024 11,776 150 2,269 77 3 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 10,852 2,086 10,334 10,307 13,617 12,769 4,151 1,910 76 12,407 2,198 8,673 48,917 8,255 15,197 7,621 6,266 47,517 4,131 3,323 9,527 112,456 467 1,878 66,020 880 418 2,501 19,063 2,352 8,337 12,602 14,282 21,733 1,124 3,920 6,364 3,572 6,194 5,793 2,107 7,167 2,649 7,346 3,095 23,405 7,063 46 7,649 7,415 424 9,604 1,577 4,806 61,763 77,324 59,630 1,628 7,262 1,643 35,378 88,915 1,494 25,316 33,180 13,073 10,852 1,453 324 877 26,303 21,555 (306) 4,810 10,146 2,735 20,647 12,597 7,421 41,120 4,336 15,907 13,264 18,614 72,965 6,592 (227) 34,799 5,688 6,625 789 17,124 49,726 658 31,526 4,720 26,600 7,504 1,925 15,111 21,320 1,962 5,549 (786) 14,110

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)