Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 21 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 21 of 104 Work Order Number Description 80214666 DONE PRINT BJQ - WARREN, CORNWALL, 80214676 (BCW MATERIAL) *D&D*CD02444 Pole In 80214722 (BCW MATERIAL) *D&D*CD02444 Pole In 80214781 (BCW MATERIAL) *D&D*CD02444 Pole In 80214809 (BCW MATERIAL) *D&D*CD02444 Pole In 80214856 (BCW MATERIAL) *D&D*CD02444 Pole In 80214871 (BCW MATERIAL) *D&D*CD02444 Pole In 80215011 JFM-1P LINE EXTENSION - 40 BARCLARE 80215014 * PM-INT- 102024 - 85 TULIP DR MER 80215020 JMS- AVON 333 MONTEVIDEO RD NEW POL 80215022 MG-P#883 LISBON RD CANTERBURY-RPLCD 80215024 AC-40 ROUTE 37 SOUTH, SHERMAN-9A PO 80215029 OK TO CLOSE 12/19 - RSO - [LEFEBVRE 80215050 JMS-WEST HARTFORD POLE 102 REPLACE 80215062 DJM. 72 LUDLOW RD WESTPORT. OH 200A 80215076 WRTN NEEDS WORK LINWOOD( 60) 80215094 Talcottville Rd 548, Vernon. Replac 80215158 JFM-*POST CNSTR*-12/20/24 9A CAR VS 80215240 (BCW MATERIAL) *D&D*CD02444 Pole In 80215281 *D&D* Frontier Pole Inspection Pole 80215292 *D&D*CD02444 Pole Integrity Replace 80215315 *D&D* Frontier Pole Inspection Pole 80217289 JTR, 36 S MAIN ST, EAST GRANBY, 9A 80217304 9A -Car vs Pole - waiting on status 80217310 9A 10 Jackson Rd Plainfield P#3226 80217315 9A - CAR VS POLE 2008-S - APPROVED 80217325 GDK 9A 12.20.24 RSO LEMIEUX HOPMEAD 80217326 UNCASVILLE, MARIE, 9, KEVIN O'CONNO 80217337 GP - REPLACE POLE 277 - CLINTON WTB 80217348 9A - CAR VS POLE 5808s - APPROVED 3 80217369 (BCW MATERIAL) *D&D*CD02444 Pole In 80217414 MCB - WTG FOR PD RPT 12/31/24 (TH) 80217419 *D&D*CD02444 Pole Integrity Replace 80217448 *D&D* Frontier Pole Inspection Pole 80217603 WRTN - DM - GLASTONBURY, NAUBUC, 0, 80217658 PM-MOUNT PLEASANT ST MERIDEN-POST C 80217678 Issue Pole DJM. 28 PIN OAK CT WESTP 80217691 9A- CAR VS POLE - APPROVED 10/9 80217701 PD REPORT ORDERED 1/2/25-9A CAR VS 80217704 9A - CAR VS POLE 80217716 *D&D* Frontier Inspection Pole Shif 80217718 *D&D*CD02444 Pole Integrity Replace 80217729 9A - LD- 591 W MAIN ST, NEW BRITAIN 80217735 PRINT JSG - COLEBROOK, CHURCH HILL, 80217751 9A TC 189 TACONIC RD, GRN: P#72529 80218053 PR 10/6 MDB - EAST CANAAN, NORFOLK, 80218329 12/23/24, RSO, JK>POLE 440--REPLACE 80218335 9A CAR VS POLE - APPROVED 3/20/26 80218367 NONBILLABLE - LOW WIRES (TH) 12/23 80218390 9A - CAR VS POLE - APPROVED 2/21/20 80218918 *D&D* 609 N MAIN ST, SOUTHINGTON 80218960 KTI CDOT 34-351 - Install new pole 80219235 WRTN--JK>POLE 4790--FTR TO SET STUB 80219247 WRTN--JK>P-4100--REPL 3PH POLE TOP, 80219286 P6794 REPLACE CAN WITH 50KVA 275 MI 80219944 *D&D* Frontier Pole Inspection Pole 80219945 *D&D* Frontier Pole Inspection Pole 80219951 SD 49 DAY ST /WASHIGTON ST SEYMOUR 80219955 Jpt-94 Candy Ln Bristol P11670 - Rp 80219961 Jpt-491 James P. Casey Rd Bristol P 80219963 9A* EVENT 5561879 12/25(TURNOVER80219965 all work complete - 9A* (TURNOVER80219973 fcomp on 12/26 9A - 12/25 - RSO - [ 80219987 9A 12/24 ROUTE 202(289) -- 2952, 80219989 South Grand St 426, Suffield. Front 80220008 WRTN - DM - PORTLAND RD MARLBOROUGH 80220048 TL - WOODBRIDGE RD, #45 NIANTIC // 80220098 HEL WQ 4/6/22 MAIN ( 218) ST S -80220109 P#1571 WILSONVILLE RD THOMPSON HBV 80220239 MATERIAL RM, (CP) 5 GOOD HILL RD 80220296 (BCW MATERIAL) *D&D*CD02444 Pole In 80220376 1.09.25 PD REQ AB -EVW - 9A - 12/24 80220403 MATERIAL DJM. EASTON( 127) RD 80220414 BC - CD02537-01 - Madison SS - 30R1 80220415 9A CAR VS POLE - APPROVED 3/20/2026 80220448 *D&D*CD02444 Pole Integrity Replace 80220588 203 DONE--GRISWOLD, BURTON, 41, Jam 80220852 1.13.25 DSINPRG (AB) 12/28/24 9A TU 80220854 9A - CAR VS FRONTIER POLE 809 - APP 80220860 9A - CAR VS POLE 923-S - APPROVED 2 80220867 MCB - W F PD RPT 12/31/24 (TH) 12/ 80220871 *ALL WORK COMPLETE - GP P#1375 19 L 80220876 *POST CONSTRT* 12/28 9A CAR VS POLE 80220878 *****ALL WORK COMPLETE*****9A* TURN 80220880 JD; 9A - 983 E MAIN ST, STAMFORD 80220890 12-31-24 PR -SL - 9A - 670 Yalesvil 80220904 **POST CONSTRUCTION** 1095 MAIN S 80220925 JTR, 701 MARSHALL PHELPS, WINDSOR, 80220936 DG P#864 WILSONVILLE RD THOMPSON RP 80220944 *material*MM - 14 STURGES RDG RD, W 80220991 *D&D*CD02444 Pole Integrity Replace 80221007 WO 19652387, INT-102521, DG UPGRADE 80221044 12/30/24 TURNOVER 141 PAPER MILL R 80221046 (BCW MATERIAL) *D&D*CD02444 Pole In 80221047 PRINT EVW - 84 Sugar Hill Rd, Salis 80221073 JFM- POST CNSTR***TURNOVER*** 115 G 80221092 MM 21 Sam CHikan Rd Griswold P#456 80221096 *D&D* Frontier Pole Inspection Pole 80221127 *D&D*CD02444 Pole Integrity Replace 80221133 (BCW MATERIAL) *D&D*CD02444 Pole In 80221192 *D&D* Frontier Pole Inspection Pole 80221294 APPRENTICES MPB; 12/30/24 RAILTREE 80221315 CAR VS POLE-APPROVED 4/1/2026 80221319 9A CAR VS POLE - DUPLICATE TO FWO#8 80221322 TURNOVER - 12/30 - AWC - LEWIS(41) in-service date work order type 2/21/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 2/12/2025 11 Elect Annual Proj - DESG CT 1/3/2025 11 Elect Annual Proj - DESG CT 1/15/2025 11 Dist Capital or Expense 12/23/2024 11 Damage Claims OH 1/7/2025 11 Dist Capital or Expense 1/10/2025 11 Elect Annual Proj - DESG CT 2/7/2025 11 Dist Capital or Expense 3/17/2025 11 Corrective Maint OH Svc 1/30/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 1/2/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 1/9/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/13/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 3/20/2025 11 Damage Claims OH 1/10/2025 11 Damage Claims OH 3/11/2025 11 Damage Claims OH 6/25/2025 11 Elect Annual Proj - DESG CT 2/5/2025 11 Corrective Maint OH Svc 3/18/2025 11 Damage Claims OH 3/3/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 1/6/2025 11 Damage Claims OH 4/23/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 1/4/2025 11 Damage Claims OH 1/15/2025 11 Dist Capital or Expense 3/4/2025 11 Damage Claims OH 1/28/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 3/12/2025 11 Street Light - DESG CT 3/4/2025 11 Dist Capital or Expense 5/29/2024 11 Elect Annual Proj - DESG CT 2/4/2025 11 Dist Capital or Expense 4/21/2025 11 Damage Claims OH 1/6/2025 11 Damage Claims OH 1/31/2025 11 Damage Claims OH 5/1/2023 11 Elect Annual Proj - DESG CT 9/23/2025 11 Dist Capital or Expense 4/14/2023 11 Elect Annual Proj - DESG CT 5/19/2023 11 Elect Annual Proj - DESG CT 6/28/2022 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 2/4/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 1/2/2025 11 Dist Capital or Expense 1/6/2025 11 Elect Annual Proj - DESG CT 1/21/2025 11 Damage Claims OH 1/28/2025 11 Dist Capital or Expense 1/31/2025 11 Damage Claims OH 4/15/2025 11 Damage Claims OH 4/16/2025 11 Dist Capital or Expense 1/22/2025 11 Dist Capital or Expense 6/14/2022 11 Elect Annual Proj - DESG CT 2/23/2023 11 Elect Annual Proj - DESG CT 5/17/2022 11 Damage Claims OH 2/21/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 8/26/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 6/17/2025 11 Dist Capital or Expense 7/6/2022 11 Elect Annual Proj - DESG CT 1/24/2025 11 Damage Claims OH 4/8/2025 11 Damage Claims OH 1/10/2025 11 Damage Claims OH 1/3/2025 11 Damage Claims OH 2/12/2025 11 Elect Annual Proj - DESG CT 1/8/2025 11 Damage Claims OH 1/27/2025 11 Dist Capital or Expense 2/5/2025 11 Damage Claims OH 1/7/2025 11 Damage Claims OH 3/13/2025 11 Elect Annual Proj - DESG CT 1/6/2025 11 Dist Capital or Expense 1/6/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 1/31/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 1/3/2025 11 Elect Annual Proj - DESG CT 1/10/2025 11 Dist Capital or Expense 1/14/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 2/18/2025 11 Damage Claims OH 8/29/2025 11 Damage Claims OH 3/25/2025 11 Elect Annual Proj - DESG CT Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 364310 Poles and Appurtenance 166 4,882 5,991 2,263 8,130 4,907 6,324 323 (275) 6,151 13,751 8,048 11,907 3,010 5,722 4,257 1,385 1,512 5,411 577 5,436 328 10,794 4,281 2,532 6,744 12,251 21 5,200 5,904 3,560 1,218 4,132 89 1,867 11,073 5,416 5,201 908 8,996 1,944 2,720 1,690 1,028 2,618 6,092 1,369 7,169 7,390 10,462 736 3,834 2,186 7 (164) 146 194 1,733 1,356 3,914 7,398 1,476 10,468 674 1,568 11,175 4,939 264 3,844 4,418 5,941 6,572 6,076 7,919 22,798 1,998 955 6,265 2,688 1 11,002 5,621 11,450 9,557 8,921 942 2,920 2,976 2,238 3,042 2,546 2,592 14,475 7,790 150 764 59 38 2,419 8,929 212 343 7,540 1,551 3,007 365000 Overhead Conductors, Device 1,735 3,041 1,891 1,405 675 740 18,308 (523) 118 5,484 124 16,832 1,567 1,061 203 159 7,250 2,237 71 1,920 393 11,557 120,931 4,246 415 1,628 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 150 (38) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 465 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 133 334 278 337 3,440 123 5,615 164 436 2,066 23 2,156 3,649 527 247 257 3,563 1,958 1,381 6,228 731 2,025 488 3,605 180 514 105 1,269 216 256 4,047 1,955 8,527 1,632 9,681 310 2,239 398 183 (262) 1,529 220 955 246 147 273 300 8,138 2,394 2,870 1,309 2,182 974 456 428 134 105 1,422 3,118 12,080 543 118,968 3,036 197 98 1,114 11,164 2,447 322 211 3,591 1,957 1,467 4,246 1,321 1,004 7,352 148,982 696 832 933 1,021 41 227 1,054 1,990 450 1,755 3,940 1,025 190 2,421 1,571 1,949 3,968 635 94 359 348 405 119 138 493 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 631 6,618 9,031 4,154 9,534 5,582 7,065 18,914 (836) 6,268 19,569 8,172 28,739 4,577 7,399 4,460 1,545 12,203 7,648 649 7,479 721 27,965 125,212 6,943 9,661 13,879 44 7,356 5,904 3,560 5,355 4,659 335 5,730 14,816 9,157 6,687 7,136 9,728 4,184 2,720 1,946 1,028 2,618 21,762 3,323 15,696 7,390 12,701 1,134 4,017 2,186 18 1,666 366 1,149 10,117 1,503 3,914 9,791 1,476 13,338 2,411 3,749 12,150 5,726 264 3,948 5,939 9,058 23,356 6,619 126,887 25,834 1,998 14,287 8,711 3,010 1 12,469 5,621 16,716 10,878 9,925 8,294 151,902 3,713 3,069 4,695 2,546 4,005 16,465 8,240 2,254 4,704 1,084 228 2,419 11,755 1,902 2,291 11,645 2,186 3,101
  2. Page 22 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 22 of 104 Work Order Number Description 80221327 GP - Replace Pole - 24 WALKER AVENU 80221331 9A - Car vs. Pole - APPROVED 4/3/26 80221340 APPT 2/5 PM-232 MILL ST BERLIN-MLC80221454 (BCW MATERIAL) *D&D*CD02444 Pole In 80221477 9A - Car vs Pole - APPROVED 4/16/25 80221510 (BCW MATERIAL) *D&D*CD02444 Pole In 80221524 *D&D* MA-Conv#1670175-MakeReadyNonR 80221525 DG P#2509 THOMPSON RD THOMPSON FRNT 80221557 *D&D*CD02444 Pole Integrity Replace 80221591 (BCW MATERIAL) *D&D*CD02444 Pole In 80221611 Jpt-240 Sonstrom Rd Bristol P12195 80221624 *D&D*CD02444 Pole Integrity Replace 80221626 **AVON, AYRSHIRE, 71, NEW SVC OH/UG 80221655 DONE PRINT BJQ, LTCH, P #2416 (166) 80221688 DONE-BJQ - 12/30 - TREE DOWN -- POL 80222747 MATERIAL - KD-EVENT #4733115 SET NE 80222795 1060 HUNTINGDON AVE, WATERBURY - NE 80223689 TURNOVER E#5564550 1/1/25 2 HINE H 80223693 AC-12 BRIGGS HILL RD, SHERMAN-POST 80223701 DG P#3057 THOMPSON HILL RD THOMPSON 80223703 WRTN - DM - 9A*1/1 - AWC - NEIPSIC( 80223759 PRINT BJQ - 12/30 - RSO - [GILBEJM] 80223772 !!! AE/TC 28 PUTNAM HILL, GRN: P#76 80223793 (BCW MATERIAL) *D&D*CD02444 Pole In 80223855 MG-P#-365-P#367POMFRET RD (459) BRO 80223863 *D&D*CD02444 Pole Integrity Replace 80223884 JOB COMPLETE IN FIELD VJT - TURNOVE 80223963 Pend Meters, BWG-1190 Kennedy Road, 80224074 BC - CD01576 - 47N3 Overload - Inst 80224100 WM; NEW MILFORD, STILSON HILL, 151, 80224115 on ld APPT 8/8 CHECK SCN Repl. Defe 80224173 DG P#439 RAWSON RD WOODSTOCK FRNTR 80224175 CC; WASHINGTON DEPOT, WORCHESTER, 7 80224196 *D&D* Frontier Pole Inspection Pole 80224222 *D&D* KG Conv#1667190-RegularMakeRe 80224514 (BCW MATERIAL) *D&D*CD02444 Pole In 80224533 PD PROGRESS-12-09-2025 - STATE PD 80224995 DB-CD01765-05, remove 11Y3/11Y7 row 80224998 APPRENTICES BM; Southbury, Strongto 80225011 MR; SET STUB POLE & ANC, REMOVE TRE 80225075 NEWTOWN TPKE, P 7351, WESTPORT CT 80225138 *WTBY AWC*COMP 7/20*108 Rado Dr, Na 80225198 CD01912 Segment 01, LAG, Breakneck 80225204 CD01912 Segment 02, LAG, Old Watert 80225208 TURNOVER 1/2/25 E 5568003 152 LOPU 80225281 *D&D*CD02444 Pole Integrity Replace 80225292 *D&D* Frontier Pole Inspection Pole 80225348 * MAR - Replace Damaged OH Svc& Ins 80225608 *D&D*CD02444 Pole Integrity Replace 80225652 (BCW MATERIAL) *D&D*CD02444 Pole In 80225687 MM 169 Norman Rd Griswold P#685 rep 80225697 DJM. 14 PUNCH BOWL DR WESTPORT. OH 80225789 (BCW MATERIAL) *D&D*CD02444 Pole In 80225831 (BCW MATERIAL) *D&D*CD02444 Pole In 80225850 AE/JD; 172 URSULA PL STAMFORD; 3PH 80225852 PRINT JFC - MORRIS, BANTAM LAKE, 44 80225899 GC - UNCASVILLE, RAYMOND HILL, 162 80226016 9/30 ????EARLY POLE SET; WINDHAM, p 80226059 APPT 11/29 MAR - 400amp Upgrd& repl 80226087 Appr Grp JTR, 20 Eastern Park Rd, E 80226154 *D&D* Frontier Pole Inspection Pole 80226160 *D&D*CD02444 Pole Integrity Replace 80226169 (BCW MATERIAL) *D&D*CD02444 Pole In 80226239 TURNOVER 1/5/2025 E 5569186, 55692 80226240 *****ALL WORK COMPLETE*****1/4/24-80226329 WRM -JPT-12 Powder Hill Rd Middlefi 80226350 94 Great Harbor Rd, Guilford-shift 80226364 1.06.25 PD W/# ORDRD AB-EVW - 9A CA 80226402 AE/TC 165 JOHN ST, GRN: INSTALL 100 80226406 15DD 4/4 Jpt-65 Cronin St Bristol P 80226523 LD-865 W MAIN - NEW BRITAIN- P# 753 80226561 comp-1/5/25 9A TURNOVER 435 EAST ST 80226584 Jpt-200 Terryville Rd Bristol - 3rd 80226587 *D&D*CD02444 Pole Integrity Replace 80226729 WRTN--JK>POLE 623--FTR TO REPL 1 PO 80226744 RL:144 RAILROAD AVE:GRN: 800 AMP 27 80226836 (BCW MATERIAL) *D&D*CD02444 Pole In 80226851 BWG-BRIAN(18) DR -- 222, BOLTON, CT 80226895 (BCW MATERIAL) *D&D*CD02444 Pole In 80226923 *D&D*CD02444 Pole Integrity Replace 80226925 NONBILLABLE (TH) 1/6/25 9A 43 MEADO 80226966 SC417 WYLIE SCHOOL RD VOLUNTOWN R-3 80226972 MJ -1261 N Colony Rd 80227093 (BCW MATERIAL) *D&D*CD02444 Pole In 80227099 *SYS PROJ* CD02444 Pole Integrity R 80227114 (BCW MATERIAL) *D&D*CD02444 Pole In 80227122 *EH AWC* CD02444 Pole Integrity Rep 80227162 CD02444 Pole Integrity Replacement 80227165 (BCW MATERIAL) *D&D*CD02444 Pole In 80227195 *D&D*Frontier Pole Inspection Pole 80227196 (BCW MATERIAL) *D&D*CD02444 Pole In 80227206 (BCW MATERIAL) *D&D*CD02444 Pole In 80227221 EVW - 16 Six Rod Rd, Falls Village 80227414 E.P.-135 WATER STREET, STONINGTON80227442 PR 8/30 JFC - DUDLEYTOWN RD-- P6809 80227455 KTI AC-34 SHORTWOODS RD, NEW FAIRFI 80227465 CAR VS POLE - APPROVED 5/12/26 80227471 JTR, 18 Brian Dr, Bolton, Replace P 80227474 DONE BJQ - 12/29 - RSO - [CHANND] 80227494 *SYS PROJ* CD02444 Pole Integrity R 80227524 DG P#2023 145 PERRIN RD WOODSTOCK D 80227702 NONBILLABLE - 2YR STATUE (TH) 4/21/ 80227708 (BCW MATERIAL) *D&D*CD02444 Pole In 80227713 *ASP* CD02444 Pole Integrity Replac 80227716 *1CS* WRTN NEEDS LINE Ap Gates Rd / in-service date work order type 2/12/2025 11 Damage Claims OH 1/29/2025 11 Damage Claims OH 2/5/2025 11 Corrective Maint OH Svc 4/25/2025 11 Dist Capital or Expense 3/31/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 1/22/2025 11 Damage Claims OH 7/7/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/31/2025 11 Dist Capital or Expense 1/6/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/18/2023 11 Elect Annual Proj - DESG CT 2/24/2025 11 Dist Capital or Expense 1/7/2025 11 Elect Annual Proj - DESG CT 1/21/2025 11 Elect Annual Proj - DESG CT 1/6/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/3/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 6/7/2022 11 Damage Claims OH 5/8/2023 11 Elect Annual Proj - DESG CT 6/30/2023 11 Asset Mgmt - Specific DESG CT 6/13/2025 11 Dist Capital or Expense 8/9/2022 11 Elect Annual Proj - DESG CT 1/9/2025 11 Elect Annual Proj - DESG CT 6/27/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 3/4/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 4/13/2022 11 Elect Annual Proj - DESG CT 4/13/2023 11 Elect Annual Proj - DESG CT 5/15/2025 11 Elect Annual Proj - DESG CT 7/21/2025 11 Elect Annual Proj - DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 1/14/2025 11 Elect Annual Proj - DESG CT 9/15/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 5/20/2022 11 Street Light - DESG CT 4/22/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 6/18/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 4/2/2025 11 Corrective Maint UG Svc 8/16/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 11/29/2023 11 Asset Mgmt - Specific DESG CT 7/17/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 2/4/2025 11 Dist Capital or Expense 5/23/2022 11 Elect Annual Proj - DESG CT 5/18/2022 11 Elect Annual Proj - DESG CT 1/7/2025 11 Dist Capital or Expense 6/2/2025 11 Corrective Maint UG Svc 3/26/2025 11 Dist Capital or Expense 1/8/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/28/2025 11 Corrective Maint OH Svc 4/22/2025 11 Dist Capital or Expense 7/20/2022 11 Elect Annual Proj - DESG CT 12/21/2022 11 Elect Annual Proj - DESG CT 6/17/2025 11 Dist Capital or Expense 3/25/2025 11 Corrective Maint OH Lines 6/13/2025 11 Dist Capital or Expense 11/10/2025 11 Dist Capital or Expense 3/28/2025 11 Damage Claims OH 9/2/2022 11 Elect Annual Proj - DESG CT 9/1/2022 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 1/21/2025 11 Elect Annual Proj - DESG CT 6/1/2022 11 Elect Annual Proj - DESG CT 9/12/2022 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 1/9/2025 11 Damage Claims OH 1/10/2025 11 Elect Annual Proj - DESG CT 1/16/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 5/8/2025 11 Elect Annual Proj - DESG CT 5/1/2025 11 Damage Claims OH 6/13/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense Subsequent Close Date 7/17/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 8/26/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 364310 Poles and Appurtenance 10,534 6,549 1,661 6,012 3,286 2,204 10,763 2,535 4,754 5,428 6,375 7,542 29 630 504 4,817 5,502 8,886 9,313 11,181 (664) 12,842 5,850 11,542 129 4,657 4,024 4,606 4,566 6,233 3,542 755 50 152 8,323 5,336 4,073 6,700 436 7,528 720 316 56,655 9,915 18,577 3,323 373 3,678 16,694 7,467 7,521 2,945 5,814 1,744 2,480 (59) 323 633 (39) 3,297 76 3,870 5,948 24,630 2,101 2,298 206 4,276 1,442 4,995 2,169 8,707 1,122 4,929 2,807 4,237 7,614 702 6,500 1,501 6,717 2,602 3,480 5,504 5,093 5,276 4,245 7,775 4,545 333 4,157 3,046 7,836 2,880 601 4,026 1,389 25,896 13,443 8,788 (46) 491 6,809 8,483 3,339 365000 Overhead Conductors, Device 2,586 17,514 706 4,173 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 1,058 635 219 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 2,819 248 322 5,815 3,150 1,638 745 3,987 2,676 17 110 564 224 92 5,566 2,401 9,321 (26) 678 239 1,287 (2,287) 735 2,459 1,492 103 1,643 144 5,175 11,450 2,353 64,194 2,604 305 183 3,282 814 3,844 311 32,223 590,535 45 5,166 174 1,476 679 28 169 226,965 285 409 92,471 691 349,172 49,742 3,627 175 704 2,794 6,488 301 17 250 1,054 1,867 2,279 1,960 1,170 760 1,154 7,345 368 89 327 1,286 9,031 2,269 207 (8) 831 5,813 2,817 435 49 1,485 1,399 396 842 1,607 (558) 981 120 (48) 73 25 38 619 278 508 293 1,039 1,953 2,693 4,146 4,044 1,674 282 2,632 225 797 5,411 12,361 2,401 107 1,733 9,395 729 489 16 234 476 128 1,540 1,758 727 582 821 901 1,792 703 2,049 224 255 15,334 4,951 13,232 22,149 1,555 (368) 239 851 1,001 1,226 74 867 364 719 308,059 52,112 7,791 179 (31) (151) 197 85 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 14,177 27,517 2,834 10,507 3,286 2,204 16,578 5,909 6,393 6,173 10,362 10,218 138 740 1,069 4,817 21,041 11,526 9,313 12,468 893 13,577 8,309 13,345 233 6,300 4,169 47,169 606,551 10,237 67,736 4,038 598 335 11,605 6,150 4,073 233,664 721 7,528 1,129 102,069 406,819 59,674 22,454 3,499 1,077 4,732 18,561 10,114 9,966 5,284 6,574 4,184 20,463 (617) 3,647 983 (95) 3,297 76 3,870 6,779 30,443 4,918 2,771 875 6,039 5,857 6,727 2,462 9,746 3,075 7,622 6,953 18,895 9,288 1,000 9,366 1,726 7,515 10,030 15,969 5,504 6,851 6,003 4,826 8,596 5,447 333 5,949 3,749 10,827 3,104 856 19,360 6,704 39,847 395,763 10,342 (595) 8,897 7,660 9,485 4,649
  3. Page 23 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 23 of 104 Work Order Number Description in-service date work order type 80227717 PRINT BJQ - WO 19771749-INT-1030526/26/2025 11 Elect Annual Proj - DESG CT 80227731 *ICS* written01/07/25 Johnson Rd Co 4/14/2025 11 Dist Capital or Expense 80227738 *SYS PROJ* CD02444 Pole Integrity R 7/7/2025 11 Dist Capital or Expense 80227742 1/6/25 OLD WOODBURY (90) RD -- G360 1/7/2025 11 Elect Annual Proj - DESG CT 80227761 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80227767 *ICS* WRTN NEEDS LINE Warner Rd Eas 4/17/2025 11 Dist Capital or Expense 80227778 INT-101153 NORTH STONINGTON, OLD C 8/18/2025 11 Dist Capital or Expense 80227779 *ASP* CD02444 Pole Integrity Replac 6/3/2025 11 Dist Capital or Expense 80227790 RM - 12 LAUREL LAKE W, WESTON CT!! 1/16/2025 11 Elect Annual Proj - DESG CT 80227810 *SYS PROJ* CD02444 Pole Integrity R 7/7/2025 11 Dist Capital or Expense 80227818 CD02444 Pole Integrity Replacement 4/28/2025 11 Dist Capital or Expense 80227835 *SYS PROJ* CD02444 Pole Integrity R 12/15/2025 11 Dist Capital or Expense 80227840 CD02444 Pole Integrity Replacement 5/21/2025 11 Dist Capital or Expense 80227847 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80227856 PRINT EVW - 23 Canaan Valley Rd, No 5/28/2025 11 Dist Capital or Expense 80227879 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227902 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227910 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227923 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227937 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227958 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80227963 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80227983 *SYS PROJ* CD02444 Pole Integrity R 7/10/2025 11 Dist Capital or Expense 80227993 CD02444 Pole Integrity Replacement 5/15/2025 11 Elect Annual Proj - DESG CT 80228028 GDK INT-95639 WO# 18013696 WINDSOR, 2/26/2025 11 Elect Annual Proj - DESG CT 80228033 *D&D*Frontier Pole Inspection Pole 2/5/2025 11 Dist Capital or Expense 80228074 *D&D*Frontier Pole Inspection Pole 1/28/2025 11 Dist Capital or Expense 80228085 *ASP* CD02444 Pole Integrity Replac 3/28/2025 11 Dist Capital or Expense 80228172 1/7/25, RSO/AWC, JK>TREE V FTR POLE 2/7/2025 11 Elect Annual Proj - DESG CT 80228177 LD - P5032 - OLD HATCHERY RD, BERL 1/16/2025 11 Elect Annual Proj - DESG CT 80228183 WRTN - DM - 1/8 WINDHAM (305) AVE C 2/3/2025 11 Dist Capital or Expense 80228210 *EH AWC* CD02444 Pole Integrity Rep 5/15/2025 11 Dist Capital or Expense 80228372 CD02444 Pole Integrity Replacement 5/8/2025 11 Dist Capital or Expense 80228384 *ASP* CD02444 Pole Integrity Replac 6/3/2025 11 Dist Capital or Expense 80228438 *SYS PROJ* CD02444 Pole Integrity R 9/16/2025 11 Dist Capital or Expense 80228553 CAR VS POLE- AWAITING POLICE REPORT 7/21/2022 11 Damage Claims OH 80228629 Asplundh - 3/24 WELLS ( 127) RD -7/8/2022 11 Elect Annual Proj - DESG CT 80228633 DB-CDOT 44-156/CD02031-01 Stage1A, 10/24/2023 11 Asset Mgmt - Specific DESG CT 80228642 DB-CDOT 44-156/CD02031-02 Stage1A, 1/2/2024 11 Asset Mgmt - Specific DESG CT 80228649 DB-CDOT 44-156/CD02031-02 Stage1B, 5/1/2024 11 Asset Mgmt - Specific DESG CT 80228728 *D&D*Frontier Pole Inspection Pole 3/11/2025 11 Dist Capital or Expense 80228744 *SYS PROJ* CD02444 Pole Integrity R 7/24/2025 11 Dist Capital or Expense 80228775 JTR, 182 Case St , Granby, 9A - Shi 3/21/2025 11 Dist Capital or Expense 80228778 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80228779 *SYS PROJ* CD02444 Pole Integrity R 9/25/2025 11 Dist Capital or Expense 80228798 *D&D* KG Conv#1667190-RegularMakeRe 10/28/2025 11 Dist Capital or Expense 80229007 KILLINGWORTH - 1PH UG LINE EXT. - R 11/19/2025 11 Dist Capital or Expense 80229028 DONE PRINT for Early Pole Set - BJQ 5/7/2025 11 Corrective Maint OH Svc 80229046 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80229050 *D&D* KG Conv#1667190-RegularMakeRe 12/1/2025 11 Dist Capital or Expense 80229054 Appr Grp Bebbington Rd 287, Ashford 3/11/2025 11 Dist Capital or Expense 80229064 DONE PRINT CRP - 1/7 [CROWLCJ] - PO 1/17/2025 11 Dist Capital or Expense 80229069 Appr Grp Pompey Hollow Rd 118, Ashf 3/26/2025 11 Dist Capital or Expense 80229071 (BCW MATERIAL) *D&D*CD02444 Pole In 4/22/2025 11 Dist Capital or Expense 80229074 Appr Grp Bebbington Rd 236, Ashford 3/11/2025 11 Dist Capital or Expense 80229077 PD-384 WILLETTS AVE EXT WTFD/LINE E 12/4/2025 11 Dist Capital or Expense 80229124 WALES( 26) RD -- 3662, STAFFORD SPG 1/23/2025 11 Corrective Maint OH Lines 80229135 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80229190 MATERIAL ASP 4/21 MCB - 56 CHAMBERS 11/18/2022 11 Elect Annual Proj - DESG CT 80229218 Priority Pole P#1275 Sunset Lane Cl 4/22/2022 11 Elect Annual Proj - DESG CT 80229310 *D&D*Frontier Pole Inspection Pole 7/24/2025 11 Dist Capital or Expense 80229312 *D&D*CD02444 Pole Integrity Replace 11/14/2025 11 Dist Capital or Expense 80229317 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80229318 CD02444 Pole Integrity Replacement 5/14/2025 11 Dist Capital or Expense 80229339 *D&D*Frontier Pole Inspection Pole 3/19/2025 11 Dist Capital or Expense 80229361 Essex, 33 Maple Ave/Remove tree guy 5/29/2025 11 Dist Capital or Expense 80229365 **MM - 82 INDIAN HILL, WILTON - UPG 3/4/2025 11 Corrective Maint OH Svc 80229366 WRTRN COMPLETE ACKLEY CEMETERY (40) 2/11/2025 11 Elect Annual Proj - DESG CT 80229431 COMPLETE 4/19/22 HIT & RUN 9A TURNO 11/26/2024 11 Dist Capital or Expense 80229662 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80229739 *SYS PROJ* CD02444 Pole Integrity R 9/4/2025 11 Dist Capital or Expense 80229746 1/7/25 BOOTH RD ROXBURY (POST CONST 1/31/2025 11 Elect Annual Proj - DESG CT 80229751 TURNOVER 1/08/25 BLACKVILLE( 1/31/2025 11 Elect Annual Proj - DESG CT 80229757 *** TURNOVER 1/7/25 WEST ST, SEYMO 2/7/2025 11 Elect Annual Proj - DESG CT 80229769 PRINT BJQ - 1/7 (CROWLCJ) 2018:POPP 2/28/2025 11 Dist Capital or Expense 80229776 *SYS PROJ* CD02444 Pole Integrity R 10/30/2025 11 Dist Capital or Expense 80229781 ROB OK TO APPROVE*ALL WORK COMPLETE 3/19/2025 11 Elect Annual Proj - DESG CT 80229797 *SYS PROJ* CD02444 Pole Integrity R 10/30/2025 11 Dist Capital or Expense 80229810 BJQ - 01/7 (Boisclair) 3460:MIKE:RD 1/30/2025 11 Dist Capital or Expense 80229971 CD02444 Pole Integrity Replacement 5/21/2025 11 Dist Capital or Expense 80230036 JTR, CD02136, Warrenville Rd, Mansf 11/25/2025 11 Dist Capital or Expense 80230052 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80230066 CD02444 Pole Integrity Replacement 5/14/2025 11 Dist Capital or Expense 80230068 *SYS PROJ* CD02444 Pole Integrity R 10/23/2025 11 Dist Capital or Expense 80230069 WRTN - DM - 1/7 9A HEBRON AVE GLAST 1/30/2025 11 Dist Capital or Expense 80230070 TL - SMITH AVE, #38 NIANTIC // REPL 5/20/2025 11 Dist Capital or Expense 80230071 CD02444 Pole Integrity Replacement 4/29/2025 11 Dist Capital or Expense 80230077 *SYS PROJ* CD02444 Pole Integrity R 8/5/2025 11 Dist Capital or Expense 80230090 *SYS PROJ* CD02444 Pole Integrity R 4/22/2025 11 Dist Capital or Expense 80230094 *D&D*CD02444 Pole Integrity Replace 7/30/2025 11 Elect Annual Proj - DESG CT 80230097 CD02444 Pole Integrity Replacement 4/28/2025 11 Dist Capital or Expense 80230101 CD02444 Pole Integrity Replacement 6/2/2025 11 Dist Capital or Expense 80230321 *SYS PROJ* CD02444 Pole Integrity R 7/8/2025 11 Dist Capital or Expense 80230330 *SYS PROJ* CD02444 Pole Integrity R 7/10/2025 11 Dist Capital or Expense 80230331 SMD - 1/7/25 ACME(139) DR -- 28060 2/28/2025 11 Dist Capital or Expense 80230356 MG-P#1431-INT-103267- CANTERBURY, W 2/4/2025 11 Elect Annual Proj - DESG CT 80230380 *SYS PROJ* CD02444 Pole Integrity R 4/14/2025 11 Dist Capital or Expense 80230386 WORK COMPLETED 776:LORDS:HWY:WESTON 1/9/2025 11 Elect Annual Proj - DESG CT 80230417 CD02444 Pole Integrity Replacement 4/23/2025 11 Dist Capital or Expense 80230422 CD02444 Pole Integrity Replacement 5/15/2025 11 Dist Capital or Expense 80230426 *SYS PROJ* CD02444 Pole Integrity R 4/9/2025 11 Dist Capital or Expense 80230429 *SYS PROJ* CD02444 Pole Integrity R 9/17/2025 11 Dist Capital or Expense 80230432 (BCW MATERIAL) *D&D*CD02444 Pole In 6/13/2025 11 Dist Capital or Expense 80230435 *SYS PROJ* CD02444 Pole Integrity R 4/9/2025 11 Dist Capital or Expense 80230441 *D&D*CD02444 Pole Integrity Replace 10/6/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 364310 Poles and Appurtenance (72) 8,177 3,982 3,238 5,779 4,352 178 4,334 955 8,655 2,760 52,915 2,896 59 130 2,190 2,269 2,190 14,526 6,877 1,149 78 6,650 9,686 (389) 207 83 2,350 616 4,129 1,143 5,923 1,363 5,497 10,957 2,001 5,892 36,247 117,480 3,474 654 6,377 3,448 5,572 8,800 6,924 2,697 1,982 3,708 1,502 544 2,279 2,131 4,154 594 4,545 516 5,440 12,680 1,371 153 833 4,915 5,031 175 455 7,244 5,939 9,639 5,587 5,262 1,055 5,610 1,671 715 4,832 8,672 11,624 756 3,342 35,252 5,629 3,542 5,898 2,711 307 2,548 4,709 2,797 3,154 4,710 3,416 5,656 4,472 7,986 1,680 10,348 1,784 5,939 6,269 1,161 8,782 7,119 1,004 1,207 365000 Overhead Conductors, Device (113) 2,615 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead (57) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 1,154 660 770 276 290 18 1,510 1,653 1,405 291 470 186 1,603 186 2,035 966 104 251 737 1,697 (326) 546 230 56 460 588 320 (39) 907 613 7,777 2,182 769 65,871 79,164 1,303 1,438 2,230 2,062 1,740 3,315 1,995 1,730 22 1,183 2,242 10,166 569 70 629 74 239 55 492 465 18 449 10,753 535 306 833 1,537 334 4,998 198 1,883 3,528 66,839 13,742 81 532 124 43 886 846 1,517 1,982 210 62 1,577 2,222 7,605 1,078 1,487 310 595 468 582 1,857 18,064 7,308 300 1,600 156,140 774 274 2,330 387 888 499 153 2,333 2,693 297 537 150 342 20 44 231 3,147 3,063 713 432 3,811 34 1,029 4,849 35 (159) 427 432 850 123 417 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total (243) 10,792 3,982 4,391 5,779 5,012 1,515 4,334 973 10,165 2,760 54,568 4,301 349 1,025 2,376 3,872 2,376 16,561 7,843 1,149 329 7,387 11,382 (753) 753 312 2,406 1,076 4,717 1,143 6,831 1,976 5,497 18,734 4,184 6,661 102,189 208,621 7,900 2,092 8,607 5,510 7,331 12,115 9,368 15,672 2,525 3,708 2,036 850 2,279 2,964 5,691 927 90,123 1,327 7,324 16,375 1,371 1,101 1,680 6,432 7,014 385 455 10,170 8,315 19,936 6,666 7,046 1,903 6,205 2,139 1,297 6,839 26,737 19,273 1,075 4,942 191,437 6,403 3,816 8,228 3,098 1,844 2,548 10,190 2,797 3,154 4,710 6,479 5,656 4,472 8,699 2,147 14,160 1,818 6,809 11,118 1,161 8,782 7,546 1,004 1,763
  4. Page 24 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 24 of 104 Work Order Number Description 80230444 *SYS PROJ* CD02444 Pole Integrity R 80230453 *SYS PROJ* CD02444 Pole Integrity R 80230459 (BCW MATERIAL) *D&D*CD02444 Pole In 80230464 *SYS PROJ* CD02444 Pole Integrity R 80230470 *SYS PROJ* CD02444 Pole Integrity R 80230474 *SYS PROJ* CD02444 Pole Integrity R 80230479 CD02444 Pole Integrity Replacement 80230484 (BCW MATERIAL) *D&D*CD02444 Pole In 80230567 HOLD FOR POLE EVW - 23 Union St, Wi 80230640 EVW - 107 Ashley Rd, Winsted P#4306 80230698 DJM: ARROWHEAD RD WESTPORT/ TREE VS 80230819 *HAWK* Frontier Pole Inspection Pol 80230843 MR; WORK W/ 8970283-COLUMBIA, ROUTE 80230872 MF Y-26318-2022 remove from pole 27 80230898 MF- 3 OR MORE 32P1 NORTH STONINGTON 80231257 *HAWK* Frontier Pole Inspection Pol 80231319 *HAWK* Frontier Pole Inspection Pol 80231417 LA TELCO NOT SET (E) W HTFD, 664 FE 80231477 *ASP* JA-Conv# 1205349-MakeReadyNon 80231485 *HAWK* Frontier Pole Inspection Pol 80232122 JS- Conv. 1243243 - Make Ready Non80232276 Alend ONe (FCOMP 04.28.23), HTFD, 4 80232313 CHANGEOVER BY AG TUE, 8/2 - 31 Gate 80232392 9A CAR VS POLE 4/23, Pole#1726 , Co 80232410 AldenOne -1024 BUCKLEY HIGHWAY, UNI 80232508 WQ; 4/25/22 PEACEABLE RIDGE ( 28 80232528 Jpt-106 North St Bristol Riser (Frn 80232731 DG P#238 DUGG HILL RD WOODSTOCK RPL 80233100 RM, 76 LYONS PLAIN RD WSTN OH TO UG 80233144 PRINTED--04/25 RED OAK ( 82) DR 80233236 * MJ AMM ELLIS ST,NEW BRITAIN. REP 80233728 CDOT 320-016 oh work Main St. Winds 80233856 SCHED 6/18 print 4/24 need VEG MGT 80234030 MI Abel - WEST GRANBY, FIRETOWN, 30 80234145 Priority Pole P#981 replace with 45 80234502 * (9A) 04.23.22 - 41 WASHINGTON ST, 80234555 Y-26521-2022 / BRICKYARD RD, FARMIN 80234718 *HAWK* Frontier Pole Inspection Pol 80234739 *HAWK* Frontier Pole Inspection Pol 80234752 MTL: JRP - 16 Fenn Rd NEWINGTON Ins 80234832 *HAWK* Frontier Pole Inspection Pol 80234846 *HAWK* Frontier Pole Inspection Pol 80235097 04/28 *TURNOVER* MANCHESTER ( 146) 80235111 YA; 59 GILLIAM LN, REPLACE TWO POL 80235217 *HAWK* Frontier Pole Inspection Pol 80235424 ASP-MCB - 1636 Highland Ave Waterbu 80236483 (PR) 5/9 MDB-REPLACE-OH-ANNUAL-DES 80236573 KTI 5/2/22 *9A - WHITLOCK ( 12) 80236617 install new pole, anchor, and 50kVA 80236788 *D&D*Convo# 1191486&1191478 Double 80236833 *D&D*Convo# 1200836&1200838 Double 80237049 5/02: 161 BOWERY RD, NEW CANAAN/ NE 80237068 CAR V POLE 80237078 MV - PAWCATUCK, RIVER, 186, I/R 40/ 80237082 MF 9A 5/2 RIVER ( 1170) RD -- 796 R 80237137 *D&D*Frontier Pole Inspection Pole 80237140 JLB 122 WEED ST NC OH TO UG P#689 P 80237155 Abel - GRANBY, PETERSEN, 108R, 80237171 *D&D*Frontier Pole Inspection Pole 80237411 Replace Priority Pole P#526 with 40 80237438 *D&D*Frontier Pole Inspection Pole 80237749 MV - NORTH STONINGTON, BOOM BRIDGE, 80237819 DONE ASPLUNDH PR 7/7 CP- 9A- W HI 80237888 *D&D*Convo# 1218969 Double Pole Sur 80237891 PD-74 WEST COIT ST N. LONDON/SHIFT 80237892 E.P.- REPLACE P-1081 & UPDATE FUSIN 80238037 6/22 MDB - KENT, ANDERSON, 127, Bri 80238375 DG P#2078 BOSTON TPKE EASTFORD FRNT 80238439 NEW GC 9A 5/4 TURNOVER PUMPKIN HILL 80238475 WESTBROOK, POND MEADOW, 248/SHIFT P 80238621 **POST CONSTRUCTION** 9A CAR VS PO 80238631 CC; INT-101929 BETHEL, SKY EDGE, 43 80238647 *SYS PROJ* CD02444 Pole Integrity R 80238656 *SYS PROJ* CD02444 Pole Integrity R 80238661 CD02444 Pole Integrity Replacement 80238664 1/9/25 TURNOVER RIDGE( 254) RD 80238666 JSG - 1/9 (McGRABJ) PROSPECT( 61) S 80238670 TURNOVER 1/9/25 E# 5572783 45 WELL 80238671 CD02444 Pole Integrity Replacement 80238685 CD02444 Pole Integrity Replacement 80238695 CD02444 Pole Integrity Replacement 80238701 *SYS PROJ* CD02444 Pole Integrity R 80238704 CD02444 Pole Integrity Replacement 80238743 MV STONINGTON, NEW LONDON, 240, I/R 80238754 MV 5/5 LINCOLN PARK RD PRESTON TURN 80238857 *HAWK* CD01570 - Leaning Pole Repla 80238860 *HAWK* CD01570 - Leaning Pole Repla 80238885 CD02444 Pole Integrity Replacement 80238890 CD02444 Pole Integrity Replacement 80238901 *SYS PROJ* CD02444 Pole Integrity R 80238904 CD02444 Pole Integrity Replacement 80238907 **ROW** WRTN--JK>PROJ CD02544, 2024 80238913 *SYS PROJ* CD02444 Pole Integrity R 80238920 500 HOPEWELL RD GLASTONBURY - POLE 80238921 CD02444 Pole Integrity Replacement 80238932 COVENTRY, CHENEY LN, 78, replace po 80238964 CD02444 Pole Integrity Replacement 80238977 **ROW** WRTN--JK>PROJ CD02544, 2024 80238999 LD- 470 SHERIDAN DR, CHESHIRE- (FRN 80239010 *SYS PROJ* CD02444 Pole Integrity R 80239028 *SYS PROJ* CD02444 Pole Integrity R 80239032 TL - SAPIA DR, #21 NIANITC // INT-1 80239034 CD02444 Pole Integrity Replacement 80239038 CD02444 Pole Integrity Replacement 80239041 JDB 124 LIMEKILN RD REDDING, 1842 in-service date work order type 4/9/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 6/6/2023 11 Elect Annual Proj - DESG CT 8/15/2022 11 Elect Annual Proj - DESG CT 7/18/2022 11 Elect Annual Proj - DESG CT 1/12/2023 11 Elect Annual Proj - DESG CT 4/13/2023 11 Elect Annual Proj - DESG CT 6/29/2022 11 Elect Annual Proj - DESG CT 6/3/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 10/19/2022 11 Elect Annual Proj - DESG CT 5/28/2024 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 10/19/2022 11 Elect Annual Proj - DESG CT 5/16/2023 11 Elect Project - DESG CT 5/5/2023 11 Damage Claims OH 9/9/2022 11 Asset Mgmt - Specific DESG CT 9/23/2022 11 Damage Claims OH 3/31/2023 11 Elect Annual Proj - DESG CT 6/30/2023 11 Elect Annual Proj - DESG CT 7/11/2023 11 Elect Annual Proj - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 6/12/2024 11 Asset Mgmt - Specific DESG CT 11/22/2022 11 Elect Annual Proj - DESG CT 4/27/2022 11 Dist Capital or Expense 7/16/2024 11 Asset Mgmt - Specific DESG CT 9/4/2024 11 Elect Annual Proj - DESG CT 12/9/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 10/31/2022 11 Damage Claims OH 5/6/2022 11 Elect Annual Proj - DESG CT 11/16/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 7/29/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 5/31/2023 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 11/18/2022 11 Elect Annual Proj - DESG CT 10/7/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 11/8/2022 11 Damage Claims OH 3/1/2023 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 6/3/2022 11 Damage Claims OH 7/3/2023 11 Elect Annual Proj - DESG CT 5/16/2022 11 Damage Claims OH 11/29/2022 11 Elect Annual Proj - DESG CT 11/29/2022 11 Elect Annual Proj - DESG CT 9/14/2023 11 Elect Annual Proj - DESG CT 11/29/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 2/16/2023 11 Elect Annual Proj - DESG CT 12/2/2022 11 Elect Annual Proj - DESG CT 10/3/2022 11 Damage Claims OH 8/10/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 5/10/2023 11 Elect Annual Proj - DESG CT 6/30/2022 11 Elect Annual Proj - DESG CT 1/16/2025 11 Dist Capital or Expense 5/22/2022 11 Damage Claims OH 10/21/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Damage Claims OH 3/5/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 1/22/2025 11 Elect Annual Proj - DESG CT 1/14/2025 11 Dist Capital or Expense 4/28/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Elect Annual Proj - DESG CT 5/15/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 12/22/2022 11 Elect Annual Proj - DESG CT 8/23/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 5/14/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 3/5/2025 11 Elect Annual Proj - DESG CT 5/14/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 4/30/2025 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 6/26/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 3/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 4,660 6,325 7,502 9,421 7,495 4,602 1,717 13,696 739 2,631 2,554 29 3,120 4,643 5,511 380 371 206 13,512 503 49 4,846 10,360 3,149 2,678 3,738 (53) 545 4,125 163 8,825 199,748 16,745 9,969 5,532 2,228 1,920 194 356 5,887 167 951 205 2,937 230 7,251 1,521 4,555 1,264 433 1,969 3,934 2,125 1,281 1,270 272 7,857 2,269 152 1,252 229 3,428 1,497 643 489 10,804 419 926 3,817 2,726 40,836 3,917 12,263 1,405 4,385 8,167 1,705 850 7,170 5,303 3,523 4,043 3,603 2,147 1,414 1,437 8,172 5,008 3,283 6,117 10,181 76,564 3,970 4,727 7,307 5,580 4,662 118,504 662 7,605 3,092 143 4,234 8,361 4,131 365000 Overhead Conductors, Device 1,867 2,769 2,563 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,577 800 253 199 2,941 1,457 242 1,829 3,427 3,773 217 368330 Equipment Overhead 87 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 24,035 206 216 115 35 15 234 278 1,812 568 (138) 5,801 1,674 20 1,362 2,914 1,478 804 1,813 4,357 759 6,252 425 3,962 14,535 1,571 763 (18) 30,407 541 187 145 83,115 1,266 1,733 478 1,131 46 56 56 7,885 316 48 316 1 459 50 143 145 100 106 4,952 294 364 441 1,906 434 2,825 17,054 2,992 764 16 41 100 897 715 110 158 520 457 1,604 108 2,319 559 508 233 955 188 915 232 1,139 746 639 64 496 424 1,670 526 39,918 1,590 5,228 726 2,594 168,279 76 790 1,527 1,267 594 2,463 446 373390 SL- Fixtures Overhead 173 1,691 395 187 (95) 3,973 4,717 1,088 6,268 228,357 1,186 4,488 2,936 465 104,071 655 822 5,635 562 3,593 6,404 709 618 14,214 201 343 1,015 77 1,060 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 105 192 3,934 9,552 79 370470 Meter Equipment 74 (0) 1,452 2,802 13,154 90 103 1,374 3,688 874 1,033 369720 DB/UG Conductors and Devices 799 58 378 713 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,613 9,095 12,642 10,221 10,764 6,258 1,960 15,525 4,271 6,596 2,771 29 8,679 31,697 18,870 471 474 1,730 17,200 1,377 2,789 6,188 22,002 3,228 3,245 3,925 (304) 34,926 10,649 1,438 15,239 512,952 17,932 16,066 8,468 2,739 105,990 905 1,234 19,723 777 4,861 6,610 4,104 898 21,465 1,722 4,898 2,567 510 3,323 3,934 2,489 1,927 11,120 272 14,856 23,839 152 1,272 1,632 7,339 3,689 1,447 2,302 15,271 1,793 7,698 4,242 8,292 55,371 5,596 13,026 1,405 4,385 10,486 2,264 1,358 7,404 6,258 3,523 4,231 3,603 3,622 1,646 3,000 8,918 5,647 3,283 7,787 10,706 116,482 3,970 6,317 12,535 7,105 7,256 286,783 739 8,395 4,618 1,846 4,828 10,824 4,578
  5. Page 25 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 25 of 104 Work Order Number Description 80239054 *SYS PROJ* CD02444 Pole Integrity R 80239057 CD02444 Pole Integrity Replacement 80239060 PRINT CRP-10 Dew Rd BK, new crossov 80239074 TL - SHORE DR, #107 LYME // UPGRADE 80239217 * JAM - 461 Alling St. Berlin - Rem 80239243 W 80239279 POST CONSTRUCTION - 9A CAR VS FRONT 80239290 *SYS PROJ* CD02444 Pole Integrity R 80239309 *SYS PROJ* CD02444 Pole Integrity R 80239343 (BCW MATERIAL) *D&D*CD02444 Pole In 80239351 *D&D*CD02444 Pole Integrity Replace 80239400 TL - ROGERS LAKE TRL, OLD LYME // S 80239577 *SYS PROJ* CD02444 Pole Integrity R 80239579 CD02444 Pole Integrity Replacement 80239581 *SYS PROJ* CD02444 Pole Integrity R 80239583 *D&D*CD02444 Pole Integrity Replace 80239604 WTG FOR 9A TO CLOSE 2/7/25 (TH) 9A 80239608 9A - CAR VS POLE 78 - APPROVED 3/7/ 80239636 JMS- 9A- WEST HARTFORD 66 SAMPSON S 80239638 9A, 1/12/25, RSO, JK>POLE 3839--CAR 80239648 EVW - 9A CAR VS POLE 1/11 - [MALLOD 80239674 POLE LINE RELOCATION - MERRYALL RD 80239796 *SYS PROJ* CD02444 Pole Integrity R 80239803 WO 19831549-INT-103150-DG UPGRADE F 80239841 *SYS PROJ* CD02444 Pole Integrity R 80239855 *POST CONSTRUCTION* 9A CAR VS POLE 80239899 *SYS PROJ* CD02444 Pole Integrity R 80239928 *D&D* Frontier Pole Inspection Pole 80239940 *D&D* Frontier Pole Inspection Pole 80239942 *SYS PROJ* CD02444 Pole Integrity R 80239948 9A - 166 WATERBURY RD, P 615-S, PRO 80239950 MDB - 01/7 ELLEN KAY:DR:WATERTOWN:C 80239965 *SYS PROJ* CD02444 Pole Integrity R 80239987 PRINT CRP-105 forest ave WIN, shift 80240012 *SYS PROJ* CD02444 Pole Integrity R 80240013 *SYS PROJ* CD02444 Pole Integrity R 80240023 *SYS PROJ* CD02444 Pole Integrity R 80240027 *SYS PROJ* CD02444 Pole Integrity R 80240064 CD02444 Pole Integrity Replacement 80240077 *SYS PROJ* CD02444 Pole Integrity R 80240096 (BCW MATERIAL) *D&D*CD02444 Pole In 80240098 *SYS PROJ* CD02444 Pole Integrity R 80240191 DONE 9A - 1/13 NORTH( 109) ST -- 21 80240254 JDB 134 FLORIDA HILL RD, RIDGEFIELD 80240524 EVW - (9A) MUSIC MOUNTAIN ( 55) R 80240552 WC-CHASE RIVER RD WATERBURY. RELOCA 80240590 DONE PRINT BJQ, GOSHEN, P-1377 (331 80240607 DONE PRINT CRP-75 Barbourtown Rd CT 80240613 *SYS PROJ* CD02444 Pole Integrity R 80240635 *SYS PROJ* CD02444 Pole Integrity R 80240636 *D&D*CD02444 Pole Integrity Replace 80240641 *SYS PROJ* CD02444 Pole Integrity R 80240646 DONE PRINT BJQ, LTCH, P #27 (401) E 80240647 *D&D* Frontier Inspection Pole Shif 80240661 MM 470 Green Hollow Rd Plainfield P 80240673 *SYS PROJ* CD02444 Pole Integrity R 80240676 (BCW MATERIAL) *D&D*CD02444 Pole In 80240753 JDB 15 BRENNER RD NORWALK,REPL P186 80240754 5/9/22 *9A* CLAPBOARD RIDGE ( 10 80240766 *D&D*Leaning pole 2330 Gildersleeve 80240783 Windham_Jordan Ln_Reliability Impro 80240791 *D&D* Leaning Pole 1871 Wright rd C 80240799 *D&D*Leaning pole 2086 Barbourtown 80240803 *D&D* RELIABILITY-IMPROVEMENT-OH-SP 80240966 *ASP* CD02444 Pole Integrity Replac 80240988 DG P#1035 32 NEW RD THOMPSON DIST G 80240992 *D&D* Frontier Pole Inspection Pole 80241000 PRINT EVW - 441 River Rd (Rte 7), S 80241030 MPB; 175 Quaker Farms Rd Southbury 80241035 *D&D*Frontier Pole Inspection Pole 80241041 *SYS PROJ* CD02444 Pole Integrity R 80241043 MM 654 ekonk hill rd Sterling pole 80241076 DONE-BJQ - 1/8 - DAMAGED XFRMR - PO 80241090 *D&D*CD02444 Pole Integrity Replace 80241105 zWETH--12/28/24--1298 Silas Deane H 80241132 RA CD01917-01 Reconductor River Rd, 80241144 ASP 8/17 CR-221B W MAIN ST. AVON, N 80241145 DJM. 5 IVY KNOLL WESTPORT. 400A SVC 80241167 WRITTEN NEEDS TO BE DONE 05/10 *TUR 80241195 PR 5/814N3 - Grantville Rd. Norfolk 80241203 NORWICH written -HARTFORD/TRUMBULL 80241240 Abel -556 Browns Rd, Mansfield, RPL 80241316 DG P#1408 1139 RT 171 WOODSTOCK FRN 80241479 *D&D* Frontier Inspection Pole Shif 80241495 CD01872 - CDOT L087-003 - Rubber Av 80241498 CD01872 - CDOT L087-003 - Rubber Av 80241513 15 DD BY 9/12/22 RR; SOUTHBURY, PUR 80241536 HEL KTI WM; NEW PRESTON, KINNEY HIL 80241803 *D&D* Frontier Pole Inspection Pole 80241831 *D&D* CD CD02449 Frontier Inspectio 80241838 JD; 98 WIND MILL CIR STAMFORD; SHIF 80241840 *ASP* CD02444 Pole Integrity Replac 80241841 PRINT EVW - 27 W Shore Pl, Salisbur 80241858 *SYS PROJ* CD02444 Pole Integrity R 80241859 AE/JD; 651 ROCK RIMMON RD; SHIFT 3P 80241884 MG-P#199-HANOVER- MAIN (451) ST-INS 80241951 LD- 912 STAFFORD AVE BRISTOL - P113 80241965 *D&D* Frontier Inspection Pole Shif 80241971 *SYS PROJ* CD02444 Pole Integrity R 80242005 *D&D Frontier Inspection Pole Shift 80242006 D/W 19843730: JRP - 310 W Queen St 80242009 *ASP* CD02444 Pole Integrity Replac 80242023 AC/MPB-81 CHRISTIAN ST OXFORD-RELOC 80242025 TL - TOWN WOODS RD, #16 OLD LYME // 80242027 CD02444 Pole Integrity Replacement in-service date work order type 12/9/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 8/4/2022 11 Elect Annual Proj - DESG CT 8/16/2023 11 Asset Mgmt - Specific DESG CT 5/15/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 8/18/2022 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 2/14/2025 11 Damage Claims OH 4/4/2025 11 Damage Claims OH 1/31/2025 11 Dist Capital or Expense 2/3/2025 11 Dist Capital or Expense 6/4/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 2/12/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 7/22/2025 11 Damage Claims OH 2/14/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 1/30/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 1/14/2025 11 Dist Capital or Expense 1/14/2025 11 Elect Annual Proj - DESG CT 5/19/2022 11 Damage Claims OH 7/28/2022 11 Corrective Maint OH Svc 1/24/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/24/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 10/29/2025 11 Dist Capital or Expense 4/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 3/23/2023 11 Asset Mgmt - Specific DESG CT 6/10/2022 11 Damage Claims OH 9/16/2022 11 Asset Mgmt - Specific DESG CT 5/11/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Asset Mgmt - Specific DESG CT 9/16/2022 11 Asset Mgmt - Specific DESG CT 2/15/2023 11 Asset Mgmt - Specific DESG CT 6/3/2025 11 Dist Capital or Expense 1/28/2025 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 10/29/2025 11 Corrective Maint UG Svc 4/22/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 1/15/2025 11 Elect Annual Proj - DESG CT 1/15/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 3/27/2025 11 Private Work - No Co Asset 12/16/2022 11 Asset Mgmt - Specific DESG CT 9/8/2022 11 Elect Annual Proj - DESG CT 2/6/2023 11 Asset Mgmt - Specific DESG CT 7/25/2022 11 Elect Annual Proj - DESG CT 5/9/2023 11 Elect Annual Proj - DESG CT 7/25/2022 11 Elect Annual Proj - DESG CT 3/1/2023 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 10/24/2024 11 Dist Capital or Expense 10/24/2024 11 Asset Mgmt - Specific DESG CT 8/29/2022 11 Elect Annual Proj - DESG CT 9/8/2023 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 7/1/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 3/5/2025 11 Corrective Maint OH Svc 5/29/2025 11 Temporary Work DESG CT 5/14/2025 11 Dist Capital or Expense Subsequent Close Date 4/20/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 3/23/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 364310 Poles and Appurtenance 12,686 5,399 1,650 3,740 13,853 7,100 55 3,707 7,057 4,546 4,483 3,103 4,714 3,429 2,544 3,858 7,423 15,970 5,286 11,135 1,146 1,524 4,021 3,141 4,523 4,903 7,925 3,558 919 11,746 5,029 1,893 6,607 829 6,995 13,394 12,703 7,194 7,637 6,926 6,167 5,937 1,890 1,136 1,481 (124) 240 62 6,006 4,288 9,089 9,784 842 2,699 7,068 2,750 5,992 2,759 2,055 4,184 2,180 3,951 6,883 3,775 2,231 (141) 1,482 2,405 7,421 86 9,633 1,260 65 6,180 295 106,442 3,865 2,675 3,791 67,624 8 2,852 474 882 9,197 287,862 772 5,936 190 83 519 9,219 2,012 1,236 2,390 1,713 3,619 632 3,972 330 957 2,456 32,011 2,058 5,106 365000 Overhead Conductors, Device 6,488 2,082 1,676 507 1,787 888 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 1,904 368330 Equipment Overhead 437 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 5,507 29,011 36 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 594 33 1,301 185 1,629 1,725 9,691 2,137 555 1,253 43 241 992 439 7,874 2,392 2,736 5,292 165 8,155 737 1,070 776 989 4,810 97 746 265 44 420 365 927 2,247 2,949 2,943 979 142 850 3,689 536 804 4,146 2,180 261 32 3,281 (508) 143 1,872 637 3,696 2,256 266 1,292 (298) 293 825 114 240 6,251 444 713 1,375 733 681 13,394 1,416 2,674 (267) 2,545 669 1,504 631 2,372 174 140 820 373 112,018 3,845 1,160 54 75,472 536 1,682 591 537 (20) 91 2,078 336 121 74 331 18,837 34 617 102 603 1,453 315 387 778 344 34,865 457,698 1,084 120 384 419 9,210 2,520 1,600 230 1,733 1,096 5,283 414 1,426 34 1,646 (47) 201 1,319 751 128 6,628 189 763 103 47 456 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 21,514 7,481 9,427 4,465 47,618 7,988 55 5,432 16,748 6,683 5,038 4,399 4,714 3,670 3,536 4,297 16,044 18,362 8,022 16,692 1,311 9,679 4,757 4,255 5,298 4,903 9,335 8,733 1,017 11,746 5,029 2,821 8,854 3,920 9,938 14,373 13,553 10,883 8,173 7,730 14,008 10,373 2,152 1,168 6,320 (930) 383 1,935 6,643 4,581 9,089 11,053 956 2,940 13,319 2,750 6,706 4,671 4,470 4,865 15,574 5,958 10,094 3,775 2,231 (427) 4,027 3,501 8,925 717 14,204 1,434 280 7,000 804 220,012 28,000 4,150 3,846 143,483 8 4,014 474 1,226 44,481 754,770 4,376 7,657 190 313 2,252 9,219 8,805 1,236 3,816 3,393 3,571 833 5,290 1,082 1,188 2,456 38,686 2,703 5,869
  6. Page 26 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 26 of 104 Work Order Number Description 80242036 73 - 87 MILLER RD., S. WINDSOR - NE 80242040 *SYS PROJ* CD02444 Pole Integrity R 80242042 CD02444 Pole Integrity Replacement 80242110 MM 69 Franklin Dr Brklyn P#1341 rep 80242268 *****ALL WORK COMPLETE*****1/7/25-80242274 CD02444 Pole Integrity Replacement 80242289 *SYS PROJ* CD02444 Pole Integrity R 80242292 P8605 red badge Colman St, New Lond 80242312 *SYS PROJ* CD02444 Pole Integrity R 80242321 *D&D*CD02444 Pole Integrity Replace 80242322 *D&D* Frontier Inspection Pole Shif 80242346 *SYS PROJ* CD02444 Pole Integrity R 80242347 JTR,919 BURNSIDE AVE, EAST HARTFOR 80242352 *D&D Frontier Inspection Pole Shift 80242432 Priority Pole P#1840 replace with 4 80242453 SC-P#3754 HUNTINGTON DR PLAINFIELD 80242523 *D&D* Frontier Pole Inspection Pole 80242545 *D&D*Frontier Pole Inspection Pole 80242551 *D&D* JS - Conv. 1701920 - Make Rea 80242554 *D&D* JS - Conv. 1701920 - Make Rea 80242555 *D&D* JS - Conv. 1701920 - Make Rea 80242558 *D&D*CD02444 Pole Integrity Replace 80242601 CD02444 Pole Integrity Replacement 80242603 CD02444 Pole Integrity Replacement 80242704 MG-P#2609/P#3523-KILLINGLY, NORTH ( 80242974 MRP - New Load - 21P Reconfiguratio 80242986 APPRENTICES MPB; 578 BERKSHIRE RD, 80243001 *SYS PROJ* CD02444 Pole Integrity R 80243004 Jpt-186 Terryville Rd Bristol (Frnt 80243053 *ASP* CD02444 Pole Integrity Replac 80243060 *SYS PROJ* CD02444 Pole Integrity R 80243367 *SYS PROJ* CD02444 Pole Integrity R 80243372 (BCW MATERIAL) *D&D*CD02444 Pole In 80243378 *ASP* CD02444 Pole Integrity Replac 80243418 *SYS PROJ* CD02444 Pole Integrity R 80243429 (BCW MATERIAL) *D&D*CD02444 Pole In 80243430 *SYS PROJ* CD02444 Pole Integrity R 80243439 *SYS PROJ* CD02444 Pole Integrity R 80243445 *SYS PROJ* CD02444 Pole Integrity R 80243468 1/16 - RSO - [PLOURJG]: MARLBOROUGH 80243472 *SYS PROJ* CD02444 Pole Integrity R 80243480 *SYS PROJ* CD02444 Pole Integrity R 80243487 CD02444 Pole Integrity Replacement 80243504 CD02444 Pole Integrity Replacement 80243508 *SYS PROJ* CD02444 Pole Integrity R 80243514 *SYS PROJ* CD02444 Pole Integrity R 80243517 REWRITE-*SYS PROJ* CD02444 Pole Int 80243518 Appr Grp - WATERFALL RD 120, ASHFOR 80243525 CD02444 Pole Integrity Replacement 80243528 AE/RL:21 HUNT TER: GRN VERIZON TO R 80243545 (BCW MATERIAL) *D&D*CD02444 Pole In 80243551 *D&D* Frontier Inspection Pole Shif 80243558 *SYS PROJ* CD02444 Pole Integrity R 80243601 Jpt-Robert Jackson Way - Buck Fever 80243602 ALL WORK FIEld COMPLETED- NEed town 80243669 TW - CD01225 (AIMS Seg 02, Part 1 o 80243774 *SYS PROJ* CD02444 Pole Integrity R 80243801 (BCW MATERIAL) *D&D*CD02444 Pole In 80243806 *SYS PROJ* CD02444 Pole Integrity R 80243819 *SYS PROJ* CD02444 Pole Integrity R 80243822 *SYS PROJ* CD02444 Pole Integrity R 80243823 CD02444 Pole Integrity Replacement 80243832 ESSEX, N MAIN ST/SHIFT TO FTR POLES 80243931 MAR - 200amp Upgrade,Upgrd Xfmr - 6 80243993 PD-33 GOSHEN RD WTFD/INSTALL NEW ST 80244035 *D&D* Frontier Pole Inspection Pole 80244046 DJM. 5 REBEL RD WESTPORT. NEW 200A 80244060 *SYS PROJ* CD02444 Pole Integrity R 80244075 *D&D*CD02444 Pole Integrity Replace 80244080 CD02444 Pole Integrity Replacement 80244112 *SYS PROJ* CD02444 Pole Integrity R 80244118 JMS- WEST HARTFORD, 1700 ASYLUM AVE 80244124 (BCW MATERIAL) *D&D*CD02444 Pole In 80244147 CD02444 Pole Integrity Replacement 80244159 (BCW MATERIAL) *D&D*CD02444 Pole In 80244166 *SYS PROJ* CD02444 Pole Integrity R 80244176 *SYS PROJ* CD02444 Pole Integrity R 80244185 CHESTER, OLD COUNTY RD//RPL XARMS P 80244187 *SYS PROJ* CD02444 Pole Integrity R 80244229 (BCW MATERIAL) *D&D*CD02444 Pole In 80244231 DONE PRINT BJQ, LTCH, P #164 (85) W 80244237 *ASP* CD02444 Pole Integrity Replac 80244262 *EH AWC* CD02444 Pole Integrity Rep 80244275 *ASP* CD02444 Pole Integrity Replac 80244294 *SYS PROJ* CD02444 Pole Integrity R 80244301 *EH AWC* CD02444 Pole Integrity Rep 80244322 Appr Grp - Waterfall Rd 224, Ashfor 80244325 *EH AWC* CD02444 Pole Integrity Rep 80244343 *EH AWC* CD02444 Pole Integrity Rep 80244347 *SYS PROJ* CD02444 Pole Integrity R 80244352 *EH AWC* CD02444 Pole Integrity Rep 80244356 *SYS PROJ* CD02444 Pole Integrity R 80244358 *EH AWC* CD02444 Pole Integrity Rep 80244373 JMS- BLOOMFIELD, 1404 BLUE HILLS AV 80244443 9A car vs pole - APPROVED 3/6/2026 80244447 *ASP* BC - Conv. 1777020 - Make Rea 80244451 LD- 9A- 624 MULBERRY ST, PLNTVILLE80244461 9A CAR VS POLE - APPROVED 2/22 80244463 9A, RSO, JK>POLE 2101--CAR V ESE P 80244469 LD- 9A-81 CHURCH AVE, BRISTOL - P93 80244477 1.17.25 100 STILL RIVER RD, NEW MIL 80244479 9A - CAR VS POLE 2185 - APPROVED 4/ 80244491 1/19/25, RSO/AWC, JK>POLE 2672--REP 80244498 CAR VS POLE - FOIA SENT 5/1/26: FOI 80244502 ZK - BLOOMFIELD (9a) - 2729 TERRY P in-service date work order type 9/8/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 9/1/2022 11 Elect Annual Proj - DESG CT 2/11/2025 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/23/2025 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 1/21/2025 11 Damage Claims OH 3/11/2025 11 Dist Capital or Expense 8/18/2022 11 Elect Annual Proj - DESG CT 9/13/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 5/2/2025 11 Corrective Maint OH Svc 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/25/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 2/24/2025 11 Damage Claims OH 4/22/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/24/2025 11 Elect Annual Proj - DESG CT 5/21/2025 11 Dist Capital or Expense 3/26/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/28/2023 11 Elect Annual Proj - DESG CT 2/20/2024 11 Asset Mgmt - Specific DESG CT 11/4/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 6/9/2025 11 Elect Annual Proj - DESG CT 5/31/2022 11 Elect Annual Proj - DESG CT 8/1/2022 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/24/2025 11 Temporary Work DESG CT 4/22/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 5/15/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/12/2025 11 Elect Annual Proj - DESG CT 5/30/2025 11 Elect Annual Proj - DESG CT 4/21/2025 11 Damage Claims OH 4/25/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 4/2/2025 11 Damage Claims OH 2/6/2025 11 Damage Claims OH 1/24/2025 11 Damage Claims OH 1/31/2025 11 Elect Annual Proj - DESG CT 3/25/2025 11 Damage Claims OH 2/7/2025 11 Dist Capital or Expense 2/12/2025 11 Damage Claims OH 1/31/2025 11 Damage Claims OH Subsequent Close Date 2/13/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 2/13/2026 5/15/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 7/17/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 3/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/14/2026 2/13/2026 7/17/2026 2/14/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 6/26/2026 2/13/2026 6/26/2026 1/22/2026 364310 Poles and Appurtenance 231 4,044 7,046 1,742 826 3,085 4,629 14,614 4,490 5,461 852 11,327 7,269 222 3,161 712 2,250 285 77 808 412 1,729 4,450 6,011 2,709 34,685 755 3,792 2,646 1,977 7,444 6,185 5,916 6,811 3,280 5,191 7,403 2,800 1,141 18,688 1,143 14,391 10,774 3,121 3,673 9,330 4,556 754 2,728 1,117 6,001 1,352 7,824 658 8,637 67,615 8,270 12,841 4,393 6,488 6,679 8,640 5,726 1,760 1,826 75 4,747 2,273 6,133 3,562 5,495 389 4,542 7,508 4,913 16,698 5,219 983 4,437 4,553 204 4,575 6,422 4,826 4,329 2,892 3,241 3,860 3,105 6,376 4,582 5,266 3,805 8,211 11,651 515 14,881 5,825 6,704 11,523 9,048 7,086 5,384 1,112 4,836 365000 Overhead Conductors, Device 527 1,665 2,657 863 1,134 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,553 368330 Equipment Overhead 72 49 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 6,304 288 2,672 453 886 1,597 229 869 850 2,852 388 254 92 35 265 48 519 2,175 453 172 35,523 478 249 82 397 50 585 1,493 2,768 933 1,095 2,969 1,803 4,494 108 410 934 4,286 328 1,388 1,765 406 1,356 229 2,725 658 997 59,741 4,033 1,243 803 1,969 386 683 63 314 1,786 299 77 122 658 1,423 427 335 237 209 73 989 850 170 720 1,069 778 7,854 3,025 158 1,232 12 53 1,676 78 629 1,397 168 1,552 335 2,564 1,866 579 1,421 214 3,983 582 551 2,811 210 498 407 100 800 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 9,686 5,709 9,703 2,942 1,959 3,085 4,629 17,286 4,944 6,347 2,449 12,033 8,138 1,321 6,013 1,182 2,505 378 112 1,520 460 2,248 6,625 6,465 3,465 71,700 755 3,792 6,347 1,977 8,539 9,154 5,916 6,811 3,280 7,102 11,897 2,800 1,141 19,099 1,143 15,326 15,389 3,121 3,673 10,718 4,556 2,896 2,728 3,308 7,733 1,581 10,670 1,975 11,056 127,356 12,303 14,084 4,393 6,488 7,482 11,036 6,112 3,014 1,826 283 6,052 2,273 6,133 4,551 6,345 624 5,262 8,578 5,691 24,552 8,244 1,142 4,437 6,229 282 4,575 6,422 5,456 4,329 4,289 3,409 5,412 3,441 8,940 6,449 5,846 3,805 10,533 11,865 515 18,864 6,407 7,255 11,523 11,859 7,296 5,882 1,112 5,243
  7. Page 27 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 27 of 104 Work Order Number Description 80244503 TURNOVER-M 9A 2038 Glasgo Rd Griswo 80244510 P-1985 REPLACE PRIORITY REJECT WITH 80244512 P-1632 REPLACE PRIORITY REJECT WITH 80244553 LD- PR ORD- 9A - 1108 NEW HAVEN RD, 80244554 *EH AWC* CD02444 Pole Integrity Rep 80244562 DONE PRINT BJQ, LTCH, P #1187 & 119 80244564 WRTN - DM - 1/19 BUTTONBALL (436) L 80244566 *SYS PROJ* CD02444 Pole Integrity R 80244567 RM, 10 SINGING WOODS RD - NORWALK, 80244571 CRP - DONE 9A 1/19 WHITBECK(160) RD 80244583 *SYS PROJ* CD02444 Pole Integrity R 80244619 POST CONSTRUCTION WTG FOR PD RPT 2/ 80244682 *EH AWC* CD02444 Pole Integrity Rep 80244721 *SYS PROJ* CD02444 Pole Integrity R 80244726 *SYS PROJ* CD02444 Pole Integrity R 80244734 MG-P#530-CHERRY HILL( 168) RD -BROO 80244735 9A EVENT 5577004 1.19.25 - 375 WILL 80244747 *SYS PROJ* CD02444 Pole Integrity R 80244762 PRINT EVW - 25 Mt. Riga Rd, Salisbu 80244766 *SYS PROJ* CD02444 Pole Integrity R 80244769 *SYS PROJ* CD02444 Pole Integrity R 80244967 DG P#1702 QUINEBAUG RD THOMPSON CLP 80244991 DONE EVW - 31 Robin Hill Ln, Salisb 80245008 MR; ***NEED EARLY POLE SET- 45/2*** 80245028 PR 6/9 JFC - 9A TURNOVER) 503 NEW 80245033 *D&D*Conv#1253385-MakeReadyNonReimb 80245073 MG-P#343-N BEAR HILL( 120) RD- CHAP 80245079 *SYS PROJ* CD02444 Pole Integrity R 80245084 CAR VS POLE- NO PR FOUND: NON-BILLA 80245113 PRINT JSG/Harwinton--Bogue Rd. 491 80245127 PRINT JSG/Torrington-Bogue Rd.1089 80245138 *EH AWC* CD02444 Pole Integrity Rep 80245173 CRP - 9A)TURNOVER MAIN ( 377) S 80245307 JDB 89 WILLIAM ST NORWALK,REPL 1423 80245384 SOMERS, PINE KNOB, 67, Matthew Burz 80245395 (MJ Dock Work)15 DAY DUE 11/1 - 120 80245509 *ASP* CD02444 Pole Integrity Replac 80245528 *SYS PROJ* CD02444 Pole Integrity R 80245552 *SYS PROJ* CD02444 Pole Integrity 4 80245560 *SYS PROJ* CD02444 Pole Integrity 4 80245562 *D&D*CD02444 Pole Integrity Replace 80245595 *ASP* CD02444 Pole Integrity Replac 80245602 *ASP* CD02444 Pole Integrity Replac 80245608 *SYS PROJ* CD02444 Pole Integrity R 80245611 *SYS PROJ* CD02444 Pole Integrity R 80245614 *ASP* CD02444 Pole Integrity Replac 80245692 CAR VS POLE- APPROVED 2/20/26 80245704 *SYS PROJ* CD02444 Pole Integrity 5 80245732 *SYS PROJ* CD02444 Pole Integrity R 80245746 JDB 14 APPLETREE LN NORWALK, 5715 E 80245762 *SYS PROJ* CD02444 Pole Integrity 5 80245787 *Do with WO#8817147* MAR - 3ph Prim 80245947 *ASP* CD02444 Pole Integrity 5788 W 80245969 *SYS PROJ* CD02444 Pole Integrity 80245974 DG P#986 LOT 5 BALLARD RD THOMPSON 80245981 *SYS PROJ* CD02444 Pole Integrity 6 80245995 *SYS PROJ* CD02444 Pole Integrity 6 80246008 MAR - 4 Hazel Ave, Naugatuck CT // 80246014 *SYS PROJ* CD02444 Pole Integrity R 80246019 MM - 11 GRUMMAN HILL RD, WILTON - 3 80246030 *SYS PROJ* CD02444 Pole Integrity 6 80246159 TL - GRASSY HILL RD, #101 OLD LYME 80246192 DG P#119 21 CENTER ST PUTNAM CLP TO 80246225 MJG 05-17-22 9A EVENT 4754431 pole 80246276 DONE appt 6/28 EVW - 98 S Canaan Rd 80246278 *ASP*CD02444 Pole Integrity 6870 Wa 80246287 *SYS PROJ* CD02444 Pole Integrity 6 80246302 9A - LD - 1016 FLANDERS RD, SOUTHIN 80246304 *SYS PROJ* CD02444 Pole Integrity 7 80246311 *SYS PROJ* CD02444 Pole Integrity 7 80246323 *SYS PROJ* CD02444 Pole Integrity 7 80246336 *SYS PROJ* CD02444 Pole Integrity 7 80246350 *SYS PROJ* CD02444 Pole Integrity 7 80246363 *SYS PROJ* CD02444 Pole Integrity R 80246366 *SYS PROJ* CD02444 Pole Integrity 8 80246479 *SYS PROJ* CD02444 Pole Integrity R 80246483 CD02444 Pole Integrity Replacement 80246487 *SYS PROJ* CD02444 Pole Integrity R 80246547 TL - SALEM RD, #28 LYME // INST TEM 80246569 POST CONSTR Quarry Rd., 1 section i 80246603 5/15 9A (13) ORCUTTVILLE RD, STAFF 80246701 *SYS PROJ* CD02444 Pole Integrity R 80246719 *SYS PROJ* CD02444 Pole Integrity R 80246737 CD02444 Pole Integrity Replacement 80246738 *SYS PROJ* CD02444 Pole Integrity R 80246771 TO STORES-2/21/25-MG-P#642- TOLERAT 80246782 LD- 147 SCOTT RD, PROSPECT-9A (no i 80247050 DONE PRINT BJQ, BETH, P#B55 (275) W 80247086 MATERIAL -15D 4/3 JFM-21 RIVERVIEW 80247148 *EH AWC* CD02444 Pole Integrity Rep 80247170 MADISON - REM OH / INST RISER SVC , 80247316 SC-94 BROWN RD VOLUNTOWN I-40/2 ,25 80247357 15 DAY DUE 11/28/22; JV; 2 pic COLC 80247360 9A - CAR VS POLE 80247373 MCB -. 5/13 (9A) HUNTINGDON ( 237) 80247412 JFC - (9A) 837 CHARLES ST TORRIN 80247455 CD02444 Pole Integrity Replacement 80247457 MM - INT-102985 - 21 THUNDER LAKE R 80247486 COWLES / BUSSE RD, WILLINGTON - FU 80247516 *SYS PROJ* CD02444 Pole Integrity R 80247529 *SYS PROJ* CD02444 Pole Integrity R 80247539 *SYS PROJ* CD02444 Pole Integrity R 80247578 E.P.- 66 LIBRARY ST, GROTON, CT-P. 80247756 JDB CDOT 102-366 W. CEDAR ST NORWAL 80247763 9A-1/23-RSO-[CHANND]-W MAIN( 4 in-service date work order type 1/23/2025 11 Damage Claims OH 6/2/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 2/6/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 1/24/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 1/21/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 2/10/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 1/27/2025 11 Damage Claims OH 2/26/2025 11 Damage Claims OH 7/7/2025 11 Dist Capital or Expense 5/28/2025 11 Corrective Maint OH Svc 9/25/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/16/2022 11 Damage Claims OH 10/31/2022 11 Asset Mgmt - Specific DESG CT 5/24/2023 11 Elect Annual Proj - DESG CT 6/21/2022 11 Damage Claims OH 6/27/2023 11 Elect Project - DESG CT 5/27/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 2/3/2025 11 Damage Claims OH 4/23/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Elect Annual Proj - DESG CT 5/20/2025 11 Dist Capital or Expense 5/19/2022 11 Damage Claims OH 6/21/2022 11 Elect Annual Proj - DESG CT 1/27/2023 11 Elect Annual Proj - DESG CT 11/17/2022 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 8/19/2025 11 Elect Annual Proj - DESG CT 8/5/2025 11 Dist Capital or Expense 10/13/2022 11 Elect Annual Proj - DESG CT 8/19/2025 11 Elect Annual Proj - DESG CT 6/27/2022 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 11/1/2022 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 6/11/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Elect Annual Proj - DESG CT 11/17/2025 11 Dist Capital or Expense 6/16/2022 11 Elect Annual Proj - DESG CT 7/21/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Damage Claims OH 8/16/2023 11 Elect Annual Proj - DESG CT 7/14/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 2/28/2025 11 Damage Claims OH 8/19/2025 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 8/18/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/30/2022 11 Temporary Work DESG CT 6/15/2022 11 Damage Claims OH 5/24/2022 11 Damage Claims OH 8/5/2025 11 Dist Capital or Expense 7/10/2025 11 Elect Annual Proj - DESG CT 5/21/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 2/12/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 3/27/2025 11 Corrective Maint UG Svc 8/2/2022 11 Elect Annual Proj - DESG CT 11/21/2022 11 Elect Annual Proj - DESG CT 12/7/2022 11 Damage Claims OH 3/15/2023 11 Damage Claims OH 7/14/2022 11 Damage Claims OH 5/15/2025 11 Dist Capital or Expense 3/13/2025 11 Elect Annual Proj - DESG CT 10/6/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 8/1/2022 11 Elect Annual Proj - DESG CT 9/8/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 8/26/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 5/15/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 9,309 2,349 4,567 1,253 6,987 2,068 6,056 2,389 70 10,665 5,062 14,873 1,601 4,951 6,504 6,743 8,823 5,026 1,296 8,310 2,509 9,231 13,194 2,059 691 (377) 1,475 7,190 1,259 3,793 835 2,496 11,504 3,259 26,682 7,518 4,362 4,036 3,332 5,661 3,271 4,845 5,651 3,944 3,795 6,236 16,704 9,110 3,870 434 4,967 16,087 6,522 3,408 371 9,344 5,984 1,367 4,410 56,791 4,571 4,319 14,395 1,255 1,845 2,261 7,396 16,455 4,390 4,756 4,052 4,971 4,830 3,859 5,725 4,618 5,964 3,288 333 7,532 455 3,039 10,921 5,388 13,162 3,299 1,520 599 9,063 5,250 412 7,569 1,829 720 2,937 1,630 3,197 3,990 1,787 5,355 6,058 6,501 138 4,793 7,098 365000 Overhead Conductors, Device 2,816 1,574 78 3,485 835 210 654 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 166 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 359 2,031 1,144 1,483 633 10,608 3,348 864 2,924 190 1,903 401 7,570 441 960 3,795 6,397 159 86 68 3,254 6,003 2,670 77 (377) 1,379 2,473 1,273 369 90 231 154 444 1,712 83 2,614 (377) 97 214 130 2,544 1,149 24,040 12,150 1,739 995 424 201 659 1,320 771 900 626 1,802 1,860 2,782 1,464 1,954 1,972 17,429 220 (19) 1,279 1,487 1,738 1,634 1,010 1,801 122,594 609 118 1,073 834 112 1,119 739 242 333 9,733 163 2,365 1,397 4,615 247 491 2,459 3,733 2,139 4,399 779 2,300 26 1,605 166 18 (2) 8,161 1,224 1,790 272 745 163 4,732 10,498 273 47 189 422 1,141 3,075 167 1,823 350 210 1,536 3,108 974 698 2,041 8,508 369 5 1,151 544 350 106 77 1,214 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 12,292 3,923 4,645 4,738 8,180 2,278 8,740 2,389 2,615 12,148 5,695 35,673 1,601 8,299 7,369 9,826 9,013 7,014 1,996 15,880 2,509 12,639 21,352 7,426 768 (1,132) 3,165 9,663 2,663 4,162 925 2,496 14,249 4,408 50,722 21,647 6,101 5,031 3,755 5,661 3,271 5,615 6,552 4,569 3,795 8,038 18,564 11,891 5,334 4,580 4,967 34,106 6,522 4,686 3,049 11,082 7,618 3,950 6,323 180,747 4,571 4,652 25,525 1,417 4,701 2,261 7,396 21,318 4,390 7,215 7,784 7,110 9,229 3,859 6,504 4,618 8,264 3,288 378 9,135 622 3,039 29,580 6,886 14,952 3,570 2,265 762 14,030 5,672 1,553 12,164 2,896 2,542 3,288 1,840 3,197 5,632 4,896 5,355 6,058 7,475 913 8,049 15,607
  8. Page 28 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 28 of 104 Work Order Number Description 80247764 9A CAR VS POLE- APPROVED 10/9 80247768 *WTBY AWC*SD - MIDDLEBURY, PORTER, 80247822 9A - CAR VS FRONTIER POLE #149 - AP 80247937 KTI SD; 2022 PCB OH XFMR REPLACE P. 80248101 15D 8/12 MAR - 318 Maple Hill Rd, N 80248153 *SYS PROJ* CD02444 Pole Integrity R 80248167 *SYS PROJ* CD02444 Pole Integrity R 80248170 MG-BROOKLYN, ALLEN HILL(253)- OH LI 80248206 Asplundh - SOMERS, NINTH DISTRICT, 80248323 SC: 1120 WESTOVER RD, STAM - POLE S 80248333 TL - LYME ST, #74 OLD LYME // INST 80248337 CD02444 Pole Integrity Replacement 80248357 *ASP* CD02444 Pole Integrity Replac 80248360 AP- 1600 New Britain Ave, Farmingto 80248371 PRINT EVW - 53 Jewett Hill Rd, Shar 80248375 MADISON - SCOTLAND AVE (92) - INST 80248383 *SYS PROJ* CD02444 Pole Integrity R 80248392 DG P#3057 THOMPSON HILL RD THOMPSON 80248409 *SYS PROJ* CD02444 Pole Integrity R 80248423 *SYS PROJ* CD02444 Pole Integrity R 80248599 ok to close9A-01/26-RSO-[KINNEY]-St 80248623 TL - CHESTERFIELD RD, EAST LYME // 80248638 NEW-JD-10/11/24--NORTH STONINGTON, 80248644 DMD- 69 MARLB. ST (12 PERRY AVE) 80248660 STONINGTON, MAIN, 381, Manor House 80248662 9A - CAR VS. FRONTIER POLE #539 - A 80248702 9A CAR VS POLE - APPROVED 10/9 80248724 NS AE/TC 148 E ELM ST, GRN: P#67955 80248736 LD - 9A - (FRNT) P782 - POST CONST80248792 TL - BEAVER BROOK RD, #277 LYME // 80248798 SC: 15 WINDSOR LN GRN, REPLACE ROTT 80248802 AMM-143 Olive st MER (Frnt)P1528 80248804 RC REPLACE 2 FTR POLES PEPPERIDGE R 80248806 MPB; 343 SPRING HILL RD, MONROE (LO 80248852 15DD 2/19 PM-925 DEMING RD BERLIN-O 80248853 Apprentice Group, AC-8 CALUMET RD, 80248860 *D&D* FA - Conv. 1657220 - Make Rea 80248879 MM Prospect St Plainfield Poles #29 80248945 Old Post Rd, Tolland. Reconductor P 80248957 WRTN - DM - 01/07/25 South Main St 80249005 *ASP* EA-Conv#1709131-MakeReadyNonR 80249064 NEW GC OAKDALE, FIRE, 631, Kyle Cha 80249086 5/21 P#5434 ROSEMONT ST, HARTFORD 80249111 DG P#148 630 RT 171 WOODSTOCK CLP P 80249144 DG P#673 THOMPSON HILL RD THOMPSON 80249172 5/30 ASPLUNDH MDB - KENT, RICHARDS 80249246 BRANFORD, PLEASANT POINT, 230/New F 80249348 JTR, 450 Lovely St, Avon - Shift Re 80249405 APPT 2/10 JFM-17 BECKWITH DR (P#195 80249457 TL - HICKORY ST, LYME // SUPPORT WO 80249551 *HAWK*EA-Conv#1263259-MakeReadyNonR 80249620 9A-Ok to close RSO-[KELLEHER]-WARNE 80249662 CC; NEWTOWN, PLUMTREES, 29, GIL STE 80249686 CHE *AWC* CD02444 Pole Integrity Re 80249690 SOUTH WINDHAM, WINDHAM, 1145-S, Bri 80249691 *SYS PROJ* CD02444 Pole Integrity R 80249699 WRTN - DM - 1/13 JONES HOLLOW RD MA 80249718 *SYS PROJ* CD02444 Pole Integrity R 80249720 * *AWC* CD02444 Pole Integrity Rep 80249734 CD02444 Pole Integrity Replacement 80249743 *ASP* CD02444 Pole Integrity Replac 80249749 CHE CD02444 Pole Integrity Replacem 80249758 PD-60 LAMPHERE RD WTFD/NEW UG SVC. 80249768 CHE*AWC* CD02444 Pole Integrity Rep 80249773 CHE *AWC* CD02444 Pole Integrity Re 80249792 CD02444 Pole Integrity Replacement 80249816 PALMER ST - NEW GC 32P5 - Install 6 80249824 AMSTON, OLD COLCHESTER, 619, DAWN I 80249838 SC-122 SEASIDE AVE GUILFORD R-35/4. 80249999 *HAWK*JA-Conv#1253388-MakeReadyNonR 80250309 I/R P# 6516 40/2-Rmv OH srv Instl O 80250486 CAR VS POLE-FOIA RESPONSE: NO REPOR 80250498 9A -5 HUBBELL MOUNTAIN RD, SHERMAN80250506 1/28/25 *TURNOVER* ROXBURY (406) RD 80250507 MM75 Exley Rd Plainfield P#3529 Fro 80250586 AE/JLB 9 MANSFIELD PL DARIEN EXT PR 80250587 9/24 JRP - CD01938 -141 Middlefield 80250599 AE/JD; 111 JORDAN LN STAMFORD; STRA 80250620 LD- 2 OAKRIDGE RD, BRISTOL - P10924 80250669 *SYS PROJ* CD02444 Pole Integrity R 80250677 Asplundh - CON40 CDOT47-119 Rt 140 80250678 Asplundh - Shift to 13 Frontier pol 80250797 ASP 8/16 JMS-969 HOPMEADOW ST. SIMS 80250881 5/23 (PETERCL) MORRISON ST, VERNON 80250903 *** TURNOVER 1/28/2025 E# 5580044 2 80250907 CD02444 Pole Integrity Replacement 80250930 *AWC* CD02444 Pole Integrity Replac 80250962 *SYS PROJ* CD02444 Pole Integrity R 80250966 9A- CAR VS POLE - APPROVED 3/26/26 80251020 *D&D* - 111 Taconic Rd, Salisbury P 80251072 *AWC* CD02444 Pole Integrity Replac 80251104 PR 9/9 ASPLUNDH CRP = (9A)..PLYMOUT 80251140 0 STRAITS TPKE, MIDDLEBURY - INST O 80251247 AE/JD; 22 ROBERT CT STAMFORD; EXTEN 80251252 CHE *AWC* CD02444 Pole Integrity Re 80251264 CD02444 Pole Integrity Replacement 80251268 * *AWC* CD02444 Pole Integrity Rep 80251270 DONE PRINT BJQ, GSHN, P#881 (416) O 80251280 *SYS PROJ* CD02444 Pole Integrity R 80251284 CHE*AWC* CD02444 Pole Integrity Rep 80251291 15DD 2/19 MCB - 1200 WOLCOTT ST WTB 80251307 * *AWC* CD02444 Pole Integrity Rep 80251312 CHE *AWC* CD02444 Pole Integrity Re 80251316 CD02444 Pole Integrity Replacement 80251325 CHE *AWC* CD02444 Pole Integrity Re in-service date work order type 2/10/2025 11 Damage Claims OH 7/28/2025 11 Dist Capital or Expense 2/11/2025 11 Damage Claims OH 8/4/2023 11 Asset Mgmt - Specific DESG CT 8/11/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/22/2025 11 Elect Annual Proj - DESG CT 10/23/2025 11 Dist Capital or Expense 1/5/2023 11 Elect Annual Proj - DESG CT 2/28/2025 11 Dist Capital or Expense 2/25/2025 11 Temporary Work DESG CT 4/29/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/27/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 2/3/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 7/22/2025 11 Dist Capital or Expense 2/20/2025 11 Temporary Work DESG CT 4/22/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 9/15/2025 11 Damage Claims OH 4/15/2025 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 4/10/2025 11 Corrective Maint OH Svc 1/29/2025 11 Dist Capital or Expense 3/18/2025 11 Dist Capital or Expense 4/1/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 2/5/2025 11 Corrective Maint OH Svc 9/12/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 5/29/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Dist Capital or Expense 6/10/2025 11 Dist Capital or Expense 9/22/2022 11 Elect Annual Proj - DESG CT 6/14/2022 11 Elect Annual Proj - DESG CT 7/11/2022 11 Elect Annual Proj - DESG CT 6/17/2022 11 Damage Claims OH 6/14/2022 11 Elect Annual Proj - DESG CT 12/29/2022 11 Elect Annual Proj - DESG CT 2/20/2025 11 Damage Claims OH 7/30/2025 11 Corrective Maint OH Svc 6/17/2022 11 Elect Annual Proj - DESG CT 4/11/2023 11 Elect Project - DESG CT 3/4/2025 11 Damage Claims OH 5/28/2025 11 Corrective Maint UG Svc 10/22/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 8/21/2025 11 Dist Capital or Expense 11/25/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 10/9/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 9/11/2025 11 Dist Capital or Expense 12/15/2022 11 Elect Annual Proj - DESG CT 12/13/2023 11 Elect Annual Proj - DESG CT 8/21/2023 11 Elect Annual Proj - DESG CT 4/11/2023 11 Elect Project - DESG CT 10/13/2022 11 Asset Mgmt - Specific DESG CT 4/1/2025 11 Damage Claims OH 2/14/2025 11 Damage Claims OH 2/7/2025 11 Dist Capital or Expense 7/2/2025 11 Corrective Maint UG Svc 4/10/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 3/6/2025 11 Elect Annual Proj - DESG CT 2/25/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 7/8/2022 11 Elect Annual Proj - DESG CT 1/5/2023 11 Elect Annual Proj - DESG CT 9/20/2022 11 Elect Annual Proj - DESG CT 1/11/2023 11 Elect Annual Proj - DESG CT 1/30/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/1/2025 11 Damage Claims OH 9/22/2022 11 Asset Mgmt - Specific DESG CT 11/13/2025 11 Dist Capital or Expense 10/3/2022 11 Damage Claims OH 7/21/2022 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 11/17/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 2/11/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 11/18/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 10/17/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 8/26/2026 9/16/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 8/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 9/16/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 9/16/2026 9/16/2026 1/22/2026 1/22/2026 5/15/2026 5/15/2026 4/20/2026 7/17/2026 364310 Poles and Appurtenance 6,857 7,380 2,797 2,244 422 6,724 3,685 17,566 7,968 1,201 1,294 5,390 3,477 5,055 82 7,080 2,065 5,388 2,922 8,316 958 18,353 15,451 3,076 2,557 3,619 653 9,149 791 1,424 1,089 3,866 6,682 424 1,466 6,195 (311) 3,842 15,393 3,729 12,529 3,009 5,506 3,616 5,677 11,261 430 1,385 1,593 21,936 5,210 11,017 12,297 4,505 918 5,513 1,257 3,552 4,126 6,379 4,427 6,099 4,151 600 7,578 4,241 (478) 85 735 4,290 580 10,330 9,148 10,018 284 4,725 9,572 496 3,260 4,108 19,776 80,774 7,004 5,451 9,475 9,388 4,076 3,840 14,307 7,706 1,715 250 1,648 18,268 4,767 4,158 2,510 742 4,103 3,156 2,469 3,429 3,576 2,523 4,151 365000 Overhead Conductors, Device 5,156 3,819 4,870 708 1,632 2,441 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 140 33 454 17,958 388 469 101 369720 DB/UG Conductors and Devices 370470 Meter Equipment 977 494 2,326 288 446 7,696 360 329 265 619 3,252 39,349 126 1,132 186 767 16,015 1,780 997 5,249 471 71 2,262 265 126 329 3,859 1,034 1,488 242 (1,069) 27,636 60,815 579 2,832 2,030 11,778 1,519 3,009 4,751 1,028 44,919 513 1,392 617 1,149 2,324 358 387 1,692 2,237 408 409 1,920 431 1,001 385 64 157 904 238 (31) (36) 41 37 404 2 413 928 69,897 4,966 28,250 639 376 265 42 (144) 197 81 643 454 136 1,681 3,090 593 637 545 893 1,680 1,947 (478) 774 1,728 133 665 15,326 351 685 527 1,926 1,190 701 2,385 221 3,439 106,233 1,694 1,220 27,699 66,315 7,800 2,305 4,144 5,176 389 128 19,030 88 6,584 2,267 20,786 1,567 443 2,735 453 2,367 2,342 909 380 1,755 349 13,783 1,965 2,860 450 103 1,244 4,177 2,075 251 318 1,591 412 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 12,013 12,317 7,667 2,985 3,002 9,166 3,685 35,525 10,682 1,670 1,683 5,837 3,477 55,352 955 9,101 2,330 6,007 2,922 9,448 1,144 19,120 34,175 5,264 4,033 8,868 653 13,331 1,056 1,982 1,417 8,110 7,780 3,975 1,947 6,195 (1,448) 31,478 76,209 4,308 15,401 5,480 87,181 6,065 9,099 49,867 2,099 46,304 2,346 23,184 5,210 11,634 14,170 6,829 1,730 5,513 1,393 5,234 4,126 9,602 5,019 6,736 5,361 1,492 9,258 6,188 (957) 16,535 3,675 4,290 2,507 11,520 9,849 12,403 893 8,292 134,834 2,063 5,486 5,328 47,475 155,940 38,325 7,755 13,619 15,017 4,076 6,207 16,649 8,615 2,095 2,005 2,446 32,051 6,732 7,017 2,510 845 5,346 3,156 7,309 5,505 3,893 2,523 5,742
  9. Page 29 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 29 of 104 Work Order Number Description 80251343 CD02444 Pole Integrity Replacement 80251348 * *AWC* CD02444 Pole Integrity Rep 80251360 01/27-RSO-[NURSE]-UPPER( 167) 80251363 * *AWC* CD02444 Pole Integrity Rep 80251368 *SYS PROJ* CD02444 Pole Integrity R 80251370 *TOL AWC* CD02444 Pole Integrity Re 80251378 *SYS PROJ* CD02444 Pole Integrity R 80251388 CD02444 Pole Integrity Replacement 80251394 * *AWC* CD02444 Pole Integrity Rep 80251401 * CD02444 Pole Integrity Replaceme 80251403 *SYS PROJ* CD02444 Pole Integrity R 80251404 CHE *AWC*CD02444 Pole Integrity Rep 80251408 *ASP* CD02444 Pole Integrity Replac 80251568 * *AWC* CD02444 Pole Integrity Rep 80251570 PR 9/30 WE 10/7..15 DAY DUE 10/3/22 80251653 *AWC* CD02444 Pole Integrity Replac 80251654 * CD02444 Pole Integrity Replaceme 80251655 CHE*AWC* CD02444 Pole Integrity Rep 80251696 1/29/25 YELLOW TAG KEELER RD BRIDGE 80251710 DMD - 123 N MAIN ST - MTOWN - P898 80251802 CD01912 Segment 03, LAG, Switches, 80251836 1/29/25 TURNOVER HEMLOCK (280) RD 80251929 DG P#513 FREEDLEY RD POMFRET HBV RS 80251948 DG P#1532 FOX HILL RD POMFRET RPLC' 80251950 CHE*AWC* CD02444 Pole Integrity Rep 80251961 CHE*AWC* CD02444 Pole Integrity Rep 80251967 CD02444 Pole Integrity Replacement 80251968 CHE *AWC* CD02444 Pole Integrity Re 80251976 DONE 1/29 - TREE - BROKEN POLE #125 80252002 CHE*AWC* CD02444 Pole Integrity Rep 80252006 TURNOVER 1/30/25 E# 5581651 9 HAVI 80252009 *SYS PROJ* CD02444 Pole Integrity R 80252013 EVW - DONE 1/29 - TREE - BROKEN POL 80252018 *SYS PROJ* CD02444 Pole Integrity R 80252022 01/30/25 - 9A - Boston Post Rd Wate 80252023 *SYSTEM PROJECTS* CD02444 Pole Inte 80252024 *SYS PROJ* CD02444 Pole Integrity R 80252027 APPT 4/24 LD - 151 SOUTHINGTON RD, 80252033 *ASP* CD02444 Pole Integrity Replac 80252038 *SYS PROJ* CD02444 Pole Integrity R 80252039 Alden One *TOL AWC* CD02444 Pole In 80252040 CD02444 Pole Integrity Replacement 80252057 CD02444 Pole Integrity Replacement 80252065 *ASP* CD02444 Pole Integrity Replac 80252151 GCC / SPICER HILL ROAD, LEDYARD 80252287 *AWC* CD02444 Pole Integrity Replac 80252293 LD- 944 HIGHLAND AVE , CHESHIRE 80252315 15D 6/19 JRP - 279 Queen St SOG In 80252354 150 NAUBUC AVE GLASTONBURY - SHIFT 80252363 *TOL AWC* CD02444 Pole Integrity Re 80252365 *SYS PROJ* CD02444 Pole Integrity R 80252368 Appr Grp *TOL AWC* CD02444 Pole Int 80252370 CHE*AWC* CD02444 Pole Integrity Rpl 80252371 *TOL AWC* CD02444 Pole Integrity Re 80252372 *EAST HAMPTON AWC* CD02444 Pole Int 80252396 written complete 9A - Car vs. Pole 80252425 TL - BRUSH HILL, #51 HADLYME // REP 80252562 DJM. 158 COMPO RD N WESTPORT. NEW 4 80252599 9A- CAR VS POLE - APPROVED 4/16 80252609 1/30/25 FRANKLIN ST EXT DANBURY 80252633 CD02444 Pole Integrity Replacement 80252670 *AWC* CD02444 Pole Integrity Replac 80252695 DONE PRINT BJQ, KENT, P #2217 (144) 80252728 *ASP* CD02444 Pole Integrity Replac 80252740 CD02444 Pole Integrity Replacement 80252745 CHE CD02444 Pole Integrity Replacem 80252756 CHE *AWC* CD02444 Pole Integrity Re 80252782 *SYSTEM PROJECTS* CD02444 Pole Inte 80252791 *EAST HAMPTON AWC* CD02444 Pole Int 80252793 CD02444 Pole Integrity Replacement 80252795 *EAST HAMPTON AWC* CD02444 Pole Int 80252800 *HAWKEYE* RA PROJECT CD01570 2022 P 80252804 Project CDOT 172-517 Bridge 00301 I 80252807 *EAST HAMPTON AWC* CD02444 Pole Int 80252809 CD02444 Pole Integrity Replacement 80252810 *EAST HAMPTON AWC* CD02444 Pole Int 80252813 *EAST HAMPTON AWC* CD02444 Pole Int 80252814 *AWC* CD02444 Pole Integrity Replac 80252936 TRIANGLE( 64) ST STE 1-- P270 80252943 * 15D PM-54 FOWLER AVE DURHAM-NEW 80252950 9A CAR VS EVERSOURCE P 1453 - APPRO 80252954 CAR VS POLE - APPROVED 4/9/25 80252957 JTR, 105 NEWINGTON AVE - HARTFORD, 80252961 160 MAIN ST BROAD BROOK CT 80252975 PRINT EVW - P1665 Limerock Rd Recon 80253003 TW - CD01225 (AIMS Seg 13, Part 3 o 80253080 DMD - SVT - CCLUB RD / HIGBY RD - M 80253128 *ASP* CD02444 Pole Integrity Replac 80253131 LD- 9A- 18 HORACE ST, NEW BRITAIN 80253132 *ASP* CD02444 Pole Integrity Replac 80253155 *EAST HAMPTON AWC* CD02444 Pole Int 80253156 CHE CD02444 Pole Integrity Replacem 80253162 MCB - WTG FOR PD RPT 2/3/25 (TH)2/2 80253164 *ASP* CD02444 Pole Integrity Replac 80253166 *EAST HAMPTON AWC* CD02444 Pole Int 80253171 TL - HAMBURG RD, REF. #249 LYME // 80253173 *D&D* FA - Conv. 1662282 - Make Rea 80253174 *D&D* FA - Conv. 1662282 - Make Rea 80253185 *EAST HAMPTON AWC* CD02444 Pole Int 80253192 *ASP* CD02444 Pole Integrity Replac 80253196 9A - CAR VS FRONTIER POLE 5928 - AP 80253204 *EAST HAMPTON AWC* CD02444 Pole Int 80253218 CD02444 Pole Integrity Replacement 80253222 DAISYMAE - (57) SPRING ST - PORTLAN 80253230 *EAST HAMPTON AWC* CD02444 Pole Int in-service date work order type 8/27/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 8/27/2025 11 Dist Capital or Expense 8/7/2025 11 Elect Annual Proj - DESG CT 9/11/2025 11 Dist Capital or Expense 11/7/2025 11 Dist Capital or Expense 11/19/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 9/16/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/20/2025 11 Dist Capital or Expense 10/21/2022 11 Elect Annual Proj - DESG CT 12/1/2025 11 Dist Capital or Expense 11/20/2025 11 Dist Capital or Expense 11/18/2025 11 Dist Capital or Expense 2/26/2025 11 Corrective Maint OH Lines 7/21/2025 11 Elect Annual Proj - DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Damage Claims OH 2/4/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 7/12/2025 11 Dist Capital or Expense 11/19/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 8/21/2025 11 Elect Annual Proj - DESG CT 2/20/2025 11 Elect Annual Proj - DESG CT 9/9/2025 11 Dist Capital or Expense 2/27/2025 11 Damage Claims OH 10/15/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 11/25/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 6/27/2022 11 Elect Annual Proj - DESG CT 11/13/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 7/25/2025 11 Dist Capital or Expense 10/2/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense 6/15/2022 11 Damage Claims OH 6/8/2023 11 Asset Mgmt - Specific DESG CT 6/6/2025 11 Dist Capital or Expense 8/29/2025 11 Damage Claims OH 1/31/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 2/13/2025 11 Dist Capital or Expense 12/17/2025 11 Dist Capital or Expense 6/25/2025 11 Dist Capital or Expense 10/17/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 6/20/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 6/16/2025 11 Elect Annual Proj - DESG CT 1/11/2023 11 Elect Annual Proj - DESG CT 8/1/2023 11 Elect Annual Proj - DESG CT 11/16/2025 11 Dist Capital or Expense 12/4/2025 11 Dist Capital or Expense 8/20/2025 11 Dist Capital or Expense 11/16/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 2/3/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 3/10/2025 11 Damage Claims OH 3/28/2025 11 Damage Claims OH 8/1/2025 11 Dist Capital or Expense 2/5/2025 11 Elect Annual Proj - DESG CT 5/15/2025 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 4/1/2025 11 Elect Annual Proj - DESG CT 12/17/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 12/17/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 2/4/2025 11 Damage Claims OH 12/16/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 12/8/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 2/4/2025 11 Damage Claims OH 11/21/2025 11 Dist Capital or Expense 7/2/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 4/20/2026 1/22/2026 4/20/2026 4/20/2026 2/13/2026 4/20/2026 4/20/2026 9/16/2026 9/16/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 9/16/2026 2/13/2026 9/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 9/16/2026 5/15/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 8/26/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 4/20/2026 5/15/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 7/17/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 3,835 2,595 3,549 3,679 3,909 122 2,207 3,080 2,664 7,980 4,300 2,394 3,903 2,627 71 7,163 2,331 4,184 626 1,246 2,942 9,318 5,777 138 13,562 6,088 1,772 2,364 11,793 1,492 5,954 3,591 9,132 4,211 2,886 7,937 3,720 12,172 3,196 2,705 4,405 1,560 3,450 8,986 11,617 3,060 5,200 4,092 4,256 4,891 2,858 5,216 4,116 3,009 3,131 4,025 1,900 5,449 5,373 5,405 2,313 3,471 1,397 2,277 1,836 1,818 2,465 21,908 7,429 2,384 7,420 9,394 8,334 2,473 61,960 159 9,133 539 10,012 14 2,401 5,097 4,352 5,821 17,469 64,119 1,089 3,521 16,889 2,355 2,905 1,087 20,162 2,781 3,348 25,805 (77) (75) 11,463 9,904 2,029 2,280 2,267 3,410 1,694 365000 Overhead Conductors, Device 2,728 366700 DB/UG Conduits and Vaults 1,325 390 409 40 367720 DB/UG Conductors and devices 368330 Equipment Overhead 156 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 91 13 1,243 1,780 2,742 4,352 667 1,569 3,071 277 3,549 779 5,584 381 70,730 1,217 781 277 37 957 1,084 4,633 363 52 319 1,460 2,241 9,195 2,883 4,036 7,616 2,396 1,312 317 299 1,121 104 238 333 1,296 2,818 1,457 199 243 63 1,684 12,465 2,920 2,201 672 1,173 38 1,267 265 2,418 878 1,560 2,956 141 5,515 25 (0) 262 307 584 1,888 169 845 10,888 288 923 579 1,774 20,215 4,430 43 8,305 288 16,396 324 330 4,575 618 629 27,491 148,716 30 722 2,491 2,147 749 2,100 2,538 13,118 (1,958) (1,416) 2,071 792 964 943 1,274 135 296 62,478 11 20 240 93 283 3,117 2,165 2,644 2,293 3,459 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,719 2,595 4,965 4,069 4,318 175 2,207 4,322 4,445 11,389 8,652 2,394 5,472 5,698 348 10,712 2,331 4,963 6,209 2,027 73,672 10,534 6,558 415 13,562 6,088 2,728 3,500 16,746 1,492 7,413 5,832 18,644 7,094 7,221 15,553 6,116 13,483 3,196 3,825 4,509 1,798 3,982 10,282 14,678 4,580 5,200 7,621 16,759 7,811 5,059 5,216 4,116 4,276 3,397 6,443 6,163 12,831 5,373 5,989 2,313 5,359 1,566 3,122 1,836 1,818 2,465 32,930 8,012 3,307 7,999 11,168 91,027 2,473 66,389 213 17,438 828 26,407 598 2,731 9,672 4,970 6,450 44,960 212,928 1,120 4,526 16,889 7,963 5,052 1,087 23,076 7,525 5,885 44,675 (2,036) (1,490) 11,463 11,975 2,821 3,244 3,210 4,684 1,694
  10. Page 30 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 30 of 104 Work Order Number Description 80253231 *AWC* CD02444 Pole Integrity Replac 80253251 *SYS PROJ* CD02444 Pole Integrity R 80253259 Appr Grp-01/26-RSO-Replace (4) pole 80253262 *ASP* CD02444 Pole Integrity Replac 80253272 CHE CD02444 Pole Integrity Replacem 80253276 PD-4 1ST AVE WATERFORD/REPLACE DEFE 80253280 SL - TD-941 - 108 McClintock St, NB 80253295 CHE CD02444 Pole Integrity Replacem 80253300 *ASP* CD02444 Pole Integrity Replac 80253305 15D 12/3 JRP - CD02353-37 Hunters L 80253326 CHE CD02444 Pole Integrity Replacem 80253334 *D&D* ML - Conv. 1657243 Make Ready 80253335 CD02444 Pole Integrity Replacement 80253344 wrttn, BM; 635 OXFORD RD (AKA 10 PE 80253369 9A- CAR VS POLE- APPROVED 4/14/26 80253375 9A-CAR VS POLE -Unable to bill _ To 80253408 9A - PLOW VS FRONTIER POLE 799 - A 80253410 MATERIAL MM - 104 OLD BOSTON RD -80253416 02/03/25 - 9A - W CENTER (145) ST 80253452 AE/JD; 54 ROSE PARK AVE STAMFORD; R 80253490 P COLUMBIA, WEST, 88, Derek Rudd 80253511 *TORRINGTON AWC* BJQ - CD02444 Pole 80253524 9A: JRP - Westfield Dr P#5983 Cut & 80253621 Project CDOT 172-517 Bridge 01444 80253657 9A RF:71 BOSTON POST RD, DARIEN:REM 80253711 EVW - (Site Visit) - 9A - 230 Coe S 80253716 *D&D*CD01570 - Class 5 Backbone Pol 80253721 *D&D*CD01570 - Class 5 Backbone Pol 80253723 *D&D*CD01570 - Class 5 Backbone Pol 80253730 *D&D*CD01570 - Class 5 Backbone Pol 80253734 *D&D*CD01570 - Class 5 Backbone Pol 80253788 *D&D*CD01570 - Class 5 Backbone Pol 80253799 *D&D*CD01570 - Class 5 Backbone Pol 80253801 *D&D*CD01570 - Class 5 Backbone Pol 80253810 EVW - 118 Mountain Rd, Winsted P#15 80253848 *D&D* CD01570 - Class 5 Backbone Po 80253854 *D&D*CD01570 - Class 5 Backbone Pol 80253871 PONS 7/6 JSG/Canton--West St. 1482 80253872 *D&D*CD01570 - Class 5 Backbone Pol 80253949 15D 10/29 AP- 710 W Main St, New Br 80253959 *ASP* CD02444 Pole Integrity Replac 80253965 *TORRINGTON AWC* CD02444 Pole Integ 80254036 DG P#5100 1003 RT 169 FRNTR POLE SE 80254039 BRANFORD, MONTOWESE, 115/NEW 3000A 80254118 *D&D* 376 S Canaan Rd, Falls Villag 80254157 *ASP* CD02444 Pole Integrity Replac 80254164 *ASP* CD02444 Pole Integrity Replac 80254196 CHE CD02444 Pole Integrity Replacem 80254197 *ASP* CD02444 Pole Integrity Replac 80254198 *ASP* CD02444 Pole Integrity Replac 80254199 CHE*AWC* CD02444 Pole Integrity Rep 80254293 WRTN COMPLETE BEEBE( 133) RD -- 3 80254301 DAISYMAE - POST CONST - P367, P368, 80254332 *Shift wires - 62 Lake Drive Madiso 80254338 ASAP DJM. 134 CROSS HWY WESTPORT. T 80254343 9A - 2/5 - RSO - burk - SILVER( 80254609 **300 LEETES ISLAND RD, BRANFORD P5 80254641 P EAST HADDAM, ORCHARD, 16,.. 80254699 JDB 95 NEW CANAAN AVE NORWALK, SHIF 80254751 CAR VS POLE 5253 - REPLACES WO 6249 80255006 KTI MPB; 801 STRONGTOWN RD, SOUTHBU 80255015 *D&D* KL - Conv. 1662265 - Make Rea 80255052 INT-104434 WO# 20051358 NEW LONDON, 80255080 AC-37 MERLIN AVE, NEW FAIRFIELD-P#4 80255112 DONE PRINT BJQ, GOSHEN, P #1378 (33 80255119 *AWC* CD02444 Pole Integrity Replac 80255121 MCB - 9A TURNOVER MEADOW ( 333) ST 80255123 CD02444 Pole Integrity Replacement 80255133 DONE 2/4 - AWC TURNOVER - TREE DOWN 80255136 *ASP* CD02444 Pole Integrity Replac 80255153 CD02444 Pole Integrity Replacement 80255170 *ASP* CD02444 Pole Integrity Replac 80255176 BRANFORD, DORR, 8/New pole,convert 80255338 CAR V POLE- NEED PR 6.16.22 80255432 IVORYTON, HICKORY LN//REPLACE CRACK 80255434 CD02444 Pole Integrity Replacement 80255464 (LC) DJM. 257 RIVERSIDE AVE WESTPOR 80255468 Appr Grp Crystal Lake Rd 98, Elling 80255504 ALL WORK COMPLETE - GP - Replace Po 80255515 DONE PRINT JSG/Colebrook-Prock Hill 80255518 P.2150 287 Litchfield Tpk Washingto 80255538 TL - ISLANDA CT, #20 EAST LYME // I 80255697 20 Northrop Rd, Bethany P#2887 FTR 80255717 APPT 8/1*WTBY AWC*45 BENEDICT ST WT 80255734 LD - 390 MYRTLE ST, BRISTOL -P13052 80255739 9A - CAR VS FRONTIER POLE - APPROVE 80255755 POST CONST> - MAR - 9A - 204 ANDREW 80255758 MPB; 6/26/23 BIRCH (14) DR -- 1495, 80255767 CC; NEWTOWN, POLE BRIDGE, FTR POLE 80255821 ALL WORK COMPLETE - GP - Replace Po 80255965 COMP CCC 12/21/22 - (9A) 05.15.22 80256148 *COMP IN FIELD* MM - 107 SHARP HILL 80256183 mcb - WTG FOR PD RPT 2/7/25 (TH) 2/ 80256283 MUNI Pending/ AldenONeJMS- APPT 3/1 80256292 DG P#1076 59 WALKER LN WOODSTOCK CL 80256410 MG-P#16- 359,361,363 SOUTH ST BROOK 80256411 ZK - E HTFD (DG Upgrade) - 6 EVANS 80256451 DGP#46 MECHANICS ST PUTNAM FRNTR PO 80256459 ASAP DJM. 122 HARBOR RD WESTPORT. L 80256462 CAR VS POLE-APPROVED 3/26/26 80256469 AC-PDNB- 9A-356 CHESTNUT LAND RD, 80256477 9A CAR VS POLE - APPROVED 3/24/2026 80256493 DG P#966 CHURCH ST THOMPSON FRNTR P 80256495 DONE PRINT CRP - 12/12 [BOISCBP] 80256498 9A - CAR VS POLE - APPROVED 3/26/26 in-service date work order type 11/18/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 12/16/2025 11 Dist Capital or Expense 10/27/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense 4/22/2025 11 Elect Annual Proj - DESG CT 11/12/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 12/18/2025 11 Corrective Maint OH Svc 10/29/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 2/7/2025 11 Damage Claims OH 3/14/2025 11 Damage Claims OH 2/25/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 2/7/2025 11 Damage Claims OH 5/5/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 6/30/2023 11 Elect Annual Proj - DESG CT 6/1/2022 11 Damage Claims OH 6/2/2022 11 Damage Claims OH 2/21/2023 11 Elect Annual Proj - DESG CT 10/11/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 2/21/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 10/5/2022 11 Elect Annual Proj - DESG CT 2/21/2023 11 Elect Annual Proj - DESG CT 6/16/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 10/11/2022 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 10/12/2022 11 Elect Annual Proj - DESG CT 1/25/2024 11 Elect Annual Proj - DESG CT 10/5/2022 11 Asset Mgmt - Specific DESG CT 11/26/2025 11 Dist Capital or Expense 12/17/2025 11 Dist Capital or Expense 10/29/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 3/17/2025 11 Private Work - No Co Asset 2/11/2025 11 Damage Claims OH 4/9/2025 11 Dist Capital or Expense 5/30/2025 11 Dist Capital or Expense 6/17/2022 11 Elect Annual Proj - DESG CT 6/2/2022 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 10/27/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 8/18/2025 11 Elect Annual Proj - DESG CT 2/27/2025 11 Elect Annual Proj - DESG CT 11/26/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 12/16/2025 11 Dist Capital or Expense 12/29/2022 11 Elect Annual Proj - DESG CT 6/14/2022 11 Damage Claims OH 4/30/2025 11 Corrective Maint OH Lines 11/19/2025 11 Dist Capital or Expense 9/11/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 4/2/2025 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 1/30/2024 11 Elect Annual Proj - DESG CT 2/24/2025 11 Dist Capital or Expense 8/1/2025 11 Corrective Maint UG Svc 3/3/2025 11 Dist Capital or Expense 3/5/2025 11 Damage Claims OH 2/27/2025 11 Damage Claims OH 9/16/2025 11 Dist Capital or Expense 3/5/2025 11 Elect Annual Proj - DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 5/5/2023 11 Damage Claims OH 3/6/2025 11 Dist Capital or Expense 2/11/2025 11 Damage Claims OH 9/22/2025 11 Corrective Maint OH Svc 6/23/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 3/18/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Damage Claims OH 4/14/2025 11 Dist Capital or Expense 3/27/2025 11 Damage Claims OH 3/28/2025 11 Damage Claims OH 4/23/2025 11 Damage Claims OH 2/26/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 3/11/2025 11 Damage Claims OH Subsequent Close Date 1/22/2026 8/2/2026 9/16/2026 7/17/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 2/13/2026 8/26/2026 4/20/2026 1/22/2026 9/16/2026 1/22/2026 5/15/2026 4/20/2026 1/22/2026 4/20/2026 4/20/2026 7/17/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 7/17/2026 364310 Poles and Appurtenance 1,972 3,951 13,471 6,425 9,861 2,571 6,316 5,756 4,444 10,338 2,839 8,365 2,186 6,048 1,426 7,483 295 17,984 20,752 3,453 757 2,673 10,298 8,393 9,692 2,966 4,919 5,377 6,044 4,069 6,096 5,001 4,752 3,856 298 3,619 1,510 2,538 5,119 3,305 3,186 3,108 258 3,292 14,910 5,244 6,391 3,200 1,826 6,716 1,279 9,071 4,032 383 4,289 6,542 1,611 138 593 47 2,706 173 2,067 3,188 175 582 8,829 2,427 1,277 9,662 3,816 4,647 81 1,598 518 2,540 1,690 484 7,640 1,010 1,324 4,115 119 3,043 105 5,789 1,952 5,817 1,168 (178) 2,188 2,060 19,405 3,814 6,710 10,493 547 3,544 11,161 564 307 12,187 62 5,244 1,450 365000 Overhead Conductors, Device 824 1,513 1,062 1,939 9,729 392 47,715 761 1,155 93,573 471 1,951 7,764 8,051 2,368 1,138 8,334 1,604 3,273 792 965 48,727 4,824 934 1,146 (12) 51 1,830 1,462 (3) 1,705 587 97 524 312 189 (34) 3,337 1,867 921 606 5,607 7,130 3,974 884 2,766 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 29,523 1,084 170 685 1,236 279 420 20 1,695 4,060 76,601 (167) (0) 2 (2) (3) (0) (0) 67 108 (2) (1) 543 724 7,436 940 3,560 1,237 3,366 (16) 2,127 2,931 435 (170) 413 13,604 999 1,015 57 510 563 1,069 4,332 1,192 73 587 10,073 114 948 89 3,975 259 436 825 4,576 2,908 3,764 114 697 60 2,332 2,439 117 143 885 330 1,896 360 497 236 2,274 1,068 (28) 238 892 2,467 1,429 5,634 772 1,384 2,857 132 1,210 26 1,829 784 5,694 841 1,649 62 486 238 108 21 897 59 82 1,584 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 2,796 5,464 14,533 8,364 19,590 2,963 54,030 6,517 5,599 133,435 3,310 10,316 2,186 16,303 10,161 9,851 1,712 28,454 22,355 3,453 8,090 3,464 11,264 133,721 14,349 3,900 6,064 5,364 6,096 5,964 7,555 4,998 6,565 4,443 395 4,143 1,820 2,727 5,084 8,126 5,053 4,029 4,424 21,663 22,024 9,218 7,275 5,966 1,826 8,843 1,279 12,002 4,466 214 5,700 20,146 1,611 1,720 1,156 47 4,435 14,578 3,374 3,188 1,819 670 12,804 2,427 2,102 14,238 6,724 8,411 980 2,295 578 2,540 10,557 484 11,728 1,128 1,467 5,548 449 5,178 466 6,286 2,188 8,091 2,344 (206) 2,425 2,952 21,873 6,161 6,710 16,127 1,379 4,929 14,018 696 1,599 12,187 1,672 5,244 3,279

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)